A platform for research: civil engineering, architecture and urbanism
TOWER-SHAPED STRUCTURE DISMANTLING METHOD AND TOWER-SHAPED STRUCTURE DISMANTLING DEVICE
To provide an efficient and low-cost dismantling method of a tower-shaped structure.SOLUTION: The dismantling method includes a step of obtaining a cutting piece connected to first coupling means connected to the main winch wire of the main winch and second coupling means connected to the sub winch wire of the sub winch, in which the cutting piece is obtained by cutting a portion of the upper part of the tower-shaped structure at the first height level, a step of lifting the cutting piece with the sub winch wire and reducing looseness of the first coupling means connected to the cutting piece, a step of stretching the sub winch wire, whereby the cutting piece is suspended in the vertical direction by the first coupling means, and a step of lowering the cutting piece to the ground by stretching the main winch wire.SELECTED DRAWING: Figure 1
【課題】効率的かつ低コストな塔状構造物の解体方法。【解決手段】メインウィンチのメインウィンチワイヤと接続された第1の結合手段およびサブウィンチのサブウィンチワイヤと接続された第2の結合手段に連結された、切断ピースを得るステップであって、前記切断ピースは、第1の高さレベルにおいて、塔状構造物の上部の一部を切断することにより得られる、ステップと、前記切断ピースを前記サブウィンチワイヤで吊り上げるとともに、前記切断ピースに接続された前記第1の結合手段の緩みを低減するステップと、前記サブウィンチワイヤを延伸させるステップであって、これにより、前記切断ピースは、前記第1の結合手段により、鉛直方向に吊り下げられる、ステップと、前記メインウィンチワイヤを延伸させることにより、前記切断ピースを地上まで降ろすステップと、を有する、解体方法。【選択図】図1
TOWER-SHAPED STRUCTURE DISMANTLING METHOD AND TOWER-SHAPED STRUCTURE DISMANTLING DEVICE
To provide an efficient and low-cost dismantling method of a tower-shaped structure.SOLUTION: The dismantling method includes a step of obtaining a cutting piece connected to first coupling means connected to the main winch wire of the main winch and second coupling means connected to the sub winch wire of the sub winch, in which the cutting piece is obtained by cutting a portion of the upper part of the tower-shaped structure at the first height level, a step of lifting the cutting piece with the sub winch wire and reducing looseness of the first coupling means connected to the cutting piece, a step of stretching the sub winch wire, whereby the cutting piece is suspended in the vertical direction by the first coupling means, and a step of lowering the cutting piece to the ground by stretching the main winch wire.SELECTED DRAWING: Figure 1
【課題】効率的かつ低コストな塔状構造物の解体方法。【解決手段】メインウィンチのメインウィンチワイヤと接続された第1の結合手段およびサブウィンチのサブウィンチワイヤと接続された第2の結合手段に連結された、切断ピースを得るステップであって、前記切断ピースは、第1の高さレベルにおいて、塔状構造物の上部の一部を切断することにより得られる、ステップと、前記切断ピースを前記サブウィンチワイヤで吊り上げるとともに、前記切断ピースに接続された前記第1の結合手段の緩みを低減するステップと、前記サブウィンチワイヤを延伸させるステップであって、これにより、前記切断ピースは、前記第1の結合手段により、鉛直方向に吊り下げられる、ステップと、前記メインウィンチワイヤを延伸させることにより、前記切断ピースを地上まで降ろすステップと、を有する、解体方法。【選択図】図1
TOWER-SHAPED STRUCTURE DISMANTLING METHOD AND TOWER-SHAPED STRUCTURE DISMANTLING DEVICE
塔状構造物の解体方法および塔状構造物の解体装置
MATSUSHIMA SETSUO (author)
2021-05-27
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Dismantling method and dismantling auxiliary device for mixed tower
European Patent Office | 2024
|Cable-stayed bridge main tower dismantling method and multifunctional tower dismantling machine
European Patent Office | 2024
|Dismantling structure and dismantling method of alpine and valley ultrahigh tower
European Patent Office | 2023
|Dismantling method and dismantling system for chemical debenzolization tower
European Patent Office | 2022
|