CONSTRUCTION METHOD OF EAVES, AND EAVES UNIT
To provide a construction method of eaves with high workability, and an eaves unit improving workability of eaves.SOLUTION: A main body side temporary fixing portion 26 is provided on a main body steel frame 20 at an indoor side of the main body steel frame 20 relative to a first girder 21. In addition, there is formed a precast eaves unit 41 having an eaves portion 43 in which a first cement composition is hardened and a base steel frame 70 having a base end embedded in the eaves portion 43 and protruding from the eaves portion 43 toward an indoor side of the main body steel frame 20. Then, in a state where a tip of the base steel frame 70 is temporarily fixed to the main body side temporary fixing portion 26 and a middle portion of the base steel frame 70 is supported by the first girder 21, a second cement composition is poured so that the main body side temporary fixing portion 26 and the base steel frame 70 are embedded.SELECTED DRAWING: Figure 5
【課題】施工性が高い庇の施工方法、および、庇の施工性を高める庇ユニットを提供する。【解決手段】本体鉄骨20に対し、第1大梁21よりも本体鉄骨20の屋内側に本体側仮固定部26を設ける。また、第1セメント組成物が硬化した庇部43と庇部43に埋設された基端部を有して庇部43から本体鉄骨20の屋内側に向かって突出する下地鉄骨70とを有するプレキャスト製の庇ユニット41を形成する。そして、下地鉄骨70の先端部を本体側仮固定部26に仮固定するとともに下地鉄骨70の中間部を第1大梁21に支持させた状態で、本体側仮固定部26と下地鉄骨70とが埋設されるように第2セメント組成物を打設する。【選択図】図5
CONSTRUCTION METHOD OF EAVES, AND EAVES UNIT
To provide a construction method of eaves with high workability, and an eaves unit improving workability of eaves.SOLUTION: A main body side temporary fixing portion 26 is provided on a main body steel frame 20 at an indoor side of the main body steel frame 20 relative to a first girder 21. In addition, there is formed a precast eaves unit 41 having an eaves portion 43 in which a first cement composition is hardened and a base steel frame 70 having a base end embedded in the eaves portion 43 and protruding from the eaves portion 43 toward an indoor side of the main body steel frame 20. Then, in a state where a tip of the base steel frame 70 is temporarily fixed to the main body side temporary fixing portion 26 and a middle portion of the base steel frame 70 is supported by the first girder 21, a second cement composition is poured so that the main body side temporary fixing portion 26 and the base steel frame 70 are embedded.SELECTED DRAWING: Figure 5
【課題】施工性が高い庇の施工方法、および、庇の施工性を高める庇ユニットを提供する。【解決手段】本体鉄骨20に対し、第1大梁21よりも本体鉄骨20の屋内側に本体側仮固定部26を設ける。また、第1セメント組成物が硬化した庇部43と庇部43に埋設された基端部を有して庇部43から本体鉄骨20の屋内側に向かって突出する下地鉄骨70とを有するプレキャスト製の庇ユニット41を形成する。そして、下地鉄骨70の先端部を本体側仮固定部26に仮固定するとともに下地鉄骨70の中間部を第1大梁21に支持させた状態で、本体側仮固定部26と下地鉄骨70とが埋設されるように第2セメント組成物を打設する。【選択図】図5
CONSTRUCTION METHOD OF EAVES, AND EAVES UNIT
庇の施工方法および庇ユニット
HAMADA YUKITAKA (author) / FUKAYA TOMOYUKI (author) / MIYATAKA YOSHINOBU (author)
2024-08-07
Patent
Electronic Resource
Japanese
EAVES EDGE STRUCTURE, BUILDING AND EAVES EDGE CONSTRUCTION METHOD
European Patent Office | 2021
|EAVES MEMBER, BUILDING, AND CONSTRUCTION METHOD FOR ROOF EAVES