A platform for research: civil engineering, architecture and urbanism
Mountainous area earth-rock mixed filling high embankment filling construction device and method
The invention provides a mountainous area earth-rock mixed filling high embankment filling construction device which comprises two moving mechanisms, each moving mechanism comprises a bottom plate, a fixing box is fixedly arranged at the bottom of the bottom plate, a driving mechanism is arranged in the fixing box, a supporting plate is fixedly arranged at the top of the bottom plate, and the supporting plate is fixedly arranged on the bottom plate. A storage box is fixedly arranged between the top ends of the supporting plates on the two sides, and feeding mechanisms are arranged in the supporting plates. The high embankment is convenient to reinforce through the combination of the composite reinforcing structure and slope reinforcement, the safety and stability of the mountainous area earth-rock mixed filling high embankment are improved, earth-rock materials are conveniently filled and leveled layer by layer through the filling construction equipment, and the filling efficiency of the earth-rock materials can be improved.
本发明提供一种山区土石混填高路堤填筑施工装置,包括两个移动机构,两个所述移动机构包括底板,所述底板的底部固定设置有固定箱,所述固定箱的内部设置有驱动机构,所述底板的顶部固定设置有支撑板,两侧所述支撑板的顶端之间固定设置有储放箱,所述支撑板的内部设置有送料机构。过复合加固结构和边坡加固相结合方便对高路堤进行加固,提高山区土石混填高路堤的安全和稳定性,并且通过填筑施工设备方便对土石材料进行逐层填筑并平整,能够提高土石材料的填筑效率。
Mountainous area earth-rock mixed filling high embankment filling construction device and method
The invention provides a mountainous area earth-rock mixed filling high embankment filling construction device which comprises two moving mechanisms, each moving mechanism comprises a bottom plate, a fixing box is fixedly arranged at the bottom of the bottom plate, a driving mechanism is arranged in the fixing box, a supporting plate is fixedly arranged at the top of the bottom plate, and the supporting plate is fixedly arranged on the bottom plate. A storage box is fixedly arranged between the top ends of the supporting plates on the two sides, and feeding mechanisms are arranged in the supporting plates. The high embankment is convenient to reinforce through the combination of the composite reinforcing structure and slope reinforcement, the safety and stability of the mountainous area earth-rock mixed filling high embankment are improved, earth-rock materials are conveniently filled and leveled layer by layer through the filling construction equipment, and the filling efficiency of the earth-rock materials can be improved.
本发明提供一种山区土石混填高路堤填筑施工装置,包括两个移动机构,两个所述移动机构包括底板,所述底板的底部固定设置有固定箱,所述固定箱的内部设置有驱动机构,所述底板的顶部固定设置有支撑板,两侧所述支撑板的顶端之间固定设置有储放箱,所述支撑板的内部设置有送料机构。过复合加固结构和边坡加固相结合方便对高路堤进行加固,提高山区土石混填高路堤的安全和稳定性,并且通过填筑施工设备方便对土石材料进行逐层填筑并平整,能够提高土石材料的填筑效率。
Mountainous area earth-rock mixed filling high embankment filling construction device and method
一种山区土石混填高路堤填筑施工装置及方法
LI HUINENG (author) / ZHANG BO (author) / CUI GUANGTAO (author) / WANG QIULI (author) / LI CAN (author)
2024-10-08
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Grouting construction method for filling embankment with loose filling materials
European Patent Office | 2023
|Standardized construction vehicle and construction method for earth-rock mixed filling
European Patent Office | 2022
|Cofferdam embankment filling and closure construction method
European Patent Office | 2021
|