A platform for research: civil engineering, architecture and urbanism
A PIPING STRUCTURE AND A CONSTRUCTION METHOD OF THE PIPING STRUCTURE
PROBLEM TO BE SOLVED: To provide a piping structure and a construction method of the piping structure that can construct prefabricated piping easily with stable quality.SOLUTION: The piping structure of the prefabricated piping laid in an area to be laid after a pipe material and a joint are connected in advance comprises: a first prefabricated processing pipe 2 having a sleeve penetration pipe material 7 which can penetrate through a sleeve 15 formed in the area to be laid, and disposed on one side in a penetration direction of the sleeve 15; a second prefabricated processing pipe 3 having a connecting pipe material 8 that can be connected to the sleeve penetrating pipe material 7, and disposed on the other side in the penetration direction of the sleeve 15; and a connecting member 4 for connecting the sleeve penetrating pipe material 7 and the connecting pipe material 8.SELECTED DRAWING: Figure 1
【課題】プレハブ加工配管を安定した品質でかつ容易に施工することができる配管構造および配管構造の施工方法を提供する。【解決手段】管材と継手とが予め接続されてから敷設対象領域に敷設されるプレハブ加工配管の配管構造において、敷設対象領域に形成されたスリーブ15を貫通可能なスリーブ貫通管材7を有し、スリーブ15の貫通方向の一方側に配置される第1プレハブ加工配管2と、スリーブ貫通管材7と接続可能な接続管材8を有し、スリーブ15の貫通方向の他方側に配置される第2プレハブ加工配管3と、スリーブ貫通管材7と接続管材8とを接続する接続部材4と、を有する。【選択図】図1
A PIPING STRUCTURE AND A CONSTRUCTION METHOD OF THE PIPING STRUCTURE
PROBLEM TO BE SOLVED: To provide a piping structure and a construction method of the piping structure that can construct prefabricated piping easily with stable quality.SOLUTION: The piping structure of the prefabricated piping laid in an area to be laid after a pipe material and a joint are connected in advance comprises: a first prefabricated processing pipe 2 having a sleeve penetration pipe material 7 which can penetrate through a sleeve 15 formed in the area to be laid, and disposed on one side in a penetration direction of the sleeve 15; a second prefabricated processing pipe 3 having a connecting pipe material 8 that can be connected to the sleeve penetrating pipe material 7, and disposed on the other side in the penetration direction of the sleeve 15; and a connecting member 4 for connecting the sleeve penetrating pipe material 7 and the connecting pipe material 8.SELECTED DRAWING: Figure 1
【課題】プレハブ加工配管を安定した品質でかつ容易に施工することができる配管構造および配管構造の施工方法を提供する。【解決手段】管材と継手とが予め接続されてから敷設対象領域に敷設されるプレハブ加工配管の配管構造において、敷設対象領域に形成されたスリーブ15を貫通可能なスリーブ貫通管材7を有し、スリーブ15の貫通方向の一方側に配置される第1プレハブ加工配管2と、スリーブ貫通管材7と接続可能な接続管材8を有し、スリーブ15の貫通方向の他方側に配置される第2プレハブ加工配管3と、スリーブ貫通管材7と接続管材8とを接続する接続部材4と、を有する。【選択図】図1
A PIPING STRUCTURE AND A CONSTRUCTION METHOD OF THE PIPING STRUCTURE
配管構造および配管構造の施工方法
NAKAMURA TOMOHIRO (author)
2018-05-24
Patent
Electronic Resource
Japanese
PIPING INSTALLATION STRUCTURE AND PIPING PIT CONSTRUCTION METHOD
European Patent Office | 2020
|PIPING STRUCTURE FOR BUILDING, AND PIPING CONSTRUCTION METHOD
European Patent Office | 2018
|DOUBLE PIPING STRUCTURE AND DOUBLE PIPING CONSTRUCTION METHOD
European Patent Office | 2019
|PACKING, PACKING SYSTEM, PIPING STRUCTURE AND CONSTRUCTION METHOD OF PIPING STRUCTURE
European Patent Office | 2021
|