A platform for research: civil engineering, architecture and urbanism
VIBRATION CONTROL BUILDING
PROBLEM TO BE SOLVED: To provide a vibration control building such that one building is constructed with two independent buildings differing in natural period and a vibration control device is installed between both and that can have all spaces in the building effectively utilized without being wasted while neither of deformation modes of the two independent buildings differing in natural period is affected.SOLUTION: A vibration control building comprises: a first building; a second building comprising a lower main building and an upper main building constructed thereupon; and a vibration control device connecting the lower main building to the first building. The upper main building is constructed in a plane shape such that a perpendicular load can be transmitted to both the lower main building and the first building, and a perpendicular load transmission member is interposed between the upper main building and the first building.SELECTED DRAWING: Figure 1
【課題】1つの建物を固有周期の異なる独立した2つの建物により構築し、両者間に制振装置を設置した制振建物において、固有周期の異なる独立した2つの建物各々の変形モードに影響を与えることなく、建物内の全ての空間を無駄なく有効利用可能な、制振建物を提供する。【解決手段】第1の建物、下部主体建物とその上部に構築される上部主体建物を備える第2の建物、および下部主体建物と第1の建物とを接続する制振装置を備え、上部主体建物が、下部主体建物と第1の建物の両者に鉛直荷重を伝達可能な平面視形状に構築され、上部主体建物と第1の建物との間に、鉛直荷重伝達部材が介装される。【選択図】図1
VIBRATION CONTROL BUILDING
PROBLEM TO BE SOLVED: To provide a vibration control building such that one building is constructed with two independent buildings differing in natural period and a vibration control device is installed between both and that can have all spaces in the building effectively utilized without being wasted while neither of deformation modes of the two independent buildings differing in natural period is affected.SOLUTION: A vibration control building comprises: a first building; a second building comprising a lower main building and an upper main building constructed thereupon; and a vibration control device connecting the lower main building to the first building. The upper main building is constructed in a plane shape such that a perpendicular load can be transmitted to both the lower main building and the first building, and a perpendicular load transmission member is interposed between the upper main building and the first building.SELECTED DRAWING: Figure 1
【課題】1つの建物を固有周期の異なる独立した2つの建物により構築し、両者間に制振装置を設置した制振建物において、固有周期の異なる独立した2つの建物各々の変形モードに影響を与えることなく、建物内の全ての空間を無駄なく有効利用可能な、制振建物を提供する。【解決手段】第1の建物、下部主体建物とその上部に構築される上部主体建物を備える第2の建物、および下部主体建物と第1の建物とを接続する制振装置を備え、上部主体建物が、下部主体建物と第1の建物の両者に鉛直荷重を伝達可能な平面視形状に構築され、上部主体建物と第1の建物との間に、鉛直荷重伝達部材が介装される。【選択図】図1
VIBRATION CONTROL BUILDING
制振建物
NISHIMURA KATSUHISA (author) / FUKUMOTO YOSHIYUKI (author) / SASAMOTO KATSUNORI (author) / KATAOKA MASARU (author)
2017-03-02
Patent
Electronic Resource
Japanese
VIBRATION CONTROL BUILDING AND BUILDING VIBRATION CONTROL METHOD
European Patent Office | 2015
|VIBRATION CONTROL BUILDING AND BUILDING VIBRATION CONTROL METHOD
European Patent Office | 2015
|