A platform for research: civil engineering, architecture and urbanism
Sleeper replacement method and linked sleeper holder and linked sleeper reinforcement mechanism for the method
The present disclosure relates to a sleeper replacement method for quickly replacing sleepers on a track, especially sleepers installed on a track in a ballastless bridge section by enabling linked sleepers to be used, which are sleepers connected by a connector in advance. The sleeper replacement method includes: a linked sleeper preparation process of preparing linked sleepers by connecting multiple sleepers at intervals using connectors; an existing sleeper removal process of sequentially removing existing sleepers installed on a roadbed or a sleeper support structure from a track on the back and putting the removed sleepers on a first trolley as moving sleeper removal equipment to the front on the track by a predetermined interval; and a linked sleeper installation process of sequentially installing the linked sleepers on the roadbed or the sleeper support structure from which the existing sleepers have been removed as carrying the linked sleepers loaded on sleeper installation equipment along the track behind the sleeper removal equipment.
개시된 것은 연결구를 통해 침목들이 미리 연결된 연동침목을 이용할 수 있도록 함으로써 선로 상의 침목들, 특히 무도상 교량구간의 선로에 설치된 침목들을 신속하게 교체할 수 있는 침목 교체방법에 대한 것이다. 상기 침목 교체방법은 복수의 침목이 연결구들을 통해 간격을 두고 연결되어 이루어진 연동침목들을 준비하는 연동침목 준비과정, 침목철거장비를 선로 상에서 소정 구간씩 전방으로 이동시키면서 후방 쪽의 선로의 노반 또는 침목지지 구조물에 설치되어 있는 기존 침목들을 순차로 제거하여 제1트롤리에 싣는 기존 침목 철거과정 및 침목설치장비에 연동침목들을 싣고 침목철거장비 뒤쪽의 선로를 따라 가면서 기존 침목들이 제거된 노반 또는 상기 침목지지 구조물에 연동침목들을 순차로 설치하는 연동침목 설치과정을 포함하는 구성을 한다.
Sleeper replacement method and linked sleeper holder and linked sleeper reinforcement mechanism for the method
The present disclosure relates to a sleeper replacement method for quickly replacing sleepers on a track, especially sleepers installed on a track in a ballastless bridge section by enabling linked sleepers to be used, which are sleepers connected by a connector in advance. The sleeper replacement method includes: a linked sleeper preparation process of preparing linked sleepers by connecting multiple sleepers at intervals using connectors; an existing sleeper removal process of sequentially removing existing sleepers installed on a roadbed or a sleeper support structure from a track on the back and putting the removed sleepers on a first trolley as moving sleeper removal equipment to the front on the track by a predetermined interval; and a linked sleeper installation process of sequentially installing the linked sleepers on the roadbed or the sleeper support structure from which the existing sleepers have been removed as carrying the linked sleepers loaded on sleeper installation equipment along the track behind the sleeper removal equipment.
개시된 것은 연결구를 통해 침목들이 미리 연결된 연동침목을 이용할 수 있도록 함으로써 선로 상의 침목들, 특히 무도상 교량구간의 선로에 설치된 침목들을 신속하게 교체할 수 있는 침목 교체방법에 대한 것이다. 상기 침목 교체방법은 복수의 침목이 연결구들을 통해 간격을 두고 연결되어 이루어진 연동침목들을 준비하는 연동침목 준비과정, 침목철거장비를 선로 상에서 소정 구간씩 전방으로 이동시키면서 후방 쪽의 선로의 노반 또는 침목지지 구조물에 설치되어 있는 기존 침목들을 순차로 제거하여 제1트롤리에 싣는 기존 침목 철거과정 및 침목설치장비에 연동침목들을 싣고 침목철거장비 뒤쪽의 선로를 따라 가면서 기존 침목들이 제거된 노반 또는 상기 침목지지 구조물에 연동침목들을 순차로 설치하는 연동침목 설치과정을 포함하는 구성을 한다.
Sleeper replacement method and linked sleeper holder and linked sleeper reinforcement mechanism for the method
침목 교체방법 및 이를 위한 연동침목 홀딩기구와 연동침목 보강기구
CHO YEOUNG CHEOL (author) / BANG IN SEOK (author) / LEE CHAN YOUNG (author) / BACK IN CHUL (author) / KWON SE GON (author) / LEE HO DAM (author) / CHOI SANG HYUN (author) / MOON JI HO (author) / LEE CHANG HO (author) / PARK SANG JUN (author)
2023-01-20
Patent
Electronic Resource
Korean
SLEEPER, SLEEPER LAYING METHOD, AND SLEEPER MANUFACTURING METHOD
European Patent Office | 2017
|SLEEPER REPAIR METHOD, SLEEPER REPAIR STRUCTURE AND SLEEPER
European Patent Office | 2021
|