Box girder end partition plate post-pouring formwork and construction method
The invention relates to the technical field of box girder mold equipment, in particular to a box girder end partition plate post-pouring formwork and a construction method.The box girder end partition plate post-pouring formwork comprises a functional mechanism, the functional mechanism comprises a bottom frame, a top frame, two side frames and an adjusting component, the bottom frame is fixed between the opposite outer surfaces of the two side frames through bolts, and the adjusting component is fixed between the top frame and the side frames; the top frame is fixedly connected between the opposite outer surfaces of the two side frames through bolts, and pull rods slidably penetrate through the outer surface of one side of the bottom frame. During use, in the pouring process of the box girder body, the mounting pipe is pre-buried in the box girder body, then cutting preparation is conducted on the first adjusting plate and the second adjusting plate according to the actual side face structure of the box girder body, and it is ensured that the outer surfaces of the first adjusting plate and the second adjusting plate can be fully attached to the side face of the box girder body; and then the pull rod is connected with the pre-buried mounting pipe, and then the outer surface of the pull rod is sleeved with the bottom frame and the top frame.
本发明涉及箱梁模具设备技术领域,尤其涉及一种箱梁端隔板后浇模板及施工方法,包括:功能机构,功能机构包括底架、顶架、侧架和调节部件,侧架共设置有两个,底架通过螺栓固定于两个侧架相对外表面之间,顶架通过螺栓固定连接于两个侧架相对外表面之间,底架一侧外表面均滑动贯穿有拉杆。本发明中,使用时,在进行箱梁本体浇筑过程中,将安装管预埋于箱梁本体内部,再根据实际箱梁本体侧面结构进行第一调节板和第二调节板的裁切预备,确保第一调节板和第二调节板外表面能够与箱梁本体侧面充分贴合,进而将拉杆与预埋的安装管进行连接,再将底架和顶架分别套设于拉杆外表面。
Box girder end partition plate post-pouring formwork and construction method
The invention relates to the technical field of box girder mold equipment, in particular to a box girder end partition plate post-pouring formwork and a construction method.The box girder end partition plate post-pouring formwork comprises a functional mechanism, the functional mechanism comprises a bottom frame, a top frame, two side frames and an adjusting component, the bottom frame is fixed between the opposite outer surfaces of the two side frames through bolts, and the adjusting component is fixed between the top frame and the side frames; the top frame is fixedly connected between the opposite outer surfaces of the two side frames through bolts, and pull rods slidably penetrate through the outer surface of one side of the bottom frame. During use, in the pouring process of the box girder body, the mounting pipe is pre-buried in the box girder body, then cutting preparation is conducted on the first adjusting plate and the second adjusting plate according to the actual side face structure of the box girder body, and it is ensured that the outer surfaces of the first adjusting plate and the second adjusting plate can be fully attached to the side face of the box girder body; and then the pull rod is connected with the pre-buried mounting pipe, and then the outer surface of the pull rod is sleeved with the bottom frame and the top frame.
本发明涉及箱梁模具设备技术领域,尤其涉及一种箱梁端隔板后浇模板及施工方法,包括:功能机构,功能机构包括底架、顶架、侧架和调节部件,侧架共设置有两个,底架通过螺栓固定于两个侧架相对外表面之间,顶架通过螺栓固定连接于两个侧架相对外表面之间,底架一侧外表面均滑动贯穿有拉杆。本发明中,使用时,在进行箱梁本体浇筑过程中,将安装管预埋于箱梁本体内部,再根据实际箱梁本体侧面结构进行第一调节板和第二调节板的裁切预备,确保第一调节板和第二调节板外表面能够与箱梁本体侧面充分贴合,进而将拉杆与预埋的安装管进行连接,再将底架和顶架分别套设于拉杆外表面。
Box girder end partition plate post-pouring formwork and construction method
一种箱梁端隔板后浇模板及施工方法
LI JINLONG (author) / WANG TING (author) / YANG BIAO (author) / MA DINGLE (author) / ZHAO YUANBO (author) / QIAO QIAO (author) / WANG JIANBIN (author) / HU PENGTAO (author) / BAI ZHIQIANG (author) / WANG MIN (author)
2024-11-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Formwork, formwork, pouring system and construction method
European Patent Office | 2023
|Construction method for post-pouring belt formwork supporting system
European Patent Office | 2020
|European Patent Office | 2024
|