A platform for research: civil engineering, architecture and urbanism
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Flooding consequences prevention method consists in the coastal dam erection with possibility of the main river bed overlapping. Coastal dam consists of two parts, the main one and the prefabricated one. Main part consists of two identical parts and it is preliminary built along the river banks, along its main bed. Prefabricated part is constructed before the high water beginning and rigidly connecting by means of it the coastal dam main part two identical parts perpendicular to the main river bed. Making the coastal dam main part of two oppositely located permanent shields, made of rectangular shape and rigidly connected to the dam parts located along the river banks, and in the opening formed by permanent shields, arranging a central rectangular quick-erect shield, movably connecting it by means of guides, for example, of the “groove-tongue” type to the main part permanent shields and fixing on them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, which body is fixed onto the permanent shields, and on the quick-erect shield making holes to fix the movable pins. Quick-erect shield fixing mechanism is made with the automatic drive, control over which is performed from the control unit located in the control cabin, which is located in the coastal dam. On permanent shields video cameras are fixed to control over the quick-erect shield installation. Quick-erect shield is installed before the beginning of the flood in the river using the lifting devices or a helicopter in such a way that an opening of height “H” was kept for the passage of low-tonnage vessels before the flood begins. Control over the quick-erect shield installation is carried out from the command post located in the control cabin. Installing the video terminal on the helicopter, connected to the control cabin by mobile communication and duplicating signals from video cameras, for the central quick-erect shield installation adjustment. On the quick-erect shield, in its middle part, fixing the water pressure load cell, which output is connected to the strain gage located in the control unit located in the control cabin by the communication lines, and on the permanent shields, throttle valves are installed with mechanisms for regulating their passage sections, control over which is carried out from the located in the control cabin flood control unit. In the event of the water level rise in the main bed, on the coastal dams performing the water flow deflection directed along the main bed from the quick-erect shield towards the coastal dams, by its partial covering with the auxiliary shields fixed on the coastal dams by means of hinged mechanisms and moving from the drive connected to the auxiliary shields by the hinge mechanism.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Способ предотвращения последствий наводнения заключается в том, что воздвигают береговую дамбу с возможностью перекрытия основного русла реки. Береговая дамба состоит из двух частей, основной и быстровозводимой. Основная часть состоит из двух идентичных частей и сооружают ее предварительно по берегам реки, вдоль ее основного русла. Быстровозводимую часть сооружают перед началом паводка и жестко соединяют посредством нее две идентичные части основной части береговой дамбы перпендикулярно основному руслу реки. Основную часть береговой дамбы выполняют из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, располагают центральный прямоугольный быстровозводимый щит, подвижно соединяют его посредством направляющих, например, типа «паз-шип» с постоянными щитами основной части и фиксируют на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закреплен на постоянных щитах, а на быстровозводимом щите выполняют отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполняют с автоматическим приводом, управление которым осуществляют с блока управления, находящегося в кабине управления, которую размещают в береговой дамбе. На постоянных щитах, для управления установкой быстровозводимого щита, закрепляют видеокамеры. Быстровозводимый щит устанавливают перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой «Н» для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляют с командного пункта, размещенного в кабине управления. На вертолете устанавливают видеотерминал, связанный мобильной связью с кабиной управления, и дублируют сигналы с видеокамер для корректировки установки центрального быстровозводимого щита. На быстровозводимом щите, в его средней части, закрепляют тензодатчик давления воды, выход с которого связывают по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления, а на постоянных щитах устанавливают дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляют с блока управления наводнением, размещенного в кабине управления. В случае повышения уровня воды в основном русле на береговых дамбах осуществляют отвод потока воды, направляемого по основному руслу от быстровозводимого щита в стороны береговых дамб, путем частичного его перекрытия вспомогательными щитами, закрепленными посредством шарнирных механизмов на береговых дамбах и перемещающимися от привода, соединенного шарнирным механизмом с вспомогательными щитами. