Floor paint construction method
The invention discloses a floor paint construction method. The floor paint construction method comprises the following steps that S1, whether the concrete pouring time of a construction surface in a construction site is longer than 28 days or not is judged; if yes, measuring the concrete water content of the construction surface; if not, ending; s2, judging whether the water content of concrete of the construction surface is lower than 7% or not; if yes, cleaning miscellaneous slag attached to the construction surface; if not, ending; s3, floating ash and a loose concrete surface layer on a construction surface are removed through a polishing instrument, and a construction base surface is prepared; s4, primer is brushed on the construction base surface, so that the construction base surface is covered with a primer layer; s5, the top surface of the primer layer is coated with a mortar layer in batches, and the top surface of the primer layer is covered with the mortar layer; s6, the top face of the mortar layer is coated with a self-leveling layer in batches, and the top face of the mortar layer is covered with the self-leveling layer; s7, the top surface of the self-leveling layer is coated with finish paint in a blade coating or roller coating mode, so that the top surface of the self-leveling layer is covered with a finish paint layer; the requirements of the floor paint in special places can be met, and the safety protection level is improved.
本发明公开了一种地坪漆施工方法,包括如下步骤:S1.判断施工场地中施工面的混凝土浇筑时间是否大于28天;若是,则测量施工面的混凝土含水量;若否则结束;S2.判断施工面的混凝土含水量是否低于7%;若是,则清理附着在施工面的杂渣;若否则结束;S3.采用打磨器械去除施工面的浮灰和松散混凝土面层,制备施工基面;S4.在施工基面刷涂底漆,使施工基面上覆盖底漆层;S5.在底漆层顶面批涂砂浆层,使底漆层顶面覆盖砂浆层;S6.在砂浆层顶面批涂自流平层,使砂浆层顶面覆盖自流平层;S7.在自流平层顶面刮涂或滚涂面漆,使自流平层顶面覆盖面漆层;能够满足地坪漆在特需场所的需求,提升安全防护等级。
Floor paint construction method
The invention discloses a floor paint construction method. The floor paint construction method comprises the following steps that S1, whether the concrete pouring time of a construction surface in a construction site is longer than 28 days or not is judged; if yes, measuring the concrete water content of the construction surface; if not, ending; s2, judging whether the water content of concrete of the construction surface is lower than 7% or not; if yes, cleaning miscellaneous slag attached to the construction surface; if not, ending; s3, floating ash and a loose concrete surface layer on a construction surface are removed through a polishing instrument, and a construction base surface is prepared; s4, primer is brushed on the construction base surface, so that the construction base surface is covered with a primer layer; s5, the top surface of the primer layer is coated with a mortar layer in batches, and the top surface of the primer layer is covered with the mortar layer; s6, the top face of the mortar layer is coated with a self-leveling layer in batches, and the top face of the mortar layer is covered with the self-leveling layer; s7, the top surface of the self-leveling layer is coated with finish paint in a blade coating or roller coating mode, so that the top surface of the self-leveling layer is covered with a finish paint layer; the requirements of the floor paint in special places can be met, and the safety protection level is improved.
本发明公开了一种地坪漆施工方法,包括如下步骤:S1.判断施工场地中施工面的混凝土浇筑时间是否大于28天;若是,则测量施工面的混凝土含水量;若否则结束;S2.判断施工面的混凝土含水量是否低于7%;若是,则清理附着在施工面的杂渣;若否则结束;S3.采用打磨器械去除施工面的浮灰和松散混凝土面层,制备施工基面;S4.在施工基面刷涂底漆,使施工基面上覆盖底漆层;S5.在底漆层顶面批涂砂浆层,使底漆层顶面覆盖砂浆层;S6.在砂浆层顶面批涂自流平层,使砂浆层顶面覆盖自流平层;S7.在自流平层顶面刮涂或滚涂面漆,使自流平层顶面覆盖面漆层;能够满足地坪漆在特需场所的需求,提升安全防护等级。
Floor paint construction method
地坪漆施工方法
FAN YONG (author) / YAN HUAGUO (author) / LI GUANGYAO (author) / ZHANG YIZHUO (author)
2023-11-24
Patent
Electronic Resource
Chinese