A platform for research: civil engineering, architecture and urbanism
INSTALLATION STRUCTURE OF FLOOR SLAB AND INSTALLATION METHOD OF FLOOR SLAB
To improve quality of connection between floor slabs.SOLUTION: In a floor slab installation structure 1 which connects a first floor slab 110 and a second floor slab 120, the first floor slab 110 having a first side surface 113, the second floor slab 120 having a second side surface 123, the side surfaces facing each other with a gap gh, an upper support member 11 which supports the first floor slab 110 and the second floor slab 120 across a top surface 111 of the first floor slab 110 and a top surface 121 of the second floor slab 120 and a lower support member 12 which supports the first floor slab 110 and the second floor slab 120 across a bottom surface 112 of the first floor slab 110 and a bottom surface 122 of the second floor slab 120 are fastened with a fastening member 14, to fix the first floor slab 110 and the second floor slab 120 so as not to be moved, thereby improving quality of connection between the floor slabs.SELECTED DRAWING: Figure 4
【課題】床版間の連結の品質を向上させる。【解決手段】第1床版110の側面113と第2床版120の側面123とを間隙ghを隔てて互いに対向させつつ、第1床版110と第2床版120とを連結する床版の架設構造1において、第1床版110の上面111と第2床版120の上面121とに跨って第1床版110及び第2床版120を支持する上側支持部材11と、第1床版110の下面112と第2床版120の下面122とに跨って第1床版110及び第2床版120を支持する下側支持部材12とが、締結部材14により締結され、第1床版110及び第2床版120が動かないように固定されるため、床版間の連結の品質を向上できる。【選択図】図4
INSTALLATION STRUCTURE OF FLOOR SLAB AND INSTALLATION METHOD OF FLOOR SLAB
To improve quality of connection between floor slabs.SOLUTION: In a floor slab installation structure 1 which connects a first floor slab 110 and a second floor slab 120, the first floor slab 110 having a first side surface 113, the second floor slab 120 having a second side surface 123, the side surfaces facing each other with a gap gh, an upper support member 11 which supports the first floor slab 110 and the second floor slab 120 across a top surface 111 of the first floor slab 110 and a top surface 121 of the second floor slab 120 and a lower support member 12 which supports the first floor slab 110 and the second floor slab 120 across a bottom surface 112 of the first floor slab 110 and a bottom surface 122 of the second floor slab 120 are fastened with a fastening member 14, to fix the first floor slab 110 and the second floor slab 120 so as not to be moved, thereby improving quality of connection between the floor slabs.SELECTED DRAWING: Figure 4
【課題】床版間の連結の品質を向上させる。【解決手段】第1床版110の側面113と第2床版120の側面123とを間隙ghを隔てて互いに対向させつつ、第1床版110と第2床版120とを連結する床版の架設構造1において、第1床版110の上面111と第2床版120の上面121とに跨って第1床版110及び第2床版120を支持する上側支持部材11と、第1床版110の下面112と第2床版120の下面122とに跨って第1床版110及び第2床版120を支持する下側支持部材12とが、締結部材14により締結され、第1床版110及び第2床版120が動かないように固定されるため、床版間の連結の品質を向上できる。【選択図】図4
INSTALLATION STRUCTURE OF FLOOR SLAB AND INSTALLATION METHOD OF FLOOR SLAB
床版の架設構造及び床版の架設方法
YAMANAKA HIROYUKI (author) / ICHINOMIYA TOSHIMICHI (author) / YAMADA YASUSHI (author) / MIMURO KEIJI (author) / NAGAI YUSUKE (author) / MURASE RYOSUKE (author)
2023-06-21
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
FLOOR SLAB INSTALLATION DEVICE AND FLOOR SLAB INSTALLATION METHOD
European Patent Office | 2019
|FLOOR SLAB INSTALLATION DEVICE AND FLOOR SLAB INSTALLATION METHOD
European Patent Office | 2024
|INSTALLATION STRUCTURE OF FLOOR SLAB AND INSTALLATION METHOD OF FLOOR SLAB
European Patent Office | 2023
|PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
European Patent Office | 2018
|