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Flooding consequences prevention method consists in the coastal dam erection with possibility of the main river bed overlapping. Coastal dam consists of two parts, the main one and the prefabricated one. Main part consists of two identical parts and it is preliminary built along the river banks, along its main bed. Prefabricated part is constructed before the high water beginning and rigidly connecting by means of it the coastal dam main part two identical parts perpendicular to the main river bed. Making the coastal dam main part of two oppositely located permanent shields, made of rectangular shape and rigidly connected to the dam parts located along the river banks, and in the opening formed by permanent shields, arranging a central rectangular quick-erect shield, movably connecting it by means of guides, for example, of the “groove-tongue” type to the main part permanent shields and fixing on them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, which body is fixed onto the permanent shields, and on the quick-erect shield making holes to fix the movable pins. Quick-erect shield fixing mechanism is made with the automatic drive, control over which is performed from the control unit located in the control cabin, which is located in the coastal dam. On permanent shields video cameras are fixed to control over the quick-erect shield installation. Quick-erect shield is installed before the beginning of the flood in the river using the lifting devices or a helicopter in such a way that an opening of height “H” was kept for the passage of low-tonnage vessels before the flood begins. Control over the quick-erect shield installation is carried out from the command post located in the control cabin. Installing the video terminal on the helicopter, connected to the control cabin by mobile communication and duplicating signals from video cameras, for the central quick-erect shield installation adjustment. On the quick-erect shield, in its middle part, fixing the water pressure load cell, which output is connected to the strain gage located in the control unit located in the control cabin by the communication lines, and on the permanent shields, throttle valves are installed with mechanisms for regulating their passage sections, control over which is carried out from the located in the control cabin flood control unit. In the event of the water level rise in the main bed, on the coastal dams performing the water flow deflection directed along the main bed from the quick-erect shield towards the coastal dams, by its partial covering with the auxiliary shields fixed on the coastal dams by means of hinged mechanisms and moving from the drive connected to the auxiliary shields by the hinge mechanism.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Способ предотвращения последствий наводнения заключается в том, что воздвигают береговую дамбу с возможностью перекрытия основного русла реки. Береговая дамба состоит из двух частей, основной и быстровозводимой. Основная часть состоит из двух идентичных частей и сооружают ее предварительно по берегам реки, вдоль ее основного русла. Быстровозводимую часть сооружают перед началом паводка и жестко соединяют посредством нее две идентичные части основной части береговой дамбы перпендикулярно основному руслу реки. Основную часть береговой дамбы выполняют из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, располагают центральный прямоугольный быстровозводимый щит, подвижно соединяют его посредством направляющих, например, типа «паз-шип» с постоянными щитами основной части и фиксируют на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закреплен на постоянных щитах, а на быстровозводимом щите выполняют отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполняют с автоматическим приводом, управление которым осуществляют с блока управления, находящегося в кабине управления, которую размещают в береговой дамбе. На постоянных щитах, для управления установкой быстровозводимого щита, закрепляют видеокамеры. Быстровозводимый щит устанавливают перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой «Н» для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляют с командного пункта, размещенного в кабине управления. На вертолете устанавливают видеотерминал, связанный мобильной связью с кабиной управления, и дублируют сигналы с видеокамер для корректировки установки центрального быстровозводимого щита. На быстровозводимом щите, в его средней части, закрепляют тензодатчик давления воды, выход с которого связывают по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления, а на постоянных щитах устанавливают дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляют с блока управления наводнением, размещенного в кабине управления. В случае повышения уровня воды в основном русле на береговых дамбах осуществляют отвод потока воды, направляемого по основному руслу от быстровозводимого щита в стороны береговых дамб, путем частичного его перекрытия вспомогательными щитами, закрепленными посредством шарнирных механизмов на береговых дамбах и перемещающимися от привода, соединенного шарнирным механизмом с вспомогательными щитами. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
METHOD OF THE FLOODING CONSEQUENCES PREVENTION
СПОСОБ ПРЕДОТВРАЩЕНИЯ ПОСЛЕДСТВИЙ НАВОДНЕНИЯ
KOCHETOV OLEG SAVELEVICH (author)
2018-05-29
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
FLOODING PREVENTION SYSTEM AND FLOODING PREVENTION METHOD
European Patent Office | 2024
|FLOODING PREVENTION DEVICE AND FLOODING PREVENTION METHOD
European Patent Office | 2024
|