A platform for research: civil engineering, architecture and urbanism
Wind power mixed tower dismantling method
The invention relates to the technical field of wind power mixed tower tube dismantling construction, and discloses a wind power mixed tower dismantling method which comprises the steps of steel strand dismantling, adapter ring dismantling, mixed tower section dismantling and bottom platform and converter dismantling. And unloading operation can be carried out at any position of the steel strand, the working procedure is simple and efficient, and personnel operation is safe. By orderly implementing the steps of steel strand dismantling, adapter ring dismantling, mixed tower section dismantling and bottom platform and converter dismantling, it can be guaranteed that the tower drum of the wind power mixed tower is completely dismantled, the complete tower drum cannot be damaged, and the safety of constructors is guaranteed.
本发明涉及风力混塔塔筒拆除施工技术领域,公开一种风电混塔拆除方法,包括钢绞线拆除、转接环拆除、混塔段拆除以及底平台及变流器拆卸,通过采用上述步骤,能够实现对风电混塔塔筒的拆除,利用卸载装置,可在钢绞线任意位置进行卸载作业,且工序简单高效,人员操作安全。通过对步骤钢绞线拆除、转接环拆除、混塔段拆除以及底平台及变流器拆卸有序实施,能够保证风电混塔塔筒完全拆除,且不会对完好塔筒造成损坏,保证施工人员的安全。
Wind power mixed tower dismantling method
The invention relates to the technical field of wind power mixed tower tube dismantling construction, and discloses a wind power mixed tower dismantling method which comprises the steps of steel strand dismantling, adapter ring dismantling, mixed tower section dismantling and bottom platform and converter dismantling. And unloading operation can be carried out at any position of the steel strand, the working procedure is simple and efficient, and personnel operation is safe. By orderly implementing the steps of steel strand dismantling, adapter ring dismantling, mixed tower section dismantling and bottom platform and converter dismantling, it can be guaranteed that the tower drum of the wind power mixed tower is completely dismantled, the complete tower drum cannot be damaged, and the safety of constructors is guaranteed.
本发明涉及风力混塔塔筒拆除施工技术领域,公开一种风电混塔拆除方法,包括钢绞线拆除、转接环拆除、混塔段拆除以及底平台及变流器拆卸,通过采用上述步骤,能够实现对风电混塔塔筒的拆除,利用卸载装置,可在钢绞线任意位置进行卸载作业,且工序简单高效,人员操作安全。通过对步骤钢绞线拆除、转接环拆除、混塔段拆除以及底平台及变流器拆卸有序实施,能够保证风电混塔塔筒完全拆除,且不会对完好塔筒造成损坏,保证施工人员的安全。
Wind power mixed tower dismantling method
一种风电混塔拆除方法
ZHANG DONGLIANG (author) / FU KUN (author) / YUAN ZHONGSHUAI (author) / SHEN HONGZHUANG (author) / LU ZEXING (author) / MA XULIANG (author) / YU JINGJING (author) / LI HONGJIE (author) / HE LAN (author) / BAI TIELEI (author)
2024-12-27
Patent
Electronic Resource
Chinese
Dismantling method and dismantling auxiliary device for mixed tower
European Patent Office | 2024
|DISMANTLING METHOD OF TOWER-TYPE WIND POWER GENERATION SYSTEM
European Patent Office | 2024
|TOWER-SHAPED STRUCTURE DISMANTLING METHOD AND TOWER-SHAPED STRUCTURE DISMANTLING DEVICE
European Patent Office | 2021
|Cable-stayed bridge main tower dismantling method and multifunctional tower dismantling machine
European Patent Office | 2024
|Dismantling method and dismantling system for chemical debenzolization tower
European Patent Office | 2022
|