The invention relates to the technical field of building repair, in particular to an outer wall screw hole blocking construction method which comprises the steps that a data acquisition instrument is connected with a pressure sensor through a data transmission line, and the pressure sensor is placed in a screw hole; grouting is conducted through a pressure grouting gun; mortar extrudes the detachable probing component in the hole, the actual pressure value is measured through the pressure sensor, in the grouting process, the pressure in the digital display pressure grouting gun changes along with the grouting condition, the pressure in the gun after qualified grouting of the screw hole can be determined, after the grouting is qualified, a semitransparent fixed plugging piece is used for plugging, and after the inspection is qualified, the pressure in the gun can be determined. An operator sleeves the plastering size limiter to the side, needing to be blocked by mortar, of the screw hole of the outer wall, and plastering is conducted; by analyzing the pressure test value, the external wall screw hole plugging condition in a certain time period is visually known, standardized construction is carried out, the plastering size limiter can form a round plastering face of a standard style, and standardized construction is carried out.
本发明涉及建筑修复技术领域,尤其涉及一种外墙螺杆洞封堵施工方法,步骤包括:使用数据传输线将数据采集仪表与压力传感器相连,将压力传感器置入螺杆孔洞中;通过压力注浆枪进行注浆;砂浆在孔洞内挤压可拆卸探入部件,将实际压力值通过压力感应器进行测定,注浆过程中,数显压力注浆枪中压力随注浆情况进行变化,可明确螺杆洞注浆合格后枪内压力,注浆合格后,使用半透明固定封堵片进行封堵,检验合格后,操作者将抹灰尺寸限定器套至外墙螺杆洞需砂浆封堵一侧,进行抹灰;本发明通过对压力测试值进行分析,直观的了解某一时间段中的外墙螺杆洞封堵情况,进行标准化施工,抹灰尺寸限定器能够形成标准样式的圆形抹灰面,进行标准化施工。
Outer wall screw hole blocking construction method
The invention relates to the technical field of building repair, in particular to an outer wall screw hole blocking construction method which comprises the steps that a data acquisition instrument is connected with a pressure sensor through a data transmission line, and the pressure sensor is placed in a screw hole; grouting is conducted through a pressure grouting gun; mortar extrudes the detachable probing component in the hole, the actual pressure value is measured through the pressure sensor, in the grouting process, the pressure in the digital display pressure grouting gun changes along with the grouting condition, the pressure in the gun after qualified grouting of the screw hole can be determined, after the grouting is qualified, a semitransparent fixed plugging piece is used for plugging, and after the inspection is qualified, the pressure in the gun can be determined. An operator sleeves the plastering size limiter to the side, needing to be blocked by mortar, of the screw hole of the outer wall, and plastering is conducted; by analyzing the pressure test value, the external wall screw hole plugging condition in a certain time period is visually known, standardized construction is carried out, the plastering size limiter can form a round plastering face of a standard style, and standardized construction is carried out.
本发明涉及建筑修复技术领域,尤其涉及一种外墙螺杆洞封堵施工方法,步骤包括:使用数据传输线将数据采集仪表与压力传感器相连,将压力传感器置入螺杆孔洞中;通过压力注浆枪进行注浆;砂浆在孔洞内挤压可拆卸探入部件,将实际压力值通过压力感应器进行测定,注浆过程中,数显压力注浆枪中压力随注浆情况进行变化,可明确螺杆洞注浆合格后枪内压力,注浆合格后,使用半透明固定封堵片进行封堵,检验合格后,操作者将抹灰尺寸限定器套至外墙螺杆洞需砂浆封堵一侧,进行抹灰;本发明通过对压力测试值进行分析,直观的了解某一时间段中的外墙螺杆洞封堵情况,进行标准化施工,抹灰尺寸限定器能够形成标准样式的圆形抹灰面,进行标准化施工。
Outer wall screw hole blocking construction method
一种外墙螺杆洞封堵施工方法
WANG YULONG (author) / MEN XIANJUN (author) / LIU JI (author) / YAO JIANJUN (author) / YU TIANHANG (author) / FENG SHAOWEI (author) / EN YANFENG (author) / ZHANG ZHENGPING (author) / SUN DUOSI (author) / GUO QINGKANG (author)
2025-01-24
Patent
Electronic Resource
Chinese
Blocking construction process for fully-interspersed outer wall screw hole
European Patent Office | 2022
|European Patent Office | 2015
|Construction method for blocking outer wall screw hole by polyurethane foaming agent