Reinforcing system construction method for high-rise building parapet wall formwork
The invention relates to the technical field of house buildings, and discloses a reinforcing system construction method for a high-rise building parapet template, comprising a roof steel beam, vertical angle steel and horizontal angle steel are welded on the side surface of the roof steel beam before the roof steel beam is hoisted, the vertical angle steel is welded with the side surface of a steel beam flange, and is welded with a steel beam web through reinforcing angle steel; the stability of the vertical angle steel is enhanced, after the steel beam is hoisted in place, the vertical angle steel and the horizontal angle steel jointly form a temporary edge protection rail, the horizontal angle steel is drilled in advance, the hole diameter is 1 mm larger than the diameter of a split bolt, and the drilling distance is evenly distributed according to 400 mm; the method is used for installing and reinforcing the template of the parapet wall under the condition that no outer frame exists on the steel structure roof of the high-rise building, construction is easy, operation is convenient, the quality is reliable, the safety risk is low, the used materials can be recycled, and the cost is low.
本发明涉及房屋建筑技术领域,且公开了用于高层建筑女儿墙模板的加固体系施工方法,包括屋面钢梁,所述屋面钢梁吊装前在其侧面焊接竖向角钢和水平角钢,竖向角钢与钢梁翼缘侧面焊接,并通过加固角钢与钢梁腹板焊接,对竖向角钢进行稳定性加强,钢梁吊装到位后,竖向角钢与水平角钢共同形成临时临边防护栏杆,水平角钢提前钻孔,孔径比对拉螺栓直径大1mm,钻孔间距按400mm均匀分布,本发明所述的方法用于高层建筑钢结构屋面在无外架条件下女儿墙的模板安装及加固,施工简单,便于操作,质量可靠,安全风险低,并且所用材料可回收,成本低。
Reinforcing system construction method for high-rise building parapet wall formwork
The invention relates to the technical field of house buildings, and discloses a reinforcing system construction method for a high-rise building parapet template, comprising a roof steel beam, vertical angle steel and horizontal angle steel are welded on the side surface of the roof steel beam before the roof steel beam is hoisted, the vertical angle steel is welded with the side surface of a steel beam flange, and is welded with a steel beam web through reinforcing angle steel; the stability of the vertical angle steel is enhanced, after the steel beam is hoisted in place, the vertical angle steel and the horizontal angle steel jointly form a temporary edge protection rail, the horizontal angle steel is drilled in advance, the hole diameter is 1 mm larger than the diameter of a split bolt, and the drilling distance is evenly distributed according to 400 mm; the method is used for installing and reinforcing the template of the parapet wall under the condition that no outer frame exists on the steel structure roof of the high-rise building, construction is easy, operation is convenient, the quality is reliable, the safety risk is low, the used materials can be recycled, and the cost is low.
本发明涉及房屋建筑技术领域,且公开了用于高层建筑女儿墙模板的加固体系施工方法,包括屋面钢梁,所述屋面钢梁吊装前在其侧面焊接竖向角钢和水平角钢,竖向角钢与钢梁翼缘侧面焊接,并通过加固角钢与钢梁腹板焊接,对竖向角钢进行稳定性加强,钢梁吊装到位后,竖向角钢与水平角钢共同形成临时临边防护栏杆,水平角钢提前钻孔,孔径比对拉螺栓直径大1mm,钻孔间距按400mm均匀分布,本发明所述的方法用于高层建筑钢结构屋面在无外架条件下女儿墙的模板安装及加固,施工简单,便于操作,质量可靠,安全风险低,并且所用材料可回收,成本低。
Reinforcing system construction method for high-rise building parapet wall formwork
用于高层建筑女儿墙模板的加固体系施工方法
DENG BINGYIN (author) / ZHANG PING (author) / WU LIUJIANG (author) / YAN JIE (author) / MA YUFENG (author)
2024-12-06
Patent
Electronic Resource
Chinese
Pitched roof parapet wall formwork system and construction method
European Patent Office | 2024
|Formwork-free integrated rapid construction method for gutter parapet wall
European Patent Office | 2024
|European Patent Office | 2020
|