CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
PROBLEM TO BE SOLVED: To provide a construction method of a base-isolated building capable of shortening a destabilization period of base isolation performance under construction, by shortening connection construction of a plurality of base-isolated building parts to a short construction period.SOLUTION: A construction method of a base-isolated building is provide for constructing the base-isolated building 30 of integrating a plurality of base-isolated building parts 10 and 20, by respectively connecting mutual foundation parts 11 and 21 and mutual upper skeleton parts 12 and 22 of the plurality of base-isolated building parts 10 and 20 built at an interval via a connection foundation part 2 and a connection upper skeleton part 3, and placement of concrete is executed in a state of installing a form 4 for the connection foundation part, a form 5 for the connection upper skeleton part and a form support device 6 for supporting these both forms 4 and 5 for constructing the connection foundation part 2 and the connection upper skeleton part 3.
【課題】複数の免震建物部の接続工事を短工期化し、建築中における免震性能の不安定化期間を短くすることのできる免震建物の建築方法を提供する。【解決手段】間隔を空けて建てられた複数の免震建物部10、20の基礎部11、21どうし及び上部躯体部12、22どうしを接続用基礎部2及び接続用上部躯体部3を介して夫々接続し、複数の免震建物部10、20が一体化された免震建物30を建築する免震建物の建築方法であって、接続用基礎部2と接続用上部躯体部3を構築するのに、接続用基礎部用の型枠4と、接続用上部躯体部用の型枠5と、これら両型枠4、5を支持する型枠支持装置6とを設置した状態でコンクリートの打設を実施する。【選択図】図2
CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
PROBLEM TO BE SOLVED: To provide a construction method of a base-isolated building capable of shortening a destabilization period of base isolation performance under construction, by shortening connection construction of a plurality of base-isolated building parts to a short construction period.SOLUTION: A construction method of a base-isolated building is provide for constructing the base-isolated building 30 of integrating a plurality of base-isolated building parts 10 and 20, by respectively connecting mutual foundation parts 11 and 21 and mutual upper skeleton parts 12 and 22 of the plurality of base-isolated building parts 10 and 20 built at an interval via a connection foundation part 2 and a connection upper skeleton part 3, and placement of concrete is executed in a state of installing a form 4 for the connection foundation part, a form 5 for the connection upper skeleton part and a form support device 6 for supporting these both forms 4 and 5 for constructing the connection foundation part 2 and the connection upper skeleton part 3.
【課題】複数の免震建物部の接続工事を短工期化し、建築中における免震性能の不安定化期間を短くすることのできる免震建物の建築方法を提供する。【解決手段】間隔を空けて建てられた複数の免震建物部10、20の基礎部11、21どうし及び上部躯体部12、22どうしを接続用基礎部2及び接続用上部躯体部3を介して夫々接続し、複数の免震建物部10、20が一体化された免震建物30を建築する免震建物の建築方法であって、接続用基礎部2と接続用上部躯体部3を構築するのに、接続用基礎部用の型枠4と、接続用上部躯体部用の型枠5と、これら両型枠4、5を支持する型枠支持装置6とを設置した状態でコンクリートの打設を実施する。【選択図】図2
CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
免震建物の建築方法
NAKANO HIROHISA (author) / SHIMONO KOICHI (author) / SAITO YUICHI (author) / KOJIMA KATSUMI (author) / ISHII MANABU (author) / SUGIMOTO SHUNSUKE (author) / OKADA HIDEAKI (author) / OKEGAWA TAKAHIRO (author)
2016-01-21
Patent
Electronic Resource
Japanese
BASE-ISOLATED BUILDING AND CONSTRUCTION METHOD FOR BASE-ISOLATED STRUCTURE
European Patent Office | 2019
|