A platform for research: civil engineering, architecture and urbanism
Ultrahigh-strength concrete pouring equipment for steel bridge deck
The invention relates to steel bridge deck ultrahigh-strength concrete pouring equipment which comprises a pouring formwork and a pouring vehicle, the pouring formwork is provided with a stand column groove, moving wheels are rotationally arranged on the two sides of the pouring vehicle, a traction lug is arranged at the front end of the pouring vehicle, an assembling groove is formed in the middle of the pouring vehicle, a pouring pipe is assembled in the assembling groove, and a stabilizing mechanism is arranged between the pouring pipe and the assembling groove. A connecting pipe is fixedly assembled on the upper side of the pouring pipe, a push plate is assembled on the rear side of the pouring vehicle, a shaking mechanism is assembled between the push plate and the pouring vehicle, the stabilizing mechanism comprises a pipe frame and L-shaped locking blocks, the pipe frame is fixedly assembled on the pouring pipe, L-shaped sliding grooves are formed in the front side and the rear side of the pipe frame, and the L-shaped locking blocks are assembled in the two L-shaped sliding grooves in a front-back sliding mode. First springs are fixedly arranged between the sides, close to the pouring pipe, of the L-shaped locking blocks and the pipe frame, and a plurality of locking grooves matched with the L-shaped locking blocks are formed in the inner side of the assembling groove in a clamped mode.
本发明涉及一种钢桥面超高强混凝土浇筑设备,包括浇筑模板以及浇筑车,浇筑模板设有立柱槽,浇筑车两侧均转动设有移动轮,浇筑车前端设有牵引耳,浇筑车中部开设有装配槽,装配槽装配有浇筑管,浇筑管与装配槽之间设有稳固机构,浇筑管上侧固定装配有连接管,浇筑车后侧装配有推板,推板与浇筑车之间装配有抖动机构,稳固机构包括管架以及L形锁块,管架固定装配于浇筑管,管架前后两侧均开设有L形滑槽,两个L形滑槽内部均前后滑动装配有L形锁块,L形锁块靠近浇筑管一侧与管架之间固定设有第一弹簧,装配槽内侧卡设有若干与L形锁块匹配的锁槽。
Ultrahigh-strength concrete pouring equipment for steel bridge deck
The invention relates to steel bridge deck ultrahigh-strength concrete pouring equipment which comprises a pouring formwork and a pouring vehicle, the pouring formwork is provided with a stand column groove, moving wheels are rotationally arranged on the two sides of the pouring vehicle, a traction lug is arranged at the front end of the pouring vehicle, an assembling groove is formed in the middle of the pouring vehicle, a pouring pipe is assembled in the assembling groove, and a stabilizing mechanism is arranged between the pouring pipe and the assembling groove. A connecting pipe is fixedly assembled on the upper side of the pouring pipe, a push plate is assembled on the rear side of the pouring vehicle, a shaking mechanism is assembled between the push plate and the pouring vehicle, the stabilizing mechanism comprises a pipe frame and L-shaped locking blocks, the pipe frame is fixedly assembled on the pouring pipe, L-shaped sliding grooves are formed in the front side and the rear side of the pipe frame, and the L-shaped locking blocks are assembled in the two L-shaped sliding grooves in a front-back sliding mode. First springs are fixedly arranged between the sides, close to the pouring pipe, of the L-shaped locking blocks and the pipe frame, and a plurality of locking grooves matched with the L-shaped locking blocks are formed in the inner side of the assembling groove in a clamped mode.
本发明涉及一种钢桥面超高强混凝土浇筑设备,包括浇筑模板以及浇筑车,浇筑模板设有立柱槽,浇筑车两侧均转动设有移动轮,浇筑车前端设有牵引耳,浇筑车中部开设有装配槽,装配槽装配有浇筑管,浇筑管与装配槽之间设有稳固机构,浇筑管上侧固定装配有连接管,浇筑车后侧装配有推板,推板与浇筑车之间装配有抖动机构,稳固机构包括管架以及L形锁块,管架固定装配于浇筑管,管架前后两侧均开设有L形滑槽,两个L形滑槽内部均前后滑动装配有L形锁块,L形锁块靠近浇筑管一侧与管架之间固定设有第一弹簧,装配槽内侧卡设有若干与L形锁块匹配的锁槽。
Ultrahigh-strength concrete pouring equipment for steel bridge deck
一种钢桥面超高强混凝土浇筑设备
LU YA (author) / ZHANG XIN (author) / ZHU QUPING (author) / YUAN LAN (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Concrete pouring method for steel-concrete composite beam bridge deck slab
European Patent Office | 2020
|Fabricated steel-ultrahigh toughness concrete combined bridge deck
European Patent Office | 2021
|