SIDE WALL ERECTION METHOD AND DEVICE FOR HANGING SCAFFOLD
PROBLEM TO BE SOLVED: To provide a method and a device for erecting a side wall at a side end of a hanging scaffold configured along an elevated structure.SOLUTION: A hanging scaffold is configured by hanging numerous scaffold boards 3 with a cable from an elevated structure, the numerous scaffold boards being lined up with a prescribed interval in between, with a frame installed on a shorter side edge of each scaffold board facing the direction of extension of the elevated structure, and connecting the shorter side edges of adjacent scaffold boards with connecting means, in a way that allows interval adjustment. A construction method for the hanging scaffold comprises the steps for: erecting a standing component 9 on the frame of the prescribed scaffold boards 3,3 among the scaffold boards that are lined up, separated in correspondence with a plurality of intervals Pn; connecting the plurality of erected standing components 9,9 to each other with a connecting member 10; inserting a wall panel body 11 between the erected standing components 9,9 and fitting edges on both sides of the wall panel body to the respective standing components 9,9.
【課題】高架構築物に沿って構築された吊り足場の側端部に側壁を立設するための工法及び装置を提供する。【解決手段】高架構築物に多数の足場板3を索条により吊持すると共に、各足場板の妻側縁部に設けたフレームを前記高架構築物の延長方向に向けた状態で多数の足場板を所定ピッチで列設し、隣り合う足場板の妻側縁部を継手手段により相互に間隔調節可能に連結して成る吊り足場において、列設された足場板のうち複数ピッチPnに相当して離間する所定足場板3,3のフレームに起立構成体9を立設する工程と、立設された複数の起立構成体9,9を相互に連結部材10により連結する工程と、立設された起立構成体9,9の間に壁面パネル体11を配設し、該壁面パネル体の両側縁部をそれぞれ起立構成体9,9に取着する工程により構成されている。【選択図】図2
SIDE WALL ERECTION METHOD AND DEVICE FOR HANGING SCAFFOLD
PROBLEM TO BE SOLVED: To provide a method and a device for erecting a side wall at a side end of a hanging scaffold configured along an elevated structure.SOLUTION: A hanging scaffold is configured by hanging numerous scaffold boards 3 with a cable from an elevated structure, the numerous scaffold boards being lined up with a prescribed interval in between, with a frame installed on a shorter side edge of each scaffold board facing the direction of extension of the elevated structure, and connecting the shorter side edges of adjacent scaffold boards with connecting means, in a way that allows interval adjustment. A construction method for the hanging scaffold comprises the steps for: erecting a standing component 9 on the frame of the prescribed scaffold boards 3,3 among the scaffold boards that are lined up, separated in correspondence with a plurality of intervals Pn; connecting the plurality of erected standing components 9,9 to each other with a connecting member 10; inserting a wall panel body 11 between the erected standing components 9,9 and fitting edges on both sides of the wall panel body to the respective standing components 9,9.
【課題】高架構築物に沿って構築された吊り足場の側端部に側壁を立設するための工法及び装置を提供する。【解決手段】高架構築物に多数の足場板3を索条により吊持すると共に、各足場板の妻側縁部に設けたフレームを前記高架構築物の延長方向に向けた状態で多数の足場板を所定ピッチで列設し、隣り合う足場板の妻側縁部を継手手段により相互に間隔調節可能に連結して成る吊り足場において、列設された足場板のうち複数ピッチPnに相当して離間する所定足場板3,3のフレームに起立構成体9を立設する工程と、立設された複数の起立構成体9,9を相互に連結部材10により連結する工程と、立設された起立構成体9,9の間に壁面パネル体11を配設し、該壁面パネル体の両側縁部をそれぞれ起立構成体9,9に取着する工程により構成されている。【選択図】図2
SIDE WALL ERECTION METHOD AND DEVICE FOR HANGING SCAFFOLD
吊り足場における側壁立設工法及び装置
KOSAKE SHINTARO (author)
2015-12-21
Patent
Electronic Resource
Japanese