Construction method of steel column
The invention belongs to the technical field of constructional engineering, and discloses a construction method of a steel column, which is convenient for construction operation and is more convenient and safer by dividing the steel column into a plurality of sections of column bodies. The column body is conveyed to the position below the bearing frame through the transport vehicle, so that the operation efficiency is improved, the lifting device on the bearing frame can conveniently lift the column body, a section of the column body is lifted to the set elevation through the lifting device, it is guaranteed that sufficient operation space is reserved below the lifted column body, and then the other column bodies can be conveniently spliced and connected. In order to ensure that the column bodies have fixing points during assembly and facilitate subsequent assembly and connection of the column bodies, the column bodies are connected to the bearing frame through the temporary supports, so that the weight of the column bodies is transmitted to the bearing frame through the temporary supports, and the bearing frame bears the load. And the next section of column body is lifted through the lifting device and is connected with the previous section of column body. And after all the column bodies are connected, the temporary support, the lifting device and the bearing frame are removed, and therefore the splicing operation of the whole steel column is completed.
本发明属于建筑工程技术领域,公开了一种钢柱的施工方法,通过将钢柱分成多段柱体,便于施工操作,更加方便安全。通过运输车将柱体输送至承载架下方,以提高作业效率,便于承载架上的提升装置对柱体进行提升,通过提升装置提升一段柱体至设定标高,以保证提升后柱体下方留有充足的作业空间,进而便于其余柱体进行拼装连接。为了保证柱体在拼装时具有固定点,便于后续柱体的拼装连接,柱体通过临时支撑连接于承载架,使得柱体的重量通过临时支撑传递至承载架,由承载架承担荷载。通过提升装置提升下一段柱体,并与上一段柱体相连。待所有柱体连接完毕后,拆除临时支撑、提升装置和承载架,从而完成整根钢柱的拼装作业。
Construction method of steel column
The invention belongs to the technical field of constructional engineering, and discloses a construction method of a steel column, which is convenient for construction operation and is more convenient and safer by dividing the steel column into a plurality of sections of column bodies. The column body is conveyed to the position below the bearing frame through the transport vehicle, so that the operation efficiency is improved, the lifting device on the bearing frame can conveniently lift the column body, a section of the column body is lifted to the set elevation through the lifting device, it is guaranteed that sufficient operation space is reserved below the lifted column body, and then the other column bodies can be conveniently spliced and connected. In order to ensure that the column bodies have fixing points during assembly and facilitate subsequent assembly and connection of the column bodies, the column bodies are connected to the bearing frame through the temporary supports, so that the weight of the column bodies is transmitted to the bearing frame through the temporary supports, and the bearing frame bears the load. And the next section of column body is lifted through the lifting device and is connected with the previous section of column body. And after all the column bodies are connected, the temporary support, the lifting device and the bearing frame are removed, and therefore the splicing operation of the whole steel column is completed.
本发明属于建筑工程技术领域,公开了一种钢柱的施工方法,通过将钢柱分成多段柱体,便于施工操作,更加方便安全。通过运输车将柱体输送至承载架下方,以提高作业效率,便于承载架上的提升装置对柱体进行提升,通过提升装置提升一段柱体至设定标高,以保证提升后柱体下方留有充足的作业空间,进而便于其余柱体进行拼装连接。为了保证柱体在拼装时具有固定点,便于后续柱体的拼装连接,柱体通过临时支撑连接于承载架,使得柱体的重量通过临时支撑传递至承载架,由承载架承担荷载。通过提升装置提升下一段柱体,并与上一段柱体相连。待所有柱体连接完毕后,拆除临时支撑、提升装置和承载架,从而完成整根钢柱的拼装作业。
Construction method of steel column
钢柱的施工方法
CHEN YING (author) / LIU MINGYANG (author) / SHEN HAO (author) / YANG QING (author) / WU XIAOFENG (author) / WANG AO'AO (author) / CHEN ZHIGEN (author) / WU XINZHI (author)
2024-03-26
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|