Tubular pile sinking construction method, device and equipment for offshore mudflat photovoltaic project and medium
The invention relates to the technical field of tubular pile foundation construction, and discloses an offshore mud flat photovoltaic project tubular pile sinking construction method, device and equipment and a medium, and the method comprises the following steps: determining coordinate values of all tubular piles in a to-be-constructed photovoltaic area based on preset feature point coordinates of the to-be-constructed photovoltaic area; real-time positioning is conducted on the pile position corresponding to each tubular pile based on the tubular pile coordinate values, and positioning points of all the pile positions are obtained; the pile position is adjusted and rechecked on the basis of a preset precision threshold value and each positioning point, so that the pile driver sinks the tubular pile; after pile sinking of the tubular piles at all the positioning points is completed, retesting the construction precision parameter of each tubular pile to obtain a retesting result; comparing the retest result with a preset precision threshold value to obtain a comparison deviation; and correcting the construction precision parameter of the pipe pile based on the comparison deviation. According to the method, the pile sinking accuracy is remarkably improved by accurately measuring the coordinate values of all the pipe piles before construction, positioning and rectifying deviation in real time during construction and remeasuring and correcting construction accuracy parameters after construction.
本发明涉及管桩基础施工技术领域,公开了海上滩涂光伏项目管桩沉桩施工方法、装置、设备及介质,该方法包括:基于待施工光伏区预设特征点坐标确定待施工光伏区内所有管桩坐标值;基于管桩坐标值对每个管桩对应桩位进行实时定位,得到所有桩位的定位点;基于预设精度阈值和每个定位点对桩位位置进行调整和复核,使得打桩机进行管桩沉桩;当所有定位点的管桩沉桩完成后,对每个管桩施工精度参数进行复测,得到复测结果;将复测结果与预设精度阈值进行对比,得到对比偏差;基于对比偏差对管桩施工精度参数进行修正。本发明通过施工前精确测量所有管桩坐标值、施工中实时定位纠偏、施工后进行施工精度参数复测并进行修正,显著提高了沉桩精确度。
Tubular pile sinking construction method, device and equipment for offshore mudflat photovoltaic project and medium
The invention relates to the technical field of tubular pile foundation construction, and discloses an offshore mud flat photovoltaic project tubular pile sinking construction method, device and equipment and a medium, and the method comprises the following steps: determining coordinate values of all tubular piles in a to-be-constructed photovoltaic area based on preset feature point coordinates of the to-be-constructed photovoltaic area; real-time positioning is conducted on the pile position corresponding to each tubular pile based on the tubular pile coordinate values, and positioning points of all the pile positions are obtained; the pile position is adjusted and rechecked on the basis of a preset precision threshold value and each positioning point, so that the pile driver sinks the tubular pile; after pile sinking of the tubular piles at all the positioning points is completed, retesting the construction precision parameter of each tubular pile to obtain a retesting result; comparing the retest result with a preset precision threshold value to obtain a comparison deviation; and correcting the construction precision parameter of the pipe pile based on the comparison deviation. According to the method, the pile sinking accuracy is remarkably improved by accurately measuring the coordinate values of all the pipe piles before construction, positioning and rectifying deviation in real time during construction and remeasuring and correcting construction accuracy parameters after construction.
本发明涉及管桩基础施工技术领域,公开了海上滩涂光伏项目管桩沉桩施工方法、装置、设备及介质,该方法包括:基于待施工光伏区预设特征点坐标确定待施工光伏区内所有管桩坐标值;基于管桩坐标值对每个管桩对应桩位进行实时定位,得到所有桩位的定位点;基于预设精度阈值和每个定位点对桩位位置进行调整和复核,使得打桩机进行管桩沉桩;当所有定位点的管桩沉桩完成后,对每个管桩施工精度参数进行复测,得到复测结果;将复测结果与预设精度阈值进行对比,得到对比偏差;基于对比偏差对管桩施工精度参数进行修正。本发明通过施工前精确测量所有管桩坐标值、施工中实时定位纠偏、施工后进行施工精度参数复测并进行修正,显著提高了沉桩精确度。
Tubular pile sinking construction method, device and equipment for offshore mudflat photovoltaic project and medium
海上滩涂光伏项目管桩沉桩施工方法、装置、设备及介质
WU FENGYUN (author) / LIU ANNING (author) / FENG HEJING (author) / ZHANG JIANWEN (author) / GUO SIYUAN (author) / ZHANG HANYU (author) / JIA BIN (author) / WANG ERPENG (author) / CHEN ANZHONG (author) / FAN JIALE (author)
2024-11-29
Patent
Electronic Resource
Chinese
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
G01S
RADIO DIRECTION-FINDING
,
Funkpeilung
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
Offshore pile sinking construction method for concrete tubular pile
European Patent Office | 2021
|Pile sinking construction method for tubular pile in water photovoltaic area
European Patent Office | 2024
|Photovoltaic pile foundation construction method in mudflat area
European Patent Office | 2024
|