The invention provides a construction method for a double-sided stiff bare concrete inclined wall, and belongs to the technical field of building construction.The construction method for the double-sided stiff bare concrete inclined wall comprises the steps that a formwork is manufactured, and the size and the shape of the formwork are determined according to a design drawing; formwork installation, specifically, the manufactured formwork is installed according to the requirements of a design drawing; steel bars are bound, specifically, the steel bars are bound according to the requirements of the design drawing; concrete pouring is conducted, specifically, concrete is poured into the formwork; concrete curing is conducted, specifically, the poured concrete is cured; the formwork is dismantled, and after the concrete reaches the specified strength, the formwork is dismantled; the surface of the inclined wall is treated, specifically, the surface of the inclined wall is painted or smeared; and the inclined wall is inspected, specifically, the constructed inclined wall is inspected. The technical problem that in the prior art, the concrete strength is detected by means of manual experience or a simple ultrasonic detection method, and analysis cannot be carried out according to the stress condition of concrete can be solved.
本发明提供了一种双面劲性清水混凝土斜墙施工方法,属于建筑施工技术领域,该双面劲性清水混凝土斜墙施工方法包括:模板的制作,根据设计图纸确定模板的大小和形状;模板的安装,将制作好的模板按照设计图纸的要求进行安装;钢筋的绑扎,按照设计图纸的要求进行钢筋的绑扎;混凝土浇筑,将混凝土浇筑到模板中;混凝土养护,对浇筑好的混凝土进行养护;模板的拆除,当混凝土达到指定强度后,进行模板的拆除;斜墙表面的处理,进行斜墙表面的粉刷或涂抹;斜墙的检验,对施工完成的斜墙进行检验。能够解决现有技术往往依靠人工经验或者简单的超声检测的方法来检测混凝土强度,无法根据混凝土受力情况进行分析的技术问题。
Construction method of double-sided stiff bare concrete inclined wall
The invention provides a construction method for a double-sided stiff bare concrete inclined wall, and belongs to the technical field of building construction.The construction method for the double-sided stiff bare concrete inclined wall comprises the steps that a formwork is manufactured, and the size and the shape of the formwork are determined according to a design drawing; formwork installation, specifically, the manufactured formwork is installed according to the requirements of a design drawing; steel bars are bound, specifically, the steel bars are bound according to the requirements of the design drawing; concrete pouring is conducted, specifically, concrete is poured into the formwork; concrete curing is conducted, specifically, the poured concrete is cured; the formwork is dismantled, and after the concrete reaches the specified strength, the formwork is dismantled; the surface of the inclined wall is treated, specifically, the surface of the inclined wall is painted or smeared; and the inclined wall is inspected, specifically, the constructed inclined wall is inspected. The technical problem that in the prior art, the concrete strength is detected by means of manual experience or a simple ultrasonic detection method, and analysis cannot be carried out according to the stress condition of concrete can be solved.
本发明提供了一种双面劲性清水混凝土斜墙施工方法,属于建筑施工技术领域,该双面劲性清水混凝土斜墙施工方法包括:模板的制作,根据设计图纸确定模板的大小和形状;模板的安装,将制作好的模板按照设计图纸的要求进行安装;钢筋的绑扎,按照设计图纸的要求进行钢筋的绑扎;混凝土浇筑,将混凝土浇筑到模板中;混凝土养护,对浇筑好的混凝土进行养护;模板的拆除,当混凝土达到指定强度后,进行模板的拆除;斜墙表面的处理,进行斜墙表面的粉刷或涂抹;斜墙的检验,对施工完成的斜墙进行检验。能够解决现有技术往往依靠人工经验或者简单的超声检测的方法来检测混凝土强度,无法根据混凝土受力情况进行分析的技术问题。
Construction method of double-sided stiff bare concrete inclined wall
一种双面劲性清水混凝土斜墙施工方法
SHI HONGLIANG (author) / XU YUEFENG (author) / ZHAN YONGFANG (author) / QI SHENG (author) / YU FENGFENG (author) / GUO YINGYANG (author) / XU RONG (author) / WANG YAOLONG (author) / ZHU CHUNYANG (author) / GUO CHENGLONG (author)
2024-02-23
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04G
SCAFFOLDING
,
Baugerüste
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Reinforcing construction method for three-way stiff bare concrete inclined column formwork
European Patent Office | 2024
|Construction method of inclined super-thick stiff concrete shear wall formwork structure
European Patent Office | 2024
|Construction method of large-cantilever inclined stiff concrete cylinder
European Patent Office | 2024
|Inclined side formwork erecting method for distorted surface bare concrete inclined wall
European Patent Office | 2024
|European Patent Office | 2023
|