Improved warehouse jumping method for efficient and high-quality construction of ultra-long concrete structure
The invention provides an improved warehouse jumping method for efficient and high-quality construction of an ultra-long concrete structure. The improved warehouse jumping method comprises the steps that a construction area is built; performing a pretreatment process to form a construction area comprising a plurality of construction blocks arranged side by side; erecting a first concrete slab side mold at the boundary of the construction area, and performing early-stage construction in the pouring area; pouring the construction blocks at intervals, and carrying out graded pouring in three time periods to form three pouring bins; the three pouring bins comprise the first pouring bin, the second pouring bin and the third pouring bin composed of chamfers of the corners of the adjacent construction blocks of the first pouring bin and the second pouring bin. By means of the method, the problem that stress concentration occurs at the connecting corner positions of the adjacent areas, and consequently concrete is damaged is solved.
本申请提供了一种超长混凝土结构高效高质施工的改进跳仓法,步骤包括:搭建施工区域;实施预处理工序,以形成包括多个并排且并列的施工区块的施工区域;架设所述施工区域边界的第一混凝土板侧模,并对所述浇筑区域内进行前期施工;间隔浇筑所述施工区块,并分为三个时间段进行分次浇筑,以形成三浇筑仓;所述三浇筑仓包括:第一浇筑仓、第二浇筑仓和由所述第一浇筑仓和第二浇筑仓的相邻所述施工区块角部的切角组成的第三浇筑仓。通过上述方法解决相邻区的连接角部位置出现应力集中,而使混凝土出现损坏的问题。
Improved warehouse jumping method for efficient and high-quality construction of ultra-long concrete structure
The invention provides an improved warehouse jumping method for efficient and high-quality construction of an ultra-long concrete structure. The improved warehouse jumping method comprises the steps that a construction area is built; performing a pretreatment process to form a construction area comprising a plurality of construction blocks arranged side by side; erecting a first concrete slab side mold at the boundary of the construction area, and performing early-stage construction in the pouring area; pouring the construction blocks at intervals, and carrying out graded pouring in three time periods to form three pouring bins; the three pouring bins comprise the first pouring bin, the second pouring bin and the third pouring bin composed of chamfers of the corners of the adjacent construction blocks of the first pouring bin and the second pouring bin. By means of the method, the problem that stress concentration occurs at the connecting corner positions of the adjacent areas, and consequently concrete is damaged is solved.
本申请提供了一种超长混凝土结构高效高质施工的改进跳仓法,步骤包括:搭建施工区域;实施预处理工序,以形成包括多个并排且并列的施工区块的施工区域;架设所述施工区域边界的第一混凝土板侧模,并对所述浇筑区域内进行前期施工;间隔浇筑所述施工区块,并分为三个时间段进行分次浇筑,以形成三浇筑仓;所述三浇筑仓包括:第一浇筑仓、第二浇筑仓和由所述第一浇筑仓和第二浇筑仓的相邻所述施工区块角部的切角组成的第三浇筑仓。通过上述方法解决相邻区的连接角部位置出现应力集中,而使混凝土出现损坏的问题。
Improved warehouse jumping method for efficient and high-quality construction of ultra-long concrete structure
一种超长混凝土结构高效高质施工的改进跳仓法
TANG WEI (author) / LIAO XIANDONG (author) / HAN JIANCONG (author) / LIN SHENG (author) / PAN XIAOMING (author) / YU NINGZHAO (author) / WANG QINYONG (author) / HU WEIBO (author) / GUO XIAOMIN (author) / CHU RUIBING (author)
2024-10-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Mass concrete construction method combining warehouse jumping method and prestress technology
European Patent Office | 2025
|Construction structure and process based on warehouse jumping method
European Patent Office | 2023
|Concrete warehouse construction
Engineering Index Backfile | 1954
Precast concrete warehouse construction
Engineering Index Backfile | 1947
|