HOISTING JIG AND METHOD FOR DISASSEMBLING STEEL TOWER
To provide a hoisting jig capable of surely and safely hoisting a steel tower when the steel tower is laid sideways and disassembled.SOLUTION: A hoisting jig 30 is used to hoist a steel tower 3. The hoisting jig 30 includes: a pair of holding bodies 31 arranged so as to hold a column 10 of the steel tower 3 therebetween; and a bolt 32 and a nut 33 provided to connect the holding bodies 31 to each other. One of the pair of holding bodies 31 is provided with a hoisting piece 34. According to the present invention, the pair of holding bodies 31 are arranged on the column 10 of the steel tower 3, and the holding bodies 31 are connected to each other by the bolt 32 and the nut 33. Next, a wire 22 is connected to the hoisting piece 43, and the wire 22 is hoisted by a hoisting machine L1, whereby the steel tower 3 can be reliably and safely hoisted.SELECTED DRAWING: Figure 7
【課題】鉄塔を横倒しして解体する際、鉄塔を確実かつ安全に吊り上げることができる吊り治具を提供すること。【解決手段】吊り治具30は、鉄塔3を吊り上げるためのものである。この吊り冶具30は、鉄塔3の支柱10を挟んで配置された一対の挟持体31と、この挟持体31同士を連結するボルト32およびナット33と、を備える。一対の挟持体31の一方には、吊りピース34が設けられる。本発明によれば、鉄塔3の支柱10に一対の挟持体31を配置し、ボルト32およびナット33によりこの挟持体31同士を連結する。次に、吊りピース43にワイヤ22を連結して、このワイヤ22を揚重機L1で吊り上げる。これにより、鉄塔3を確実かつ安全に吊り上げることができる。【選択図】図7
HOISTING JIG AND METHOD FOR DISASSEMBLING STEEL TOWER
To provide a hoisting jig capable of surely and safely hoisting a steel tower when the steel tower is laid sideways and disassembled.SOLUTION: A hoisting jig 30 is used to hoist a steel tower 3. The hoisting jig 30 includes: a pair of holding bodies 31 arranged so as to hold a column 10 of the steel tower 3 therebetween; and a bolt 32 and a nut 33 provided to connect the holding bodies 31 to each other. One of the pair of holding bodies 31 is provided with a hoisting piece 34. According to the present invention, the pair of holding bodies 31 are arranged on the column 10 of the steel tower 3, and the holding bodies 31 are connected to each other by the bolt 32 and the nut 33. Next, a wire 22 is connected to the hoisting piece 43, and the wire 22 is hoisted by a hoisting machine L1, whereby the steel tower 3 can be reliably and safely hoisted.SELECTED DRAWING: Figure 7
【課題】鉄塔を横倒しして解体する際、鉄塔を確実かつ安全に吊り上げることができる吊り治具を提供すること。【解決手段】吊り治具30は、鉄塔3を吊り上げるためのものである。この吊り冶具30は、鉄塔3の支柱10を挟んで配置された一対の挟持体31と、この挟持体31同士を連結するボルト32およびナット33と、を備える。一対の挟持体31の一方には、吊りピース34が設けられる。本発明によれば、鉄塔3の支柱10に一対の挟持体31を配置し、ボルト32およびナット33によりこの挟持体31同士を連結する。次に、吊りピース43にワイヤ22を連結して、このワイヤ22を揚重機L1で吊り上げる。これにより、鉄塔3を確実かつ安全に吊り上げることができる。【選択図】図7
HOISTING JIG AND METHOD FOR DISASSEMBLING STEEL TOWER
吊り治具および鉄塔の解体方法
KOBAYASHI HIDEO (author)
2020-12-17
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Tool for disassembling and assembling iron tower main material hoisting and mounting method
European Patent Office | 2021
|Hoisting system and hoisting method for steel tower sections
European Patent Office | 2021
|