Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
According to the present invention, in order to shorten a period for basement framework construction in a basement top-down method for construction, provided is a construction method wherein basement vertical members (core parts, pillars) are alternately constructed to a lower floor and then remaining vertical members are constructed at the same, thereby shortening a construction period. According to the present invention, the top-down construction method performing alternate connection includes: a first step of installing a retaining wall and constructing a basement pillar post, and then, excavating a bed for a first basement floor and constructing a first ground floor; a second step of first constructing a core part of the first basement floor to support a core part of the ground floor constructed upward while constructing a basement floor slab to a lower floor; a third step of constructing basement vertical members downward on an alternate basis floor by floor by using a bottom-up method; and a step of constructing the lowermost mat or foundation, and then, constructing basement vertical members for remaining floors at the same time or step by step by using the bottom-up method. Therefore, since a period for the construction of basement vertical members is shortened, subsequent ground framework and finishing construction can be started at an early stage, which can lead to a reduction in the entire construction period.
본 발명은 건설공사 지하층 역타공법 탑다운에서의 지하 골조공사 기간을 단축하기 위한 것으로, 지하 수직부재(코어부, 기둥)를 하나 걸러 번갈아 가면서 아래층으로 시공하며 이후에는 남은 수직부재를 동시에 시공하는 공사방법을 제공하여 공사기간을 단축할 수 있도록 한다. 본 발명에 따른 하나 걸러 번갈아 이어지는 역타공법의 공사방법은 흙막이를 설치하고 지하 기둥말뚝을 시공한 후, 지하 1층 터파기 및 지상 1층 바닥을 시공하는 제1단계 ; 지하층 슬라브를 아래층으로 시공하면서 상향 시공되는 지상층 코어부를 지지하기 위하여 지하 1개층 코어부를 먼저 시공하는 제2단계 ; 지하 수직부재를 하나 걸러 번갈아 가며 하향으로 순타로 1개층씩 시공하는 제3단계 ; 최하층 매트 또는 기초를 시공한 후, 하나걸러 남은 잔여층 지하 부직부재를 동시에 또는 단계별로 순타로 시공하는 단계 ; 로 이루어져 지하 수직부재 공사기간을 단축함으로써 이후의 지상 골조 및 마감공사를 조기에 착수할 수 있게 되어 전체 공사기간을 단축하는 것을 특징으로 한다.
Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
According to the present invention, in order to shorten a period for basement framework construction in a basement top-down method for construction, provided is a construction method wherein basement vertical members (core parts, pillars) are alternately constructed to a lower floor and then remaining vertical members are constructed at the same, thereby shortening a construction period. According to the present invention, the top-down construction method performing alternate connection includes: a first step of installing a retaining wall and constructing a basement pillar post, and then, excavating a bed for a first basement floor and constructing a first ground floor; a second step of first constructing a core part of the first basement floor to support a core part of the ground floor constructed upward while constructing a basement floor slab to a lower floor; a third step of constructing basement vertical members downward on an alternate basis floor by floor by using a bottom-up method; and a step of constructing the lowermost mat or foundation, and then, constructing basement vertical members for remaining floors at the same time or step by step by using the bottom-up method. Therefore, since a period for the construction of basement vertical members is shortened, subsequent ground framework and finishing construction can be started at an early stage, which can lead to a reduction in the entire construction period.
본 발명은 건설공사 지하층 역타공법 탑다운에서의 지하 골조공사 기간을 단축하기 위한 것으로, 지하 수직부재(코어부, 기둥)를 하나 걸러 번갈아 가면서 아래층으로 시공하며 이후에는 남은 수직부재를 동시에 시공하는 공사방법을 제공하여 공사기간을 단축할 수 있도록 한다. 본 발명에 따른 하나 걸러 번갈아 이어지는 역타공법의 공사방법은 흙막이를 설치하고 지하 기둥말뚝을 시공한 후, 지하 1층 터파기 및 지상 1층 바닥을 시공하는 제1단계 ; 지하층 슬라브를 아래층으로 시공하면서 상향 시공되는 지상층 코어부를 지지하기 위하여 지하 1개층 코어부를 먼저 시공하는 제2단계 ; 지하 수직부재를 하나 걸러 번갈아 가며 하향으로 순타로 1개층씩 시공하는 제3단계 ; 최하층 매트 또는 기초를 시공한 후, 하나걸러 남은 잔여층 지하 부직부재를 동시에 또는 단계별로 순타로 시공하는 단계 ; 로 이루어져 지하 수직부재 공사기간을 단축함으로써 이후의 지상 골조 및 마감공사를 조기에 착수할 수 있게 되어 전체 공사기간을 단축하는 것을 특징으로 한다.
Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
하나 걸러 번갈아 시공되는 역타공법의 지하 수직부재 공사방법
YANG KYUNG OK (author)
2021-01-04
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
European Patent Office | 2019
|Special construction method for basement foundation through steel structure alternate construction
European Patent Office | 2020
|Basement structure spring layer top-down construction method
European Patent Office | 2023
|