FINISHED SHAPE MANAGEMENT METHOD, FINISHED SHAPE MANAGEMENT DEVICE, AND FINISHED SHAPE MANAGEMENT PROGRAM
To provide a finished shape management method for appropriately managing a finished shape for the thickness of a second layer when pavement repair work for laying the second layer over a first layer is performed.SOLUTION: A finished shape management method includes: a first measurement step of measuring current positions of each point on the surface of a first layer with a total station in a state where the surface of the first layer is exposed; a first calculation step of calculating a first elevation difference between a current height and a reference height for each point on the surface of the first layer based on design surface data of the first layer and the current positions of each point on the surface of the first layer; a second measurement step of measuring the current positions of each point on the surface of a second layer with a total station in a state where the second layer is laid above the first layer; and a second calculation step of calculating a second elevation difference between a current height and a reference height for each point on the surface of the second layer based on design surface data of the second layer and the current positions of each point on the surface of the second layer.SELECTED DRAWING: Figure 1
【課題】第1層の上方に第2層を敷設する舗装修繕工事が行われた場合に、第2層の厚さの出来形管理を適正に行う出来形管理方法を提供する。【解決手段】第1層の表面が現れた状態においてトータルステーションにより第1層表面上にある各点の現況位置を計測する第1計測ステップと、第1層の設計面データと第1層表面上にある各点の現況位置とに基づいて、第1層表面上にある各点について現況高さと基準高との第1標高差を算出する第1算出ステップと、第1層の上方に第2層が敷設された状態においてトータルステーションにより第2層表面上にある各点の現況位置を計測する第2計測ステップと、第2層の設計面データと第2層表面上にある各点の現況位置とに基づいて、第2層表面上にある各点について現況高さと基準高との第2標高差を算出する第2算出ステップと、を備える。【選択図】図1
FINISHED SHAPE MANAGEMENT METHOD, FINISHED SHAPE MANAGEMENT DEVICE, AND FINISHED SHAPE MANAGEMENT PROGRAM
To provide a finished shape management method for appropriately managing a finished shape for the thickness of a second layer when pavement repair work for laying the second layer over a first layer is performed.SOLUTION: A finished shape management method includes: a first measurement step of measuring current positions of each point on the surface of a first layer with a total station in a state where the surface of the first layer is exposed; a first calculation step of calculating a first elevation difference between a current height and a reference height for each point on the surface of the first layer based on design surface data of the first layer and the current positions of each point on the surface of the first layer; a second measurement step of measuring the current positions of each point on the surface of a second layer with a total station in a state where the second layer is laid above the first layer; and a second calculation step of calculating a second elevation difference between a current height and a reference height for each point on the surface of the second layer based on design surface data of the second layer and the current positions of each point on the surface of the second layer.SELECTED DRAWING: Figure 1
【課題】第1層の上方に第2層を敷設する舗装修繕工事が行われた場合に、第2層の厚さの出来形管理を適正に行う出来形管理方法を提供する。【解決手段】第1層の表面が現れた状態においてトータルステーションにより第1層表面上にある各点の現況位置を計測する第1計測ステップと、第1層の設計面データと第1層表面上にある各点の現況位置とに基づいて、第1層表面上にある各点について現況高さと基準高との第1標高差を算出する第1算出ステップと、第1層の上方に第2層が敷設された状態においてトータルステーションにより第2層表面上にある各点の現況位置を計測する第2計測ステップと、第2層の設計面データと第2層表面上にある各点の現況位置とに基づいて、第2層表面上にある各点について現況高さと基準高との第2標高差を算出する第2算出ステップと、を備える。【選択図】図1
FINISHED SHAPE MANAGEMENT METHOD, FINISHED SHAPE MANAGEMENT DEVICE, AND FINISHED SHAPE MANAGEMENT PROGRAM
出来形管理方法、出来形管理装置及び出来形管理プログラム
KUSAKI SHIGEO (author) / MORI YOSHIMITSU (author)
2023-03-20
Patent
Electronic Resource
Japanese