METHOD OF CONSTRUCTING WALL BODY
PROBLEM TO BE SOLVED: To provide a method of constructing a wall body in which pre-stress in a circumferential direction can be efficiently introduced, and a wall body is fixed when the wall body is completed.SOLUTION: Concrete 80 of a dike 2 is cast while pipes 64a, 64b, sheath tubes 63, 64c, etc., are fitted therein with a perpendicular PC steel material 17a and a perpendicular reinforcing bar 19a extending from a bottom slab 5. A dike bottom part is installed movably while the pipe 64b buried in the concrete 80 is supported by the pipe 64a buried in the bottom slab 5. A rubber plate 66 is arranged between the pipes 64a, 64b. When pre-stress is introduced in a circumferential direction of the dike 2, the whole dike including the bottom part moves inward. Then cement mortar 71 is charged between the dike bottom part and the bottom slab 5 below it and so on. After the cement mortar 71 is hardened, the PC steel material 17a is tensed to introduce perpendicular prestress into the dike 2, and cement milk 73 is charged in the pipes 64a, 64b, rubber plate 66, etc.SELECTED DRAWING: Figure 4
【課題】周方向のプレストレスを効率よく導入できるとともに完成時には壁体が固定される壁体の構築方法を提供する。【解決手段】底版5から延びる鉛直方向PC鋼材17aや鉛直方向鉄筋19aに、パイプ64a、64b、シース管63、64c等を通した状態で、防液堤2のコンクリート80を打設する。防液堤底部は、底版5に埋設したパイプ64aでコンクリート80に埋設したパイプ64bを支持して移動可能に配置される。パイプ64a、64b間には、ゴム板66が配置される。防液堤2の周方向にプレストレスを導入すると、底部を含む防液堤全体が内側に移動する。その後、防液堤底部とその下方の底版5の間等にモルタル71を充填する。モルタル71の硬化後、PC鋼材17aを緊張して防液堤2に鉛直方向のプレストレスを導入し、パイプ64a、64b、ゴム板66等にセメントミルク73を充填する。【選択図】図4
METHOD OF CONSTRUCTING WALL BODY
PROBLEM TO BE SOLVED: To provide a method of constructing a wall body in which pre-stress in a circumferential direction can be efficiently introduced, and a wall body is fixed when the wall body is completed.SOLUTION: Concrete 80 of a dike 2 is cast while pipes 64a, 64b, sheath tubes 63, 64c, etc., are fitted therein with a perpendicular PC steel material 17a and a perpendicular reinforcing bar 19a extending from a bottom slab 5. A dike bottom part is installed movably while the pipe 64b buried in the concrete 80 is supported by the pipe 64a buried in the bottom slab 5. A rubber plate 66 is arranged between the pipes 64a, 64b. When pre-stress is introduced in a circumferential direction of the dike 2, the whole dike including the bottom part moves inward. Then cement mortar 71 is charged between the dike bottom part and the bottom slab 5 below it and so on. After the cement mortar 71 is hardened, the PC steel material 17a is tensed to introduce perpendicular prestress into the dike 2, and cement milk 73 is charged in the pipes 64a, 64b, rubber plate 66, etc.SELECTED DRAWING: Figure 4
【課題】周方向のプレストレスを効率よく導入できるとともに完成時には壁体が固定される壁体の構築方法を提供する。【解決手段】底版5から延びる鉛直方向PC鋼材17aや鉛直方向鉄筋19aに、パイプ64a、64b、シース管63、64c等を通した状態で、防液堤2のコンクリート80を打設する。防液堤底部は、底版5に埋設したパイプ64aでコンクリート80に埋設したパイプ64bを支持して移動可能に配置される。パイプ64a、64b間には、ゴム板66が配置される。防液堤2の周方向にプレストレスを導入すると、底部を含む防液堤全体が内側に移動する。その後、防液堤底部とその下方の底版5の間等にモルタル71を充填する。モルタル71の硬化後、PC鋼材17aを緊張して防液堤2に鉛直方向のプレストレスを導入し、パイプ64a、64b、ゴム板66等にセメントミルク73を充填する。【選択図】図4
METHOD OF CONSTRUCTING WALL BODY
壁体の構築方法
MATSUURA MASANORI (author) / YASUNAGA MASAMICHI (author)
2016-04-21
Patent
Electronic Resource
Japanese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
WALL BODY STRUCTURE AND METHOD OF CONSTRUCTING WALL BODY STRUCTURE
European Patent Office | 2022
|WALL COVERING BODY AND METHOD FOR CONSTRUCTING WALL COVERING BODY
European Patent Office | 2017
|CORE MATERIAL FOR CONSTRUCTING WALL BODY, AND CONSTRUCTION METHOD
European Patent Office | 2023
|European Patent Office | 2020
|