METHOD FOR DISMANTLING REINFORCEMENT CONCRETE STRUCTURE PARTLY
To provide a method for restricting a steady noise and dismantling a reinforcement concrete structure partly with a superior work efficiency and a low cost so that an existing reinforcement projects from a fracture surface.SOLUTION: In order to dismantle an end in a bridge width direction of a reinforcement concrete floor slab 2 partly in a state of leaving horizontal main reinforcements 6, a plurality of shot holes 12 are drilled from an upper surface of the reinforcement concrete floor slab 2 downward along a row extending in the bridge width direction. A detonation material 11 is loaded in the shot hole 12. The shot holes 12 are arranged at a substantially equal distance from the horizontal main reinforcements 6 each other on both side of the respective horizontal main reinforcements 6. The detonation material 11 of the same row is detonated at the same time.SELECTED DRAWING: Figure 1
【課題】定常的な騒音を抑制し、良好な作業効率かつ低コストで、既設の鉄筋が破砕面から突出するように、鉄筋コンクリート構造物を部分解体する方法を提供する。【解決手段】鉄筋コンクリート床版2の橋幅方向の端部を横主筋6を残した状態で解体するため、橋軸方向に延在する列に沿って複数の装薬孔12を鉄筋コンクリート床版2の上面から下方に向かって削孔する。装薬孔12には起爆材11が装薬される。装薬孔12は、各々の横主筋6を挟み、該横主筋6から互いに略等しい距離になるように配置される。同じ列の起爆材11は同時に起爆される。【選択図】図1
METHOD FOR DISMANTLING REINFORCEMENT CONCRETE STRUCTURE PARTLY
To provide a method for restricting a steady noise and dismantling a reinforcement concrete structure partly with a superior work efficiency and a low cost so that an existing reinforcement projects from a fracture surface.SOLUTION: In order to dismantle an end in a bridge width direction of a reinforcement concrete floor slab 2 partly in a state of leaving horizontal main reinforcements 6, a plurality of shot holes 12 are drilled from an upper surface of the reinforcement concrete floor slab 2 downward along a row extending in the bridge width direction. A detonation material 11 is loaded in the shot hole 12. The shot holes 12 are arranged at a substantially equal distance from the horizontal main reinforcements 6 each other on both side of the respective horizontal main reinforcements 6. The detonation material 11 of the same row is detonated at the same time.SELECTED DRAWING: Figure 1
【課題】定常的な騒音を抑制し、良好な作業効率かつ低コストで、既設の鉄筋が破砕面から突出するように、鉄筋コンクリート構造物を部分解体する方法を提供する。【解決手段】鉄筋コンクリート床版2の橋幅方向の端部を横主筋6を残した状態で解体するため、橋軸方向に延在する列に沿って複数の装薬孔12を鉄筋コンクリート床版2の上面から下方に向かって削孔する。装薬孔12には起爆材11が装薬される。装薬孔12は、各々の横主筋6を挟み、該横主筋6から互いに略等しい距離になるように配置される。同じ列の起爆材11は同時に起爆される。【選択図】図1
METHOD FOR DISMANTLING REINFORCEMENT CONCRETE STRUCTURE PARTLY
鉄筋コンクリート構造物を部分解体する方法
YAMAJI HIROSHI (author) / NAKAMORI JUNICHIRO (author)
2021-01-14
Patent
Electronic Resource
Japanese
STRUCTURE DISMANTLING SYSTEM AND STRUCTURE DISMANTLING METHOD
European Patent Office | 2021
|Concrete inner support support-free dismantling device and dismantling method
European Patent Office | 2023
|Brick-concrete wall packaging and dismantling mechanism and dismantling method
European Patent Office | 2021
|Static dismantling construction method for reinforced concrete structure
European Patent Office | 2022
|