Cable crane system for construction of anchorage foundation and anchoring system and construction method
The invention relates to a cable crane system for construction of an anchorage foundation and an anchoring system and a construction method, the cable crane system comprises crane rails which are arranged on two sides of a foundation pit in parallel, at least one cable crane is arranged on one crane rail, and the cable cranes can move along the crane rails; a sling is connected between the cable cranes at opposite positions on the two crane rails, at least one sports car is arranged on the sling, and the sports car can move between the two cable cranes along the sling and is used for construction operation; the sports car comprises a positioning moving part, an unwinding part and a hoisting part from top to bottom, the positioning moving part is connected with the sling in a sliding mode, two winding wheels of the unwinding part are correspondingly connected with two fixed wheels of the hoisting part through hoisting ropes respectively, the two winding shafts release or take up the hoisting ropes synchronously, descending or ascending of the hoisting part is achieved, and construction operation at the required position in the foundation pit is matched.
本发明涉及用于锚碇基础和锚固系统施工的缆索吊系统及施工方法,包括基坑两侧相互平行设置的吊机轨道,一道吊机轨道上至少设置一台缆索吊机,缆索吊机能够沿吊机轨道移动;两道吊机轨道上相对位置的缆索吊机之间连接有吊索,吊索上设有至少一台跑车,跑车能够沿着吊索在两个缆索吊机之间移动位置,用于施工作业;跑车由上至下包括定位移动部、放卷部和吊装部,定位移动部滑动连接吊索,放卷部的两个卷轮分别通过吊绳对应连接吊装部的两个定轮,两个卷轴同步释放或收回吊绳,实现吊装部的下降或上升,配合基坑内的要求位置的施工作业。
Cable crane system for construction of anchorage foundation and anchoring system and construction method
The invention relates to a cable crane system for construction of an anchorage foundation and an anchoring system and a construction method, the cable crane system comprises crane rails which are arranged on two sides of a foundation pit in parallel, at least one cable crane is arranged on one crane rail, and the cable cranes can move along the crane rails; a sling is connected between the cable cranes at opposite positions on the two crane rails, at least one sports car is arranged on the sling, and the sports car can move between the two cable cranes along the sling and is used for construction operation; the sports car comprises a positioning moving part, an unwinding part and a hoisting part from top to bottom, the positioning moving part is connected with the sling in a sliding mode, two winding wheels of the unwinding part are correspondingly connected with two fixed wheels of the hoisting part through hoisting ropes respectively, the two winding shafts release or take up the hoisting ropes synchronously, descending or ascending of the hoisting part is achieved, and construction operation at the required position in the foundation pit is matched.
本发明涉及用于锚碇基础和锚固系统施工的缆索吊系统及施工方法,包括基坑两侧相互平行设置的吊机轨道,一道吊机轨道上至少设置一台缆索吊机,缆索吊机能够沿吊机轨道移动;两道吊机轨道上相对位置的缆索吊机之间连接有吊索,吊索上设有至少一台跑车,跑车能够沿着吊索在两个缆索吊机之间移动位置,用于施工作业;跑车由上至下包括定位移动部、放卷部和吊装部,定位移动部滑动连接吊索,放卷部的两个卷轮分别通过吊绳对应连接吊装部的两个定轮,两个卷轴同步释放或收回吊绳,实现吊装部的下降或上升,配合基坑内的要求位置的施工作业。
Cable crane system for construction of anchorage foundation and anchoring system and construction method
用于锚碇基础和锚固系统施工的缆索吊系统及施工方法
ZHU XIAOJIN (author) / ZHAO TINGJIAN (author) / ZHANG XIAOLONG (author) / WU SHANGWEI (author)
2023-12-26
Patent
Electronic Resource
Chinese
Cable crane main cable and anchorage prestress anchoring connecting device and construction method
European Patent Office | 2021
|Anchorage anchoring system positioning device and construction method thereof
European Patent Office | 2021
|Prestressed anchorage device, anchoring assembly and anchoring construction method
European Patent Office | 2021
|Prestressed anchorage device and anchoring construction method
European Patent Office | 2021
|