A platform for research: civil engineering, architecture and urbanism
EQUIPMENT FIXING MEMBER, EQUIPMENT FIXING PORTION STRUCTURE CONSTRUCTION METHOD
To provide an equipment fixing portion structure and an equipment fixing member, which enable equipment to be space-efficiently installed.SOLUTION: An anchor bolt 7 is disposed on a bottom of a rail member 3 at a predetermined interval in a lengthwise direction of the rail member 3. The anchor bolt 7 and the rail member 3 are connected by, for example, welding and the like. A nut 8 is screwed with the anchor bolt 7. When the anchor bolt 7 of an equipment fixing member 10 is inserted into a hole 19 formed on a fixing portion 16b, the anchor bolt 7 is inserted into the fixing portion 16b to a position of the nut 8. Therefore, an insertion length of the anchor bolt 7 can be changed by changing the position of the nut 8 in the lengthwise direction of the anchor bolt 7. Specifically, the height of the equipment fixing member 10 (rail member 3) can be adjusted with the nut 8.SELECTED DRAWING: Figure 3
【課題】 スペース効率良く機器を設置することが可能な機器固定部構造及び機器固定部材を提供することを目的とする。【解決手段】 レール部材3の底部には、レール部材3の長手方向に対して所定の間隔でアンカーボルト7が配置される。アンカーボルト7とレール部材3は、例えば溶接等で接合される。アンカーボルト7にはナット8が螺合する。固定部16bに形成された孔19に機器固定部材10のアンカーボルト7を挿通させると、アンカーボルト7は、ナット8の位置まで固定部16bに挿通される。したがって、アンカーボルト7の長手方向に対するナット8の位置を変えることで、アンカーボルト7の挿通長さを変えることができる。すなわち、ナット8によって、機器固定部材10(レール部材3)の高さを調整が可能である。【選択図】図3
EQUIPMENT FIXING MEMBER, EQUIPMENT FIXING PORTION STRUCTURE CONSTRUCTION METHOD
To provide an equipment fixing portion structure and an equipment fixing member, which enable equipment to be space-efficiently installed.SOLUTION: An anchor bolt 7 is disposed on a bottom of a rail member 3 at a predetermined interval in a lengthwise direction of the rail member 3. The anchor bolt 7 and the rail member 3 are connected by, for example, welding and the like. A nut 8 is screwed with the anchor bolt 7. When the anchor bolt 7 of an equipment fixing member 10 is inserted into a hole 19 formed on a fixing portion 16b, the anchor bolt 7 is inserted into the fixing portion 16b to a position of the nut 8. Therefore, an insertion length of the anchor bolt 7 can be changed by changing the position of the nut 8 in the lengthwise direction of the anchor bolt 7. Specifically, the height of the equipment fixing member 10 (rail member 3) can be adjusted with the nut 8.SELECTED DRAWING: Figure 3
【課題】 スペース効率良く機器を設置することが可能な機器固定部構造及び機器固定部材を提供することを目的とする。【解決手段】 レール部材3の底部には、レール部材3の長手方向に対して所定の間隔でアンカーボルト7が配置される。アンカーボルト7とレール部材3は、例えば溶接等で接合される。アンカーボルト7にはナット8が螺合する。固定部16bに形成された孔19に機器固定部材10のアンカーボルト7を挿通させると、アンカーボルト7は、ナット8の位置まで固定部16bに挿通される。したがって、アンカーボルト7の長手方向に対するナット8の位置を変えることで、アンカーボルト7の挿通長さを変えることができる。すなわち、ナット8によって、機器固定部材10(レール部材3)の高さを調整が可能である。【選択図】図3
EQUIPMENT FIXING MEMBER, EQUIPMENT FIXING PORTION STRUCTURE CONSTRUCTION METHOD
機器固定部材、機器固定部構造の施工方法
YUGE TAKASHI (author) / KOBAYASHI YUTA (author)
2021-12-13
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
EQUIPMENT FIXING PORTION STRUCTURE AND EQUIPMENT FIXING MEMBER
European Patent Office | 2021
|FIXING BASE MEMBER AND FIXING BASE FOR EQUIPMENT PROVIDED WITH FIXING BASE MEMBER
European Patent Office | 2018
|