Diversion tunnel and construction arrangement method of diversion tunnel
The embodiment of the invention provides a diversion tunnel and a construction arrangement method of the diversion tunnel, and relates to the technical field of diversion buildings of water conservancy and hydropower engineering. The construction arrangement method of the diversion tunnel is used for manufacturing the diversion tunnel, a gate assembly in the diversion tunnel is located between a diversion tunnel body and a construction adit, and the gate assembly can move between a first position and a second position; the gate assembly is located in the diversion tunnel body and located on the side, close to the diversion inlet, of the communication opening so as to block the diversion tunnel body, when the gate assembly is located at the second position, the gate assembly blocks the communication opening, it is avoided that the gate assembly is arranged at the diversion inlet of the diversion tunnel body, and therefore the project amount of construction at the diversion inlet can be reduced, and the construction efficiency is improved. And the construction difficulty at the diversion inlet is also reduced.
本发明的实施例提供了一种导流隧洞及导流隧洞的施工布置方法,涉及水利水电工程导流建筑物技术领域。导流隧洞的施工布置方法用于制作导流隧洞,导流隧洞中闸门组件位于导流隧洞本体与施工支洞之间,并且闸门组件能够在第一位置与第二位置之间运动,当闸门组件处于第一位置时,闸门组件位于导流隧洞本体内且位于连通口靠近导流入口的一侧,以封堵导流隧洞本体,当闸门组件处于第二位置时,闸门组件封堵连通口,避免了将闸门组件布置在导流隧洞本体的导流入口出,从而能够降低在导流入口施工的工程量,也降低了导流入口处的施工难度。
Diversion tunnel and construction arrangement method of diversion tunnel
The embodiment of the invention provides a diversion tunnel and a construction arrangement method of the diversion tunnel, and relates to the technical field of diversion buildings of water conservancy and hydropower engineering. The construction arrangement method of the diversion tunnel is used for manufacturing the diversion tunnel, a gate assembly in the diversion tunnel is located between a diversion tunnel body and a construction adit, and the gate assembly can move between a first position and a second position; the gate assembly is located in the diversion tunnel body and located on the side, close to the diversion inlet, of the communication opening so as to block the diversion tunnel body, when the gate assembly is located at the second position, the gate assembly blocks the communication opening, it is avoided that the gate assembly is arranged at the diversion inlet of the diversion tunnel body, and therefore the project amount of construction at the diversion inlet can be reduced, and the construction efficiency is improved. And the construction difficulty at the diversion inlet is also reduced.
本发明的实施例提供了一种导流隧洞及导流隧洞的施工布置方法,涉及水利水电工程导流建筑物技术领域。导流隧洞的施工布置方法用于制作导流隧洞,导流隧洞中闸门组件位于导流隧洞本体与施工支洞之间,并且闸门组件能够在第一位置与第二位置之间运动,当闸门组件处于第一位置时,闸门组件位于导流隧洞本体内且位于连通口靠近导流入口的一侧,以封堵导流隧洞本体,当闸门组件处于第二位置时,闸门组件封堵连通口,避免了将闸门组件布置在导流隧洞本体的导流入口出,从而能够降低在导流入口施工的工程量,也降低了导流入口处的施工难度。
Diversion tunnel and construction arrangement method of diversion tunnel
一种导流隧洞及导流隧洞的施工布置方法
ZHANG FEI (author) / LIU QIWEN (author) / LUO YINGGANG (author) / WEN ZHIYING (author) / ZHANG CHEN (author)
2023-05-09
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction of Maraetai diversion tunnel
Engineering Index Backfile | 1950
|Power generation tailrace tunnel and diversion tunnel combined arrangement method
European Patent Office | 2023
|Construction a diversion tunnel in Hokkaido
Tema Archive | 1999
|