A platform for research: civil engineering, architecture and urbanism
Construction structure and process based on warehouse jumping method
The invention relates to the technical field of construction based on a skip method, and discloses a construction structure based on the skip method, comprising: a C-shaped skeleton, in which an inner groove is formed; the plurality of control cabinets are uniformly arranged in the inner groove; the screw rod is rotationally arranged in the control cabinet, and the outer wall of the screw rod is in threaded connection with a nut; moving rods are arranged on the upper side and the lower side of the nut correspondingly, and hooks are fixedly mounted at the ends of the two moving rods correspondingly; after the net body of the steel wire net bypasses the C-shaped framework, the two ends of the steel wire net are hung on the two sets of hooks respectively, the hooks can be moved by controlling rotation of the rotary knob, then the steel wire net is tensioned, the steel wire net is rapidly installed on the C-shaped framework, time and labor are saved, and the construction efficiency is greatly improved. And through the extensible top plate, the C-shaped framework bonded with concrete after construction is completed can be jacked down, the C-shaped framework is more convenient to disassemble, the construction efficiency is further improved, and meanwhile, the concrete cannot be damaged.
本发明涉及跳仓法施工技术领域,且公开了一种基于跳仓法的施工结构,包括:C型骨架,其内部形成有内槽;若干个控制柜,均匀设置在内槽内;丝杆,转动设置在控制柜内,其外壁螺纹连接有丝母;所述丝母的上下两侧均设置有移动杆,两根所述移动杆的端部均固定安装有挂钩;钢丝网的网身绕过C型骨架后,其两端分别挂在两组挂钩上,通过控制旋钮的旋转能够使挂钩移动,进而拉紧钢丝网,实现了钢丝网在C型骨架上的快速安装,省时省力,大大提高了施工效率。通过可伸出的顶板,能够将施工完成后与混凝土粘合在一起的C型骨架顶下,C型骨架的拆卸更加的方便,进一步的提高了施工效率,同时也不会对混凝土造成损伤。
Construction structure and process based on warehouse jumping method
The invention relates to the technical field of construction based on a skip method, and discloses a construction structure based on the skip method, comprising: a C-shaped skeleton, in which an inner groove is formed; the plurality of control cabinets are uniformly arranged in the inner groove; the screw rod is rotationally arranged in the control cabinet, and the outer wall of the screw rod is in threaded connection with a nut; moving rods are arranged on the upper side and the lower side of the nut correspondingly, and hooks are fixedly mounted at the ends of the two moving rods correspondingly; after the net body of the steel wire net bypasses the C-shaped framework, the two ends of the steel wire net are hung on the two sets of hooks respectively, the hooks can be moved by controlling rotation of the rotary knob, then the steel wire net is tensioned, the steel wire net is rapidly installed on the C-shaped framework, time and labor are saved, and the construction efficiency is greatly improved. And through the extensible top plate, the C-shaped framework bonded with concrete after construction is completed can be jacked down, the C-shaped framework is more convenient to disassemble, the construction efficiency is further improved, and meanwhile, the concrete cannot be damaged.
本发明涉及跳仓法施工技术领域,且公开了一种基于跳仓法的施工结构,包括:C型骨架,其内部形成有内槽;若干个控制柜,均匀设置在内槽内;丝杆,转动设置在控制柜内,其外壁螺纹连接有丝母;所述丝母的上下两侧均设置有移动杆,两根所述移动杆的端部均固定安装有挂钩;钢丝网的网身绕过C型骨架后,其两端分别挂在两组挂钩上,通过控制旋钮的旋转能够使挂钩移动,进而拉紧钢丝网,实现了钢丝网在C型骨架上的快速安装,省时省力,大大提高了施工效率。通过可伸出的顶板,能够将施工完成后与混凝土粘合在一起的C型骨架顶下,C型骨架的拆卸更加的方便,进一步的提高了施工效率,同时也不会对混凝土造成损伤。
Construction structure and process based on warehouse jumping method
一种基于跳仓法的施工结构及工艺
LI GUILIN (author) / HONG ZHIRONG (author) / HUANG HAIQUAN (author)
2023-07-28
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Mass concrete construction method combining warehouse jumping method and prestress technology
European Patent Office | 2025
|European Patent Office | 2024
|European Patent Office | 2022
|CONSTRUCTION METHOD OF REFRIGERATED WAREHOUSE, AND STRUCTURE
European Patent Office | 2024
|