CONSTRUCTION METHOD OF POST-CONSTRUCTION ANCHOR
To provide a construction method of a post-construction anchor capable of filling grout deep into a hole and capable of installing an anchor bar at a predetermined position in a hole.SOLUTION: A holding device 10 attached to a tip portion of a rod-like anchor bar 20 slidably along the anchor bar 20 and holding the anchor bar 20 is pressed into a hole bottom 4 of an anchor hole 3 that is formed in advance on a construction face 2 together with the anchor bar 20 (S2). Grout g is injected between the hole bottom 4 and the holding device 10 from an injection hole 13 provided in the holding device 10 (S3). When, by injecting the grout g, the holding device 10 slides in the anchor hole 3 to reach the construction face 2, injection of the grout g is stopped (S5). After the grout g is hardened, the holding device 10 is removed from the construction face 2 (S6).SELECTED DRAWING: Figure 5
【課題】孔の奥までグラウトを充填でき、かつ、アンカー筋を、孔内の所定位置に設置できるようにするあと施工アンカー施工方法を提供する。【解決手段】棒状のアンカー筋20に沿ってスライド可能にアンカー筋20の先端部に取り付けられた、アンカー筋20を保持する保持装置10を、施工面2に予め形成されたアンカー孔3の孔底4までアンカー筋30と共に押し込み(S2)、保持装置10に設けられた注入孔13から、孔底4と保持装置10との間にグラウトgを注入し(S3)、グラウトgの注入により保持装置10がアンカー孔3をスライドして施工面2まで達したところで、グラウトgの注入を止め(S5)、グラウトgが硬化した後、施工面2から保持装置10を取り外す(S6)。【選択図】図5
CONSTRUCTION METHOD OF POST-CONSTRUCTION ANCHOR
To provide a construction method of a post-construction anchor capable of filling grout deep into a hole and capable of installing an anchor bar at a predetermined position in a hole.SOLUTION: A holding device 10 attached to a tip portion of a rod-like anchor bar 20 slidably along the anchor bar 20 and holding the anchor bar 20 is pressed into a hole bottom 4 of an anchor hole 3 that is formed in advance on a construction face 2 together with the anchor bar 20 (S2). Grout g is injected between the hole bottom 4 and the holding device 10 from an injection hole 13 provided in the holding device 10 (S3). When, by injecting the grout g, the holding device 10 slides in the anchor hole 3 to reach the construction face 2, injection of the grout g is stopped (S5). After the grout g is hardened, the holding device 10 is removed from the construction face 2 (S6).SELECTED DRAWING: Figure 5
【課題】孔の奥までグラウトを充填でき、かつ、アンカー筋を、孔内の所定位置に設置できるようにするあと施工アンカー施工方法を提供する。【解決手段】棒状のアンカー筋20に沿ってスライド可能にアンカー筋20の先端部に取り付けられた、アンカー筋20を保持する保持装置10を、施工面2に予め形成されたアンカー孔3の孔底4までアンカー筋30と共に押し込み(S2)、保持装置10に設けられた注入孔13から、孔底4と保持装置10との間にグラウトgを注入し(S3)、グラウトgの注入により保持装置10がアンカー孔3をスライドして施工面2まで達したところで、グラウトgの注入を止め(S5)、グラウトgが硬化した後、施工面2から保持装置10を取り外す(S6)。【選択図】図5
CONSTRUCTION METHOD OF POST-CONSTRUCTION ANCHOR
あと施工アンカー施工方法
HIRUTA SHUN (author)
2020-08-31
Patent
Electronic Resource
Japanese
European Patent Office | 2016
|POST-CONSTRUCTION ANCHOR AND POST-CONSTRUCTION ANCHOR BUSHING
European Patent Office | 2021
|European Patent Office | 2017
|ANCHOR CONSTRUCTION CONTROL JIG AND POST-INSTALLED ANCHOR CONSTRUCTION METHOD
European Patent Office | 2017
|