A platform for research: civil engineering, architecture and urbanism
Construction method for integrally-formed building house
The invention relates to the technical field of building construction, and discloses an integrally-formed building house construction method which comprises the following steps: step 1, a design stage: structural parameters of a building design drawing and a detailed construction drawing conform to a preset safety coefficient; 2, preparation work is conducted, specifically, a construction site is cleaned, leveled and compacted; 3, foundation construction, wherein a foundation is built, and reinforcing steel bars are placed in the foundation; fourthly, a formwork is erected, specifically, a formwork system is erected to make preparation for concrete pouring; 5, reinforcing steel bar engineering, wherein reinforcing steel bars are arranged according to the construction drawing; sixthly, concrete is poured, specifically, the concrete is poured into the formwork; 7, a curing stage, wherein the concrete is properly cured; 8, the formwork is dismantled, wherein when the concrete strength reaches the design strength, the formwork is dismantled; and step 9, checking and accepting. And the concrete is poured by using a high-performance material, so that the durability and the environmental influence resistance of the concrete are enhanced while the structural strength is improved.
本申请涉及建筑施工技术领域,公开了一体化成型的建筑房屋施工方法,包括以下步骤:步骤一、设计阶段:建筑设计图纸和详细的施工图的结构参数符合预定的安全系数;步骤二、准备工作:清理施工场地并进行平整和压实;步骤三、基础施工:建造基础并在其中放置钢筋;步骤四、模板搭设:搭建模板系统为浇筑混凝土做准备;步骤五、钢筋工程:根据施工图布置钢筋;步骤六、浇筑混凝土:将混凝土浇筑到模板中;步骤七、养护阶段:对混凝土进行适当的养护;步骤八、拆除模板:混凝土强度达到设计强度时进行模板拆除;步骤九、检查和验收。通过使用高性能材料来浇筑混凝土,在提高结构强度的同时,也增强了混凝土的耐久性和抗环境影响的能力。
Construction method for integrally-formed building house
The invention relates to the technical field of building construction, and discloses an integrally-formed building house construction method which comprises the following steps: step 1, a design stage: structural parameters of a building design drawing and a detailed construction drawing conform to a preset safety coefficient; 2, preparation work is conducted, specifically, a construction site is cleaned, leveled and compacted; 3, foundation construction, wherein a foundation is built, and reinforcing steel bars are placed in the foundation; fourthly, a formwork is erected, specifically, a formwork system is erected to make preparation for concrete pouring; 5, reinforcing steel bar engineering, wherein reinforcing steel bars are arranged according to the construction drawing; sixthly, concrete is poured, specifically, the concrete is poured into the formwork; 7, a curing stage, wherein the concrete is properly cured; 8, the formwork is dismantled, wherein when the concrete strength reaches the design strength, the formwork is dismantled; and step 9, checking and accepting. And the concrete is poured by using a high-performance material, so that the durability and the environmental influence resistance of the concrete are enhanced while the structural strength is improved.
本申请涉及建筑施工技术领域,公开了一体化成型的建筑房屋施工方法,包括以下步骤:步骤一、设计阶段:建筑设计图纸和详细的施工图的结构参数符合预定的安全系数;步骤二、准备工作:清理施工场地并进行平整和压实;步骤三、基础施工:建造基础并在其中放置钢筋;步骤四、模板搭设:搭建模板系统为浇筑混凝土做准备;步骤五、钢筋工程:根据施工图布置钢筋;步骤六、浇筑混凝土:将混凝土浇筑到模板中;步骤七、养护阶段:对混凝土进行适当的养护;步骤八、拆除模板:混凝土强度达到设计强度时进行模板拆除;步骤九、检查和验收。通过使用高性能材料来浇筑混凝土,在提高结构强度的同时,也增强了混凝土的耐久性和抗环境影响的能力。
Construction method for integrally-formed building house
一体化成型的建筑房屋施工方法
ZHANG GUODONG (author) / LIU YUE'AI (author) / LIU LIANXUAN (author)
2024-09-13
Patent
Electronic Resource
Chinese
Integrally poured building house construction system and construction method
European Patent Office | 2023
|Integrally-poured building house construction device and method
European Patent Office | 2023
|