A platform for research: civil engineering, architecture and urbanism
River way timber pile bank protection construction method
The invention discloses a riverway timber pile bank protection construction method. A stable, firm and durable protection and pressing structure is formed in the modes of base plane arrangement, water retaining steel plate manufacturing and fixing, pile manufacturing and pile pressing, waterproof layer arrangement, connecting pile anchoring, connecting pile connecting with pine piles through pull rods and layered backfilling. According to the bank protection structure, the steel plates are combined with the timber piles to be arranged along the river bank, the timber piles are fixed to the connecting piles through the pull rods, connection between the timber piles is increased, the overall strength and stability of the steel plates and the timber piles are improved, the bank protection strength is enhanced, the fixing strength of the timber piles is improved, and the timber piles are not prone to being flushed down by water flow.
本发明公开了河道木桩护岸施工方法,通过设置基面‑制造以及固定挡水钢板‑制桩以及压桩‑设置防水层‑锚固连接桩,连接桩通过拉杆连接松木桩‑分层回填的方式形成稳定、坚固、持久耐用的护按结构。护岸结构中钢板结合木桩沿着河岸布置,木桩通过拉杆固定在连接桩的结构既增加了木桩之间的联系,将钢板和木桩整体的强度以及稳定性提高,加强护岸的力度,也提高了木桩的固定强度,使得木桩不易被水流冲倒。
River way timber pile bank protection construction method
The invention discloses a riverway timber pile bank protection construction method. A stable, firm and durable protection and pressing structure is formed in the modes of base plane arrangement, water retaining steel plate manufacturing and fixing, pile manufacturing and pile pressing, waterproof layer arrangement, connecting pile anchoring, connecting pile connecting with pine piles through pull rods and layered backfilling. According to the bank protection structure, the steel plates are combined with the timber piles to be arranged along the river bank, the timber piles are fixed to the connecting piles through the pull rods, connection between the timber piles is increased, the overall strength and stability of the steel plates and the timber piles are improved, the bank protection strength is enhanced, the fixing strength of the timber piles is improved, and the timber piles are not prone to being flushed down by water flow.
本发明公开了河道木桩护岸施工方法,通过设置基面‑制造以及固定挡水钢板‑制桩以及压桩‑设置防水层‑锚固连接桩,连接桩通过拉杆连接松木桩‑分层回填的方式形成稳定、坚固、持久耐用的护按结构。护岸结构中钢板结合木桩沿着河岸布置,木桩通过拉杆固定在连接桩的结构既增加了木桩之间的联系,将钢板和木桩整体的强度以及稳定性提高,加强护岸的力度,也提高了木桩的固定强度,使得木桩不易被水流冲倒。
River way timber pile bank protection construction method
河道木桩护岸施工方法
YU XUNXUN (author) / WANG HAIYANG (author) / GAO YATING (author) / WU FUXIAN (author) / CHEN ZIXIA (author) / LIU JUNPING (author)
2023-12-19
Patent
Electronic Resource
Chinese
European Patent Office | 2016
|Prefabricated assembly type prestressed composite sheet pile bank protection construction method
European Patent Office | 2023
|Pine pile and pebble supporting construction method for ecological bank protection
European Patent Office | 2024
|