A platform for research: civil engineering, architecture and urbanism
Preformed joint construction set and joint construction method using the same
The present invention relates to a molding joint construction set and a joint construction method using the same, wherein the molding joint construction set is constructed together when concrete is placed, thereby preventing environmental contamination caused by scattering dust and facilitating work. The joint construction method using the construction set includes the following steps of: preparing a space for placing concrete in a construction position on a road; preparing the construction set by coupling a frame and a molding joint to be installed in the space; arranging the prepared construction set in the space; placing the concrete into the space; curing the placed concrete; and removing the frame by separating the molding joint and the frame when the curing of the concrete is completed. According to the present invention, the molding joint construction set does not need to cut a concrete slab by a cutter so as to construct or repair the joint, thereby reducing the environmental contamination caused by the scattering dust and improving the durability of the joint.
본 발명은 콘크리트 타설시 함께 시공하여 비산먼지에 의한 환경오염을 방지할 수 있고 작업을 용이하게 하는 성형 줄눈재 시공세트 및 이를 이용한 줄눈 시공방법에 관한 것이다. 시공세트를 이용한 줄눈 시공방법은 도로의 시공위치에 콘크리트 타설을 위한 공간을 준비하는 단계와, 상기 공간에 설치할 성형 줄눈재와 프레임을 결합하여 시공세트를 준비하는 단계와, 상기 준비된 시공세트를 공간에 배치하는 단계와, 상기 공간에 콘크리트를 타설하는 단계와, 타설된 콘크리트를 양생시키는 단계와, 콘크리트 양생이 완료되면, 상기 성형 줄눈재와 상기 프레임을 분리하여 프레임을 제거하는 단계를 포함한다. 본 발명에 따르면, 줄눈재의 시공이나 보수를 위해 콘크리트 슬래브를 커팅기로 절단할 필요가 없으므로 비산먼지에 의한 환경오염을 줄일 수 있고, 줄눈의 내구성이 향상되는 효과가 있다.
Preformed joint construction set and joint construction method using the same
The present invention relates to a molding joint construction set and a joint construction method using the same, wherein the molding joint construction set is constructed together when concrete is placed, thereby preventing environmental contamination caused by scattering dust and facilitating work. The joint construction method using the construction set includes the following steps of: preparing a space for placing concrete in a construction position on a road; preparing the construction set by coupling a frame and a molding joint to be installed in the space; arranging the prepared construction set in the space; placing the concrete into the space; curing the placed concrete; and removing the frame by separating the molding joint and the frame when the curing of the concrete is completed. According to the present invention, the molding joint construction set does not need to cut a concrete slab by a cutter so as to construct or repair the joint, thereby reducing the environmental contamination caused by the scattering dust and improving the durability of the joint.
본 발명은 콘크리트 타설시 함께 시공하여 비산먼지에 의한 환경오염을 방지할 수 있고 작업을 용이하게 하는 성형 줄눈재 시공세트 및 이를 이용한 줄눈 시공방법에 관한 것이다. 시공세트를 이용한 줄눈 시공방법은 도로의 시공위치에 콘크리트 타설을 위한 공간을 준비하는 단계와, 상기 공간에 설치할 성형 줄눈재와 프레임을 결합하여 시공세트를 준비하는 단계와, 상기 준비된 시공세트를 공간에 배치하는 단계와, 상기 공간에 콘크리트를 타설하는 단계와, 타설된 콘크리트를 양생시키는 단계와, 콘크리트 양생이 완료되면, 상기 성형 줄눈재와 상기 프레임을 분리하여 프레임을 제거하는 단계를 포함한다. 본 발명에 따르면, 줄눈재의 시공이나 보수를 위해 콘크리트 슬래브를 커팅기로 절단할 필요가 없으므로 비산먼지에 의한 환경오염을 줄일 수 있고, 줄눈의 내구성이 향상되는 효과가 있다.
Preformed joint construction set and joint construction method using the same
성형 줄눈재 시공세트 및 이를 이용한 줄눈 시공방법
LEE DONG KYU (author)
2020-11-23
Patent
Electronic Resource
Korean
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Centerline Joint Repair Using Preformed Joint Inserts
NTIS | 1988
|Preformed elastomeric bridge joint sealers
Engineering Index Backfile | 1967
|