A platform for research: civil engineering, architecture and urbanism
Sectional type beam column pouring construction method and construction equipment thereof
The invention relates to the technical field of beam column construction, and particularly discloses a segmented beam column pouring construction method and construction equipment thereof.The segmented beam column pouring construction method comprises the steps that an in-column supporting piece is installed at the construction position of a column in advance, column formworks are installed on the periphery of the in-column supporting piece, and segmented pouring work from the column to the joint of the column and a beam is completed; mounting a column template at the position where the column is connected with the beam, mounting an in-beam supporting piece and connecting the in-beam supporting piece with an in-column supporting piece, mounting a beam template and connecting the beam template with the column template, integrally pouring and forming the joint of the column and the beam and the beam, and removing the beam template and the column template. The method has the effect of reducing the positioning error at the joint of the beam and the column.
本申请涉及粱柱施工的技术领域,并具体公开了一种分段式粱柱浇筑施工方法及其施工设备,其包括在柱的施工位置预先安装柱内支撑件,在柱内支撑件的四周安装柱模板并完成柱直至与粱连接处的分段浇筑工作,在柱连接粱处安装柱模板,安装粱内支撑件并将粱内支撑件连接柱内支撑件,安装粱模板并将粱模板连接柱模板,将柱与粱连接处及粱一体浇筑成型,拆除粱模板和柱模板。本申请具有降低粱柱连接处的定位误差的效果。
Sectional type beam column pouring construction method and construction equipment thereof
The invention relates to the technical field of beam column construction, and particularly discloses a segmented beam column pouring construction method and construction equipment thereof.The segmented beam column pouring construction method comprises the steps that an in-column supporting piece is installed at the construction position of a column in advance, column formworks are installed on the periphery of the in-column supporting piece, and segmented pouring work from the column to the joint of the column and a beam is completed; mounting a column template at the position where the column is connected with the beam, mounting an in-beam supporting piece and connecting the in-beam supporting piece with an in-column supporting piece, mounting a beam template and connecting the beam template with the column template, integrally pouring and forming the joint of the column and the beam and the beam, and removing the beam template and the column template. The method has the effect of reducing the positioning error at the joint of the beam and the column.
本申请涉及粱柱施工的技术领域,并具体公开了一种分段式粱柱浇筑施工方法及其施工设备,其包括在柱的施工位置预先安装柱内支撑件,在柱内支撑件的四周安装柱模板并完成柱直至与粱连接处的分段浇筑工作,在柱连接粱处安装柱模板,安装粱内支撑件并将粱内支撑件连接柱内支撑件,安装粱模板并将粱模板连接柱模板,将柱与粱连接处及粱一体浇筑成型,拆除粱模板和柱模板。本申请具有降低粱柱连接处的定位误差的效果。
Sectional type beam column pouring construction method and construction equipment thereof
一种分段式粱柱浇筑施工方法及其施工设备
CAO DEJIANG (author) / YANG RUI (author) / YANG SHENGHUI (author) / CHEN PING (author) / WANG GUIZENG (author)
2024-06-28
Patent
Electronic Resource
Chinese
Reinforced concrete beam column pouring construction method
European Patent Office | 2021
|Building column beam pouring construction device and construction method
European Patent Office | 2024
|Beam column joint mixed pouring prevention isolation device and construction method thereof
European Patent Office | 2024
|