A platform for research: civil engineering, architecture and urbanism
Hydropower station gate dredging device
The invention discloses a hydropower station gate dredging device in the technical field of hydropower engineering, which comprises a gate, mounting beams, a mounting plate, a filter box and a transport box, the mounting beams are fixedly connected between the upper side and the lower side of the inner side wall of the gate, and the mounting plate is located between the mounting beams; the filter box is fixedly connected to the left side of the top of the mounting beam on the upper side through bolts, and the transport box is fixedly connected to the right side of the top of the mounting beam on the upper side through bolts. The operation of the hydropower station is not influenced, the economic loss is reduced, meanwhile, the danger of dredging is also reduced, the use range of dredging equipment is not limited any more, cement separation treatment can be carried out on the cleaned sludge, the sludge cleaning efficiency is improved, meanwhile, the loss of water resources is avoided, and the waste of the water resources is avoided.
本发明公开了水电工程技术领域的一种水电站闸口清淤装置,包括闸口、安装梁、安装板、过滤箱和运输箱,所述安装梁固定连接在所述闸口的内侧壁上下两侧之间,所述安装板位于所述安装梁的之间,所述过滤箱通过螺栓固定连接在上侧所述安装梁的顶部左侧,所述运输箱通过螺栓固定连接在上侧所述安装梁的顶部右侧,该水电站闸口清淤装置,结构设计合理,能够提高清淤的质量,能够在水电站运行的情况下进行清淤工作,不会影响水电站的运行,降低经济损失,同时也降低了清淤的危险性,清淤设备的使用范围不再受限,能够对清理的淤泥进行水泥分离处理,在提高淤泥清理的效率时还同时避免的水资源的流失,避免浪费水资源。
Hydropower station gate dredging device
The invention discloses a hydropower station gate dredging device in the technical field of hydropower engineering, which comprises a gate, mounting beams, a mounting plate, a filter box and a transport box, the mounting beams are fixedly connected between the upper side and the lower side of the inner side wall of the gate, and the mounting plate is located between the mounting beams; the filter box is fixedly connected to the left side of the top of the mounting beam on the upper side through bolts, and the transport box is fixedly connected to the right side of the top of the mounting beam on the upper side through bolts. The operation of the hydropower station is not influenced, the economic loss is reduced, meanwhile, the danger of dredging is also reduced, the use range of dredging equipment is not limited any more, cement separation treatment can be carried out on the cleaned sludge, the sludge cleaning efficiency is improved, meanwhile, the loss of water resources is avoided, and the waste of the water resources is avoided.
本发明公开了水电工程技术领域的一种水电站闸口清淤装置,包括闸口、安装梁、安装板、过滤箱和运输箱,所述安装梁固定连接在所述闸口的内侧壁上下两侧之间,所述安装板位于所述安装梁的之间,所述过滤箱通过螺栓固定连接在上侧所述安装梁的顶部左侧,所述运输箱通过螺栓固定连接在上侧所述安装梁的顶部右侧,该水电站闸口清淤装置,结构设计合理,能够提高清淤的质量,能够在水电站运行的情况下进行清淤工作,不会影响水电站的运行,降低经济损失,同时也降低了清淤的危险性,清淤设备的使用范围不再受限,能够对清理的淤泥进行水泥分离处理,在提高淤泥清理的效率时还同时避免的水资源的流失,避免浪费水资源。
Hydropower station gate dredging device
一种水电站闸口清淤装置
CAO JINLIANG (author) / GAN HAIPING (author) / ZHANG MING (author) / ZHOU LUANJUN (author) / ZHOU BO (author) / WANG SENLIN (author) / DENG XIAOJUN (author) / ZHOU SHUNSHENG (author)
2023-08-22
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
B01D
SEPARATION
,
Trennen
/
C02F
Behandlung von Wasser, Schmutzwasser, Abwasser oder von Abwasserschlamm
,
TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Underwater dredging system and dredging method for tail water channel of hydropower station
European Patent Office | 2020
|