A platform for research: civil engineering, architecture and urbanism
Stay cable beam end anchoring area sealing structure and preparation method
The invention discloses an inhaul cable beam end anchoring area sealing structure and a preparation method, the sealing structure comprises an anchor cup, a pre-buried pipe, a cable body, a sealing cylinder and a waterproof cover, one end of the pre-buried pipe is connected with the anchor cup, the other end of the pre-buried pipe is connected with the waterproof cover, the sealing cylinder is arranged in the pre-buried pipe, and the cable body is arranged in the sealing cylinder. The cable body penetrates through the waterproof cover, the embedded pipe and the sealing cylinder and then is connected with the anchor cup. The sealing structure between the anchor cup and the cable body is completely wrapped through the filling type sealing structure composed of the protective sleeve and the sealing layer. And after the sealing layer is filled, the pipe orifice of the protective sleeve is covered, and curing is completed, so that treatment of the interior of the embedded pipe is omitted, long-time waiting for sealing treatment of the pipe orifice of the embedded pipe is not needed, and the problem of water inflow in the waiting process is avoided.
本发明公开了一种拉索梁端锚固区密封结构及制备方法,所述密封结构包括锚杯、预埋管、索体、密封筒和防水罩,所述预埋管一端与锚杯连接,预埋管另一端与防水罩连接,所述密封筒设置在预埋管内,所述索体贯穿防水罩、预埋管和密封筒后与锚杯连接。本发明通过由护套管和密封层组成的填充式密封结构,将锚杯与索体之间的密封结构全包裹。密封层填充后护套管的管口进行遮盖待固化完成即可,省去对预埋管内部的处理,并且不需要长时间等待预埋管管口进行密封处理,避免了等待过程进水的问题。
Stay cable beam end anchoring area sealing structure and preparation method
The invention discloses an inhaul cable beam end anchoring area sealing structure and a preparation method, the sealing structure comprises an anchor cup, a pre-buried pipe, a cable body, a sealing cylinder and a waterproof cover, one end of the pre-buried pipe is connected with the anchor cup, the other end of the pre-buried pipe is connected with the waterproof cover, the sealing cylinder is arranged in the pre-buried pipe, and the cable body is arranged in the sealing cylinder. The cable body penetrates through the waterproof cover, the embedded pipe and the sealing cylinder and then is connected with the anchor cup. The sealing structure between the anchor cup and the cable body is completely wrapped through the filling type sealing structure composed of the protective sleeve and the sealing layer. And after the sealing layer is filled, the pipe orifice of the protective sleeve is covered, and curing is completed, so that treatment of the interior of the embedded pipe is omitted, long-time waiting for sealing treatment of the pipe orifice of the embedded pipe is not needed, and the problem of water inflow in the waiting process is avoided.
本发明公开了一种拉索梁端锚固区密封结构及制备方法,所述密封结构包括锚杯、预埋管、索体、密封筒和防水罩,所述预埋管一端与锚杯连接,预埋管另一端与防水罩连接,所述密封筒设置在预埋管内,所述索体贯穿防水罩、预埋管和密封筒后与锚杯连接。本发明通过由护套管和密封层组成的填充式密封结构,将锚杯与索体之间的密封结构全包裹。密封层填充后护套管的管口进行遮盖待固化完成即可,省去对预埋管内部的处理,并且不需要长时间等待预埋管管口进行密封处理,避免了等待过程进水的问题。
Stay cable beam end anchoring area sealing structure and preparation method
一种拉索梁端锚固区密封结构及制备方法
SHEN YANGBO (author) / TAO WENBIN (author) / ZOU YIQING (author) / QIN WEIWEI (author) / CHEN LI (author) / YA XIANGFEI (author) / CHEN YUPENG (author) / TAN LIUFANG (author) / LU DEZHI (author) / ZHOU JIE (author)
2024-01-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Inhaul cable beam end anchoring area airtight sealing structure and construction method
European Patent Office | 2023
|European Patent Office | 2024
|Stay cable and bridge tower anchoring structure and manufacturing method
European Patent Office | 2020
|Stay cable bridge and anchoring optimization method thereof
European Patent Office | 2021
|