Embankment breach rapid plugging system based on anchor array rooting-blocking cooperation
The invention provides a dike breach rapid blocking system based on anchor array rooting-blocking cooperation, belongs to the field of water conservancy projects, and adopts a method for rapidly blocking a breach from two ends of a dike at the same time. Rocket anchors with cables are driven into a riverbed at the bottom of a breach through a rocket launching vehicle, steel mesh gabions are slidably thrown along the anchor cables, the buffering and flow reducing effect on water flow at the breach is achieved, then two rows of steel pipe piles are driven along the axis of a dike through a vibroflotation pile planting machine, and then steel wire meshes are arranged in front of pile bodies. A'midstream pillar 'based on anchor array rooting-blocking cooperation breach plugging is established, a steel mesh gabion and a triangular cone-shaped throwing object filled with soil and stones are subsequently thrown until the throwing object is exposed out of the water surface, then the soil is bulldozed for occupying, rapid and effective plugging of a large breach is achieved, the plugging efficiency is not affected by the width of a gate, and the construction efficiency is improved. And the dosage of the thrown plugging material can be reduced, and the plugging time is saved.
本发明提供一种基于锚阵生根‑阻拦协同的堤防溃口快速封堵系统,属于水利工程领域,采用自堤防两端同时进行溃口快速封堵的方法。本发明利用火箭发射车将带索火箭锚打入溃口底部河床中,沿锚索滑投钢网石笼,对溃口处的水流起到缓冲减流作用,再利用振冲植桩机沿堤防轴线打入两排钢管桩,之后在桩体前布置钢丝网片,建立基于锚阵生根‑阻拦协同溃口封堵的“中流砥柱”,后续抛投钢网石笼及装有土料与石块的三角锥状抛投物,直至露出水面后推土进占,实现大溃口的快速且有效的封堵,使得堵口效率不随门口宽度的影响,且能够减少抛投封堵物料的用量、节省封堵时间。
Embankment breach rapid plugging system based on anchor array rooting-blocking cooperation
The invention provides a dike breach rapid blocking system based on anchor array rooting-blocking cooperation, belongs to the field of water conservancy projects, and adopts a method for rapidly blocking a breach from two ends of a dike at the same time. Rocket anchors with cables are driven into a riverbed at the bottom of a breach through a rocket launching vehicle, steel mesh gabions are slidably thrown along the anchor cables, the buffering and flow reducing effect on water flow at the breach is achieved, then two rows of steel pipe piles are driven along the axis of a dike through a vibroflotation pile planting machine, and then steel wire meshes are arranged in front of pile bodies. A'midstream pillar 'based on anchor array rooting-blocking cooperation breach plugging is established, a steel mesh gabion and a triangular cone-shaped throwing object filled with soil and stones are subsequently thrown until the throwing object is exposed out of the water surface, then the soil is bulldozed for occupying, rapid and effective plugging of a large breach is achieved, the plugging efficiency is not affected by the width of a gate, and the construction efficiency is improved. And the dosage of the thrown plugging material can be reduced, and the plugging time is saved.
本发明提供一种基于锚阵生根‑阻拦协同的堤防溃口快速封堵系统,属于水利工程领域,采用自堤防两端同时进行溃口快速封堵的方法。本发明利用火箭发射车将带索火箭锚打入溃口底部河床中,沿锚索滑投钢网石笼,对溃口处的水流起到缓冲减流作用,再利用振冲植桩机沿堤防轴线打入两排钢管桩,之后在桩体前布置钢丝网片,建立基于锚阵生根‑阻拦协同溃口封堵的“中流砥柱”,后续抛投钢网石笼及装有土料与石块的三角锥状抛投物,直至露出水面后推土进占,实现大溃口的快速且有效的封堵,使得堵口效率不随门口宽度的影响,且能够减少抛投封堵物料的用量、节省封堵时间。
Embankment breach rapid plugging system based on anchor array rooting-blocking cooperation
一种基于锚阵生根-阻拦协同的堤防溃口快速封堵系统
PANG RUI (author) / XU BIN (author) / DING DAFEI (author) / ZHOU YANG (author)
2024-05-10
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Dike breach rapid occupation method based on blocking cooperation
European Patent Office | 2024
|Dike breach rapid blocking method combining rocket anchor and pile planting technology
European Patent Office | 2024
|