A platform for research: civil engineering, architecture and urbanism
Construction method for joint structure of newly-built basement and existing basement
The invention discloses a construction method for a joint structure of a newly-built basement and an existing basement, the construction method mainly comprises 28 construction steps, the scientific construction method is formed by the steps S1 to S28 (the steps S1 to S28 are specifically seen in the specification), and the construction method is correspondingly designed for a novel waterproof structure. The construction method specifically relates to construction treatment of a waterproof structure in the process of newly building a basement connecting channel and pouring and forming the connecting channel. By means of the construction method, people can be scientifically guided to construct a newly-built basement connecting channel and a connecting channel, meanwhile, a newly-designed waterproof structure is constructed, and the quality of the structure of the connecting position of the newly-built basement and an existing basement is more reliable; the construction method is specific and meticulous, and the construction quality problem caused by insufficient cognition and wrong construction sequence of people can be avoided; and meanwhile, the construction method can improve the construction efficiency and standardize the construction behavior.
本发明公开了一种新建地下室与现有地下室连接处结构的施工方法,其中的施工方法主要包括28个施工步骤,由S1步骤至S28步骤形成科学的施工方法(S1步骤至S28步骤具体详看说明书),该施工方法是针对新型防水结构所对应设计的,其具体涉及到了新建地下室连接通道与连接通道浇筑成型过程中对于防水结构的施工处理;本施工方法的出现可以科学指导人们对新建地下室连接通道和连接通道进行施工,同时施工好新设计的防水结构,使新建地下室与现有地下室连接处结构的质量更加可靠;本发明的施工方法具体且细致,可以避免人们因认知不足、施工错序,所引起的施工质量问题;同时本发明的施工方法可以提高施工效率,规范施工行为。
Construction method for joint structure of newly-built basement and existing basement
The invention discloses a construction method for a joint structure of a newly-built basement and an existing basement, the construction method mainly comprises 28 construction steps, the scientific construction method is formed by the steps S1 to S28 (the steps S1 to S28 are specifically seen in the specification), and the construction method is correspondingly designed for a novel waterproof structure. The construction method specifically relates to construction treatment of a waterproof structure in the process of newly building a basement connecting channel and pouring and forming the connecting channel. By means of the construction method, people can be scientifically guided to construct a newly-built basement connecting channel and a connecting channel, meanwhile, a newly-designed waterproof structure is constructed, and the quality of the structure of the connecting position of the newly-built basement and an existing basement is more reliable; the construction method is specific and meticulous, and the construction quality problem caused by insufficient cognition and wrong construction sequence of people can be avoided; and meanwhile, the construction method can improve the construction efficiency and standardize the construction behavior.
本发明公开了一种新建地下室与现有地下室连接处结构的施工方法,其中的施工方法主要包括28个施工步骤,由S1步骤至S28步骤形成科学的施工方法(S1步骤至S28步骤具体详看说明书),该施工方法是针对新型防水结构所对应设计的,其具体涉及到了新建地下室连接通道与连接通道浇筑成型过程中对于防水结构的施工处理;本施工方法的出现可以科学指导人们对新建地下室连接通道和连接通道进行施工,同时施工好新设计的防水结构,使新建地下室与现有地下室连接处结构的质量更加可靠;本发明的施工方法具体且细致,可以避免人们因认知不足、施工错序,所引起的施工质量问题;同时本发明的施工方法可以提高施工效率,规范施工行为。
Construction method for joint structure of newly-built basement and existing basement
新建地下室与现有地下室连接处结构的施工方法
WANG WEIJIANG (author) / YU JINCHENG (author) / ZHOU PING (author) / GAO HAITAO (author) / LI JINBIN (author) / YU JIARONG (author) / LI DAHUI (author) / ZHOU YAN (author) / XU JINMIN (author) / ZHENG QIUZHOU (author)
2024-11-26
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|BASEMENT ATTIC STRUCTURE, AND BASEMENT CONSTRUCTION METHOD USING THE BASEMENT ATTIC STRUCTURE
European Patent Office | 2018
|Basement floor construction method and basement floor structure
European Patent Office | 2020
|European Patent Office | 2023
|European Patent Office | 2024
|