Method for bridge pier column construction
The invention belongs to the related technical field of bridge construction, and discloses a method for bridge pier stud construction, which comprises the following steps: prefabricating a steel reinforcement framework of a bridge pier stud in a steel reinforcement processing plant and transporting to a construction site; carrying out backfield processing by adopting a moulding bed, and then integrally hoisting pier column steel bars; the construction operation platform is erected by adopting a plate buckle type pier column scaffold technology, and the pier column construction operation platform and the crawling ladder are combined into a whole; the customized pier column formworks are spliced, a spliced staggered platform is subjected to polishing treatment firstly, and then the formworks are hoisted; and after the pier column formwork is hoisted, concrete pouring is conducted on pier column steel bars till the whole bridge pier column construction process is completed. By means of the method, the construction time of a construction site can be remarkably shortened, a pier stud scaffold and a formwork are more fully utilized, the reinforcing steel bar machining quality can be improved, large-scale construction can be conducted, and the pier stud construction speed is greatly increased.
本发明属于桥梁施工相关技术领域,并公开了一种用于桥梁墩柱施工的方法,该方法包括:在钢筋加工厂预制桥梁墩柱的钢筋骨架并运至施工现场;采用胎模进行后场加工,然后整体吊装墩柱钢筋;采用盘扣式墩柱脚手架工艺来搭设施工作业平台,并使得墩柱施工作业平台与爬梯结合为一体;将定制的各块墩柱模板进行拼装,将拼装的错台先进行打磨处理,然后再进行模板吊装;当墩柱模板吊装完成后,对墩柱钢筋进行混凝土浇筑,直至完成整个的桥梁墩柱施工过程。通过本发明,不仅可显著减少施工现场的施工时间,更为充分地利用墩柱脚手架及模板,而且还有利于提高钢筋加工质量,可进行规模化施工,大大提高墩柱施工速度。
Method for bridge pier column construction
The invention belongs to the related technical field of bridge construction, and discloses a method for bridge pier stud construction, which comprises the following steps: prefabricating a steel reinforcement framework of a bridge pier stud in a steel reinforcement processing plant and transporting to a construction site; carrying out backfield processing by adopting a moulding bed, and then integrally hoisting pier column steel bars; the construction operation platform is erected by adopting a plate buckle type pier column scaffold technology, and the pier column construction operation platform and the crawling ladder are combined into a whole; the customized pier column formworks are spliced, a spliced staggered platform is subjected to polishing treatment firstly, and then the formworks are hoisted; and after the pier column formwork is hoisted, concrete pouring is conducted on pier column steel bars till the whole bridge pier column construction process is completed. By means of the method, the construction time of a construction site can be remarkably shortened, a pier stud scaffold and a formwork are more fully utilized, the reinforcing steel bar machining quality can be improved, large-scale construction can be conducted, and the pier stud construction speed is greatly increased.
本发明属于桥梁施工相关技术领域,并公开了一种用于桥梁墩柱施工的方法,该方法包括:在钢筋加工厂预制桥梁墩柱的钢筋骨架并运至施工现场;采用胎模进行后场加工,然后整体吊装墩柱钢筋;采用盘扣式墩柱脚手架工艺来搭设施工作业平台,并使得墩柱施工作业平台与爬梯结合为一体;将定制的各块墩柱模板进行拼装,将拼装的错台先进行打磨处理,然后再进行模板吊装;当墩柱模板吊装完成后,对墩柱钢筋进行混凝土浇筑,直至完成整个的桥梁墩柱施工过程。通过本发明,不仅可显著减少施工现场的施工时间,更为充分地利用墩柱脚手架及模板,而且还有利于提高钢筋加工质量,可进行规模化施工,大大提高墩柱施工速度。
Method for bridge pier column construction
一种用于桥梁墩柱施工的方法
LI YANBO (author) / GAO YONGJI (author) / SUN YINHAO (author) / WANG GANG (author) / YAN CHAOFENG (author)
2024-03-05
Patent
Electronic Resource
Chinese