A platform for research: civil engineering, architecture and urbanism
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Method to prevent the flooding consequences is in that the shore dam is performed with the possibility of the main river bed overlapping, consisting of three parts: two identical parts are located on the river banks along its main bed, and the third main part is rigidly connected to these two parts perpendicular to the main river bed. Making up the coastal dam main part of two oppositely located permanent shields, made of rectangular shape and rigidly connected to the dam parts located along the river banks, and in the opening formed by permanent shields, arranging a central rectangular quick-erect shield, movably connected by means of guides, for example, of the "tongue-groove" type with permanent shields and fixed onto them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, which body is fixed onto permanent shields, and making on the quick-erect shield holes to fix the movable pins. Quick-erect shield fixing mechanism is made with an automatic drive, control over which is performed from the control unit located in the control cabin located in the coastal dam. On permanent shields video cameras are fixed to control over the quick-erect shield installation. Quick-erect shield is installed before the beginning of the flood in the river using the lifting devices or a helicopter in such a way that an opening of height H was kept for the passage of low-tonnage vessels before the flood begins. Control over the quick-erect shield installation is carried out from the command post located in the control cabin, while installing a video terminal on the helicopter, connected to the control cabin by mobile communication and duplicating signals from video cameras, for the central shield installation adjustment. On the quick-erect shield, in its middle part, fixing the water pressure load cell, which output is connected to the strain gage located in the control unit located in the control cabin by the communication lines. On permanent shields, throttle valves are installed with mechanisms for regulating their passage sections, control over which is carried out from the flood control unit. Permanent shields in which throttling valves are installed with mechanisms for regulating their cross-section, are made of a vibration damping material, excluding the cavitation modes formation in cases, when water enters the bypass channels.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Способ предотвращения последствий наводнения заключается в том, что выполняют береговую дамбу с возможностью перекрытия основного русла реки, состоящую из трех частей: две идентичные части располагают по берегам реки, вдоль ее основного русла, а третью основную часть жестко соединяют с этими двумя частями перпендикулярно основному руслу реки. Основную часть береговой дамбы выполняют состоящей из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, располагают центральный прямоугольный быстровозводимый щит, подвижно соединенный посредством направляющих, например, типа «паз-шип» с постоянными щитами и фиксируемый на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закрепляют на постоянных щитах, а на быстровозводимом щите выполняют отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполняют с автоматическим приводом, управление которым осуществляют с блока управления, находящегося в кабине управления, размещенной в береговой дамбе. На постоянных щитах для управления установкой быстровозводимого щита закрепляют видеокамеры. Быстровозводимый щит устанавливают перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой Н для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляют с командного пункта, размещенного в кабине управления, при этом на вертолете устанавливают видеотерминал, связанный мобильной связью с кабиной управления и дублирующий сигналы с видеокамер, для корректировки установкой центрального щита. На быстровозводимом щите, в его средней части, закрепляют тензодатчик давления воды, выход с которого связывают по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления. На постоянных щитах устанавливают дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляют с блока управления наводнением. Постоянные щиты, в которых установлены дроссельные заслонки с механизмами регулирования их проходным сечением, выполняют из вибродемпфирующего материала, исключающего образование кавитационных режимов в случаях, когда вода поступает в обводные русла. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Method to prevent the flooding consequences is in that the shore dam is performed with the possibility of the main river bed overlapping, consisting of three parts: two identical parts are located on the river banks along its main bed, and the third main part is rigidly connected to these two parts perpendicular to the main river bed. Making up the coastal dam main part of two oppositely located permanent shields, made of rectangular shape and rigidly connected to the dam parts located along the river banks, and in the opening formed by permanent shields, arranging a central rectangular quick-erect shield, movably connected by means of guides, for example, of the "tongue-groove" type with permanent shields and fixed onto them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, which body is fixed onto permanent shields, and making on the quick-erect shield holes to fix the movable pins. Quick-erect shield fixing mechanism is made with an automatic drive, control over which is performed from the control unit located in the control cabin located in the coastal dam. On permanent shields video cameras are fixed to control over the quick-erect shield installation. Quick-erect shield is installed before the beginning of the flood in the river using the lifting devices or a helicopter in such a way that an opening of height H was kept for the passage of low-tonnage vessels before the flood begins. Control over the quick-erect shield installation is carried out from the command post located in the control cabin, while installing a video terminal on the helicopter, connected to the control cabin by mobile communication and duplicating signals from video cameras, for the central shield installation adjustment. On the quick-erect shield, in its middle part, fixing the water pressure load cell, which output is connected to the strain gage located in the control unit located in the control cabin by the communication lines. On permanent shields, throttle valves are installed with mechanisms for regulating their passage sections, control over which is carried out from the flood control unit. Permanent shields in which throttling valves are installed with mechanisms for regulating their cross-section, are made of a vibration damping material, excluding the cavitation modes formation in cases, when water enters the bypass channels.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Способ предотвращения последствий наводнения заключается в том, что выполняют береговую дамбу с возможностью перекрытия основного русла реки, состоящую из трех частей: две идентичные части располагают по берегам реки, вдоль ее основного русла, а третью основную часть жестко соединяют с этими двумя частями перпендикулярно основному руслу реки. Основную часть береговой дамбы выполняют состоящей из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, располагают центральный прямоугольный быстровозводимый щит, подвижно соединенный посредством направляющих, например, типа «паз-шип» с постоянными щитами и фиксируемый на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закрепляют на постоянных щитах, а на быстровозводимом щите выполняют отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполняют с автоматическим приводом, управление которым осуществляют с блока управления, находящегося в кабине управления, размещенной в береговой дамбе. На постоянных щитах для управления установкой быстровозводимого щита закрепляют видеокамеры. Быстровозводимый щит устанавливают перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой Н для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляют с командного пункта, размещенного в кабине управления, при этом на вертолете устанавливают видеотерминал, связанный мобильной связью с кабиной управления и дублирующий сигналы с видеокамер, для корректировки установкой центрального щита. На быстровозводимом щите, в его средней части, закрепляют тензодатчик давления воды, выход с которого связывают по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления. На постоянных щитах устанавливают дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляют с блока управления наводнением. Постоянные щиты, в которых установлены дроссельные заслонки с механизмами регулирования их проходным сечением, выполняют из вибродемпфирующего материала, исключающего образование кавитационных режимов в случаях, когда вода поступает в обводные русла. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
СПОСОБ ПРЕДОТВРАЩЕНИЯ ПОСЛЕДСТВИЙ НАВОДНЕНИЯ
KOCHETOV OLEG SAVELEVICH (author)
2018-03-28
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
FLOODING PREVENTION SYSTEM AND FLOODING PREVENTION METHOD
European Patent Office | 2024
|FLOODING PREVENTION DEVICE AND FLOODING PREVENTION METHOD
European Patent Office | 2024
|