DUCT CONSTRUCTION METHOD
To provide a duct construction method that can shorten the construction period of a building.SOLUTION: There is provided a method for constructing a vertical duct for building equipment in building construction work, including a step of lifting a duct unit 10 consisting of ducts 12 for at least one floor and having a connecting member 14 provided around the duct 12 and also serving as a flooring material receiving material to the installation floor during the construction of the steel frame of the building, a step of connecting the lifted duct unit 10 to a beam member 1 on the installation floor via the connecting member 14, a step of installing a flooring material 28 around the duct unit 10 via the connecting member 14 after that, and a step of connecting the lower end of the duct unit 10 on the upper floor and the upper end of the duct unit 10 on the lower floor with a connection duct 32.SELECTED DRAWING: Figure 1
【課題】建物の工期を短縮することができるダクト施工方法を提供する。【解決手段】建物の建設工事において、建物設備用の竪型のダクトを施工する方法であって、少なくとも一階分のダクト12からなり、ダクト12の周囲に設けられるとともに床材受け材を兼ねた接続部材14を有するダクトユニット10を、建物の鉄骨建て方中に設置階に揚重するステップと、揚重したダクトユニット10を、接続部材14を介して設置階の梁材1に接続するステップと、その後、接続部材14を介してダクトユニット10の周囲に床材28を設置するステップと、上階のダクトユニット10の下端と、下階のダクトユニット10の上端との間を取合いダクト32で接続するステップとを含むようにする。【選択図】図1
DUCT CONSTRUCTION METHOD
To provide a duct construction method that can shorten the construction period of a building.SOLUTION: There is provided a method for constructing a vertical duct for building equipment in building construction work, including a step of lifting a duct unit 10 consisting of ducts 12 for at least one floor and having a connecting member 14 provided around the duct 12 and also serving as a flooring material receiving material to the installation floor during the construction of the steel frame of the building, a step of connecting the lifted duct unit 10 to a beam member 1 on the installation floor via the connecting member 14, a step of installing a flooring material 28 around the duct unit 10 via the connecting member 14 after that, and a step of connecting the lower end of the duct unit 10 on the upper floor and the upper end of the duct unit 10 on the lower floor with a connection duct 32.SELECTED DRAWING: Figure 1
【課題】建物の工期を短縮することができるダクト施工方法を提供する。【解決手段】建物の建設工事において、建物設備用の竪型のダクトを施工する方法であって、少なくとも一階分のダクト12からなり、ダクト12の周囲に設けられるとともに床材受け材を兼ねた接続部材14を有するダクトユニット10を、建物の鉄骨建て方中に設置階に揚重するステップと、揚重したダクトユニット10を、接続部材14を介して設置階の梁材1に接続するステップと、その後、接続部材14を介してダクトユニット10の周囲に床材28を設置するステップと、上階のダクトユニット10の下端と、下階のダクトユニット10の上端との間を取合いダクト32で接続するステップとを含むようにする。【選択図】図1
DUCT CONSTRUCTION METHOD
ダクト施工方法
NEMOTO JUNKI (author) / KAMATA HAYATO (author) / ABE KATSUNORI (author) / HAMAUTSU TAKEHIKO (author) / MURONO NOBUYUKI (author) / SATO MASAYA (author) / AKADA TAKUTO (author) / ABE HIROTO (author)
2021-08-05
Patent
Electronic Resource
Japanese