A platform for research: civil engineering, architecture and urbanism
Prefabricated bent cap wet joint construction hanging formwork system
The invention relates to the technical field of building construction, and discloses a prefabricated cover beam wet joint construction suspended formwork system which comprises an upper beam, a lower beam, a lower beam, a lower beam and a lower beam. The bottom plate assembly is used for being arranged below the bent cap, corresponds to the joint and serves as a supporting piece; the upper end and the lower end of the connecting piece are connected with the upper beam and the bottom plate assembly respectively; and the template assembly is arranged on the bottom plate assembly and is used for sealing the bottom and the side part of the joint, and the template assembly and the joint form a material injection space together. The construction method has the advantages that the technical effects that a large number of supports need to be erected and resources are wasted during traditional wet joint formwork construction are avoided, so that the construction time is effectively shortened, and the construction cost is saved are achieved, meanwhile, the trouble caused by capping beam prefabrication and installation deviation can be overcome, and demolding construction after pouring is also convenient.
本发明涉及建筑施工技术领域,公开了一种预制盖梁湿接缝施工吊模系统,包括了:上梁,所述上梁用于搭设在两侧的盖梁上,作为承重件;以及底板组件,所述底板组件用于设置在盖梁下与接缝对应,作为支撑件;以及连接件,所述连接件上下两端分别与所述上梁、所述底板组件连接;以及模板组件,所述模板组件置于所述底板组件上,用于将接缝的底部与侧部封闭,与接缝共同形成注料空间。本发明具有避免了传统湿接缝模板施工时需要大量搭设支架,资源浪费,从而有效缩短施工时间,节约施工成本的技术效果,同时可以克服盖梁预制和安装偏差带来的麻烦,浇筑后脱膜施工也方便。
Prefabricated bent cap wet joint construction hanging formwork system
The invention relates to the technical field of building construction, and discloses a prefabricated cover beam wet joint construction suspended formwork system which comprises an upper beam, a lower beam, a lower beam, a lower beam and a lower beam. The bottom plate assembly is used for being arranged below the bent cap, corresponds to the joint and serves as a supporting piece; the upper end and the lower end of the connecting piece are connected with the upper beam and the bottom plate assembly respectively; and the template assembly is arranged on the bottom plate assembly and is used for sealing the bottom and the side part of the joint, and the template assembly and the joint form a material injection space together. The construction method has the advantages that the technical effects that a large number of supports need to be erected and resources are wasted during traditional wet joint formwork construction are avoided, so that the construction time is effectively shortened, and the construction cost is saved are achieved, meanwhile, the trouble caused by capping beam prefabrication and installation deviation can be overcome, and demolding construction after pouring is also convenient.
本发明涉及建筑施工技术领域,公开了一种预制盖梁湿接缝施工吊模系统,包括了:上梁,所述上梁用于搭设在两侧的盖梁上,作为承重件;以及底板组件,所述底板组件用于设置在盖梁下与接缝对应,作为支撑件;以及连接件,所述连接件上下两端分别与所述上梁、所述底板组件连接;以及模板组件,所述模板组件置于所述底板组件上,用于将接缝的底部与侧部封闭,与接缝共同形成注料空间。本发明具有避免了传统湿接缝模板施工时需要大量搭设支架,资源浪费,从而有效缩短施工时间,节约施工成本的技术效果,同时可以克服盖梁预制和安装偏差带来的麻烦,浇筑后脱膜施工也方便。
Prefabricated bent cap wet joint construction hanging formwork system
一种预制盖梁湿接缝施工吊模系统
GONG JIN (author) / YAN KE (author) / XIE QI (author) / LI XIAOHAN (author) / YANG HUI (author) / WU JUNLIN (author) / LIU JIAJIE (author)
2023-06-23
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Telescopic hanging formwork for wet joint construction of large-section prefabricated bent cap
European Patent Office | 2024
|Prefabricated assembly type bent cap formwork system and construction method
European Patent Office | 2024
|Formwork of prefabricated column connecting joint and joint construction method using formwork
European Patent Office | 2022
|Prefabricated bent cap side formwork pre-positioning device and construction method thereof
European Patent Office | 2021
|