Post-grouting prefabricated constructional column component and construction method thereof
The invention discloses a post-grouting prefabricated constructional column member, which is used for being mounted in a wall body and comprises more than one member main reinforcements which are annularly distributed, stirrups which are used for binding the member main reinforcements and form pre-buried spaces in the middles of the member main reinforcements, and more than one anchoring steel bars which transversely penetrate through the member main reinforcements and extend towards two sides, the grouting pipe is inserted into the pre-buried space of the component main reinforcement, the concrete structure is formed in a pouring mode and wraps the component main reinforcement, the anchoring reinforcement extends out of the concrete structure, and a plurality of grouting branch pipes are arranged on the grouting pipe. Compared with cast-in-place, the quality of the post-grouting prefabricated constructional column component is better guaranteed, the post-grouting prefabricated constructional column component can be effectively controlled, materials used for turnover are reduced, environmental protection is facilitated, and material input is reduced.
本发明公开了一种后注浆预制构造柱构件,用于安装在墙体内,包括有一根以上的、呈环布的构件主筋,及对构件主筋进行绑扎的、在构件主筋中部形成预埋空间的箍筋,及一根以上的、横向贯穿构件主筋的、向两侧延伸的锚固钢筋,及插入于构件主筋的预埋空间内的注浆管,及浇筑成型、并对构件主筋形成包裹的混凝土结构,该锚固钢筋延伸至混凝土结构外,该注浆管上设有若干注浆支管;该后注浆预制构造柱构件质量比现场浇筑更有保证,更可以得到有效控制,且用于周转的材料减少,有利于环保,减少材料投入。
Post-grouting prefabricated constructional column component and construction method thereof
The invention discloses a post-grouting prefabricated constructional column member, which is used for being mounted in a wall body and comprises more than one member main reinforcements which are annularly distributed, stirrups which are used for binding the member main reinforcements and form pre-buried spaces in the middles of the member main reinforcements, and more than one anchoring steel bars which transversely penetrate through the member main reinforcements and extend towards two sides, the grouting pipe is inserted into the pre-buried space of the component main reinforcement, the concrete structure is formed in a pouring mode and wraps the component main reinforcement, the anchoring reinforcement extends out of the concrete structure, and a plurality of grouting branch pipes are arranged on the grouting pipe. Compared with cast-in-place, the quality of the post-grouting prefabricated constructional column component is better guaranteed, the post-grouting prefabricated constructional column component can be effectively controlled, materials used for turnover are reduced, environmental protection is facilitated, and material input is reduced.
本发明公开了一种后注浆预制构造柱构件,用于安装在墙体内,包括有一根以上的、呈环布的构件主筋,及对构件主筋进行绑扎的、在构件主筋中部形成预埋空间的箍筋,及一根以上的、横向贯穿构件主筋的、向两侧延伸的锚固钢筋,及插入于构件主筋的预埋空间内的注浆管,及浇筑成型、并对构件主筋形成包裹的混凝土结构,该锚固钢筋延伸至混凝土结构外,该注浆管上设有若干注浆支管;该后注浆预制构造柱构件质量比现场浇筑更有保证,更可以得到有效控制,且用于周转的材料减少,有利于环保,减少材料投入。
Post-grouting prefabricated constructional column component and construction method thereof
一种后注浆预制构造柱构件及其施工方法
ZHONG WENXIANG (author) / XU BIN (author) / FENG CHENGWEN (author) / LI QIYI (author) / CHEN YUBO (author) / LIU BO (author) / XIAN GUOJIE (author) / ZHAN QIUQIONG (author) / LIU XUEMEI (author)
2023-06-23
Patent
Electronic Resource
Chinese
Constructional column grouting device for constructional engineering
European Patent Office | 2020
European Patent Office | 2022
|Construction method of novel fully-prefabricated constructional column
European Patent Office | 2022
|Prefabricated building concrete prefabricated constructional column
European Patent Office | 2023
|Non-stubble prefabricated constructional column structure and wall construction method thereof
European Patent Office | 2024
|