FINISHED SHAPE MANAGEMENT DEVICE AND FINISHED SHAPE MANAGEMENT METHOD AND FINISHED SHAPE MANAGEMENT PROGRAM
To measure a precise finished shape and manage the finished shape.SOLUTION: A finished shape management device comprises: a design data acquisition part to acquire design data of an excavation target area; a reflection light data acquisition part to acquire reflection time data of a laser beam irradiated to four reflectors installed so as to surround the excavation target area and reflection direction data; a laser beam coordinate derivation part to derive laser beam coordinates of a first reflector, a second reflector, a third reflector, and a fourth reflector in a laser beam coordinate system from the acquired reflection time data and reflection direction data; an absolute coordinate derivation part to derive a first, second, third and fourth absolute coordinates by converting the first, second, third, and fourth laser beam coordinates to absolute coordinate system representing coordinate system of the design data; and an excavation state determination part to determine an excavation state of the excavation target area by setting at least one of the first, second, third, and fourth absolute coordinates as a reference.SELECTED DRAWING: Figure 2A
【課題】正確な出来形を計測して出来形を管理する。【解決手段】出来形管理装置は掘削対象領域の設計データを取得する設計データ取得部と、掘削対象領域を取り囲むように設置された4つのリフレクタに照射したレーザ光の反射時間データおよび反射方向データを取得する反射光データ取得部と、取得した反射時間データおよび反射方向データから、レーザ光座標系における、第1リフレクタ、第2リフレクタ、第3リフレクタおよび第4リフレクタのレーザ光座標を導出するレーザ光座標導出部と、第1、第2、第3および第4レーザ光座標のそれぞれを、設計データにおける座標系である絶対座標系に変換した、第1、第2、第3および第4絶対座標を導出する絶対座標導出部と、第1、第2、第3および第4絶対座標の少なくともいずれかを基準として、掘削対象領域の掘削状態を判定する掘削状態判定部とを備えた。【選択図】図2A
FINISHED SHAPE MANAGEMENT DEVICE AND FINISHED SHAPE MANAGEMENT METHOD AND FINISHED SHAPE MANAGEMENT PROGRAM
To measure a precise finished shape and manage the finished shape.SOLUTION: A finished shape management device comprises: a design data acquisition part to acquire design data of an excavation target area; a reflection light data acquisition part to acquire reflection time data of a laser beam irradiated to four reflectors installed so as to surround the excavation target area and reflection direction data; a laser beam coordinate derivation part to derive laser beam coordinates of a first reflector, a second reflector, a third reflector, and a fourth reflector in a laser beam coordinate system from the acquired reflection time data and reflection direction data; an absolute coordinate derivation part to derive a first, second, third and fourth absolute coordinates by converting the first, second, third, and fourth laser beam coordinates to absolute coordinate system representing coordinate system of the design data; and an excavation state determination part to determine an excavation state of the excavation target area by setting at least one of the first, second, third, and fourth absolute coordinates as a reference.SELECTED DRAWING: Figure 2A
【課題】正確な出来形を計測して出来形を管理する。【解決手段】出来形管理装置は掘削対象領域の設計データを取得する設計データ取得部と、掘削対象領域を取り囲むように設置された4つのリフレクタに照射したレーザ光の反射時間データおよび反射方向データを取得する反射光データ取得部と、取得した反射時間データおよび反射方向データから、レーザ光座標系における、第1リフレクタ、第2リフレクタ、第3リフレクタおよび第4リフレクタのレーザ光座標を導出するレーザ光座標導出部と、第1、第2、第3および第4レーザ光座標のそれぞれを、設計データにおける座標系である絶対座標系に変換した、第1、第2、第3および第4絶対座標を導出する絶対座標導出部と、第1、第2、第3および第4絶対座標の少なくともいずれかを基準として、掘削対象領域の掘削状態を判定する掘削状態判定部とを備えた。【選択図】図2A
FINISHED SHAPE MANAGEMENT DEVICE AND FINISHED SHAPE MANAGEMENT METHOD AND FINISHED SHAPE MANAGEMENT PROGRAM
出来形管理装置、出来形管理方法および出来形管理プログラム
MATSUDA KENGO (author) / ISHII TOSHIYUKI (author) / KAWASUMI YUMA (author)
2024-10-09
Patent
Electronic Resource
Japanese