Installation and construction method of assembly type precast concrete column
The invention provides an installation construction method of an assembly type precast concrete column, and belongs to the technical field of building construction, the installation construction method of the assembly type precast concrete column comprises the following steps: S10, construction surface cleaning: cleaning concrete residues and garbage on the concrete surface and the steel bar surface; s20, column elevation control is conducted, specifically, the elevation of the assembly type prefabricated concrete column is controlled, and the standard is that the elevation of the top face design structure of the column is plus 20 mm; s30, the fabricated precast concrete column is hoisted to be aligned with the ground embedded steel bar position and then descends in place; s40, the position of the fabricated precast concrete column is adjusted, the fabricated precast concrete column is subjected to elevation to be accurately in place, and a temporary support is installed; s50, plugging grouting is carried out, and bed slurry gap plugging is carried out between the column bottom of the assembly type prefabricated concrete column and a bottom plate; according to the invention, the problems of inaccurate manual measurement, long construction period, difficult installation and high construction difficulty in traditional concrete column construction can be solved.
本发明提供了装配式预制混凝土柱的安装施工方法,属于建筑施工技术领域,该装配式预制混凝土柱的安装施工方法包括以下步骤:S10:施工面清理,将混凝土表面以及钢筋表面的混凝土残渣和垃圾清理干净;S20:柱标高控制,控制装配式预制混凝土柱的标高,以柱顶面设计结构标高+20mm为准;S30:吊装所述装配式预制混凝土柱至与地面预埋钢筋位置对准后下降就位;S40:调整所述装配式预制混凝土柱的位置、标高至精确就位,并安装临时支撑;S50:封堵灌浆,在所述装配式预制混凝土柱的柱底与底板间进行座浆塞缝;本发明能够解决传统的混凝土柱施工存在的人工测量不精确、施工周期长、安装困难,施工难度大的问题。
Installation and construction method of assembly type precast concrete column
The invention provides an installation construction method of an assembly type precast concrete column, and belongs to the technical field of building construction, the installation construction method of the assembly type precast concrete column comprises the following steps: S10, construction surface cleaning: cleaning concrete residues and garbage on the concrete surface and the steel bar surface; s20, column elevation control is conducted, specifically, the elevation of the assembly type prefabricated concrete column is controlled, and the standard is that the elevation of the top face design structure of the column is plus 20 mm; s30, the fabricated precast concrete column is hoisted to be aligned with the ground embedded steel bar position and then descends in place; s40, the position of the fabricated precast concrete column is adjusted, the fabricated precast concrete column is subjected to elevation to be accurately in place, and a temporary support is installed; s50, plugging grouting is carried out, and bed slurry gap plugging is carried out between the column bottom of the assembly type prefabricated concrete column and a bottom plate; according to the invention, the problems of inaccurate manual measurement, long construction period, difficult installation and high construction difficulty in traditional concrete column construction can be solved.
本发明提供了装配式预制混凝土柱的安装施工方法,属于建筑施工技术领域,该装配式预制混凝土柱的安装施工方法包括以下步骤:S10:施工面清理,将混凝土表面以及钢筋表面的混凝土残渣和垃圾清理干净;S20:柱标高控制,控制装配式预制混凝土柱的标高,以柱顶面设计结构标高+20mm为准;S30:吊装所述装配式预制混凝土柱至与地面预埋钢筋位置对准后下降就位;S40:调整所述装配式预制混凝土柱的位置、标高至精确就位,并安装临时支撑;S50:封堵灌浆,在所述装配式预制混凝土柱的柱底与底板间进行座浆塞缝;本发明能够解决传统的混凝土柱施工存在的人工测量不精确、施工周期长、安装困难,施工难度大的问题。
Installation and construction method of assembly type precast concrete column
装配式预制混凝土柱的安装施工方法
ZHAO HE (author) / WANG XILONG (author) / ZHANG YUGANG (author) / ZHANG BAOLONG (author) / ZHANG ZHAOJIAN (author)
2023-09-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B64U
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
G06T
Bilddatenverarbeitung oder Bilddatenerzeugung allgemein
,
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
/
G06V
Assembly type precast concrete column base joint connecting structure and construction method
European Patent Office | 2023
|