Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
According to the present invention, a construction method of top-down construction method of being alternatively connected includes: a first step of constructing first basement level excavation and a first level floor after installing a retaining wall and constructing an underground pillar post; a second step of firstly constructing a core part of one underground layer for supporting a core part on the ground constructed upwards while constructing a slab in the basement downstairs; a third step of alternatively installing underground vertical members downwards; and a step of constructing the underground vertical member of remaining layers at the same time after constructing a mat of the lowest layer or a foundation, thereby being possible to early start a ground framework and finishing construction to shorten the whole construction period by shortening the construction period of the underground vertical member.
본 발명에 따른 하나 걸러 번갈아 이어지는 역타공법의 공사방법은 흙막이를 설치하고 지하 기둥말뚝을 시공한 후, 지하 1층 터파기 및 지상 1층 바닥을 시공하는 제1단계 ; 지하층 슬라브를 아래층으로 시공하면서 상향 시공되는 지상층 코어부를 지지하기 위하여 지하 1개층 코어부를 먼저 시공하는 제2단계 ; 지하 수직부재를 하나 걸러 번갈아 가며 하향으로 시공하는 제3단계 ; 최하층 매트 또는 기초를 시공한 후, 남은 잔여층 지하 수직부재를 동시에 시공하는 단계 ; 로 이루어져 지하 수직부재 공사기간을 단축함으로써 이후의 지상 골조 및 마감공사를 조기에 착수할 수 있게 되어 전체 공사기간을 단축하는 것을 특징으로 한다.
Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
According to the present invention, a construction method of top-down construction method of being alternatively connected includes: a first step of constructing first basement level excavation and a first level floor after installing a retaining wall and constructing an underground pillar post; a second step of firstly constructing a core part of one underground layer for supporting a core part on the ground constructed upwards while constructing a slab in the basement downstairs; a third step of alternatively installing underground vertical members downwards; and a step of constructing the underground vertical member of remaining layers at the same time after constructing a mat of the lowest layer or a foundation, thereby being possible to early start a ground framework and finishing construction to shorten the whole construction period by shortening the construction period of the underground vertical member.
본 발명에 따른 하나 걸러 번갈아 이어지는 역타공법의 공사방법은 흙막이를 설치하고 지하 기둥말뚝을 시공한 후, 지하 1층 터파기 및 지상 1층 바닥을 시공하는 제1단계 ; 지하층 슬라브를 아래층으로 시공하면서 상향 시공되는 지상층 코어부를 지지하기 위하여 지하 1개층 코어부를 먼저 시공하는 제2단계 ; 지하 수직부재를 하나 걸러 번갈아 가며 하향으로 시공하는 제3단계 ; 최하층 매트 또는 기초를 시공한 후, 남은 잔여층 지하 수직부재를 동시에 시공하는 단계 ; 로 이루어져 지하 수직부재 공사기간을 단축함으로써 이후의 지상 골조 및 마감공사를 조기에 착수할 수 있게 되어 전체 공사기간을 단축하는 것을 특징으로 한다.
Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
하나 걸러 번갈아 시공되는 역타공법의 지하 수직부재 공사방법
YANG KYUNG OK (author)
2019-06-28
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
European Patent Office | 2021
|Special construction method for basement foundation through steel structure alternate construction
European Patent Office | 2020
|Basement structure spring layer top-down construction method
European Patent Office | 2023
|