GROUND IMPROVEMENT METHOD FOR ORGANIC SOIL STRATUM
The present invention relates to a ground improvement method for an organic soil stratum, in which organic soil inside a first drilled hole formed in an organic soil stratum located at the upper portion of the ground is removed, and then a point foundation, which includes a tail section formed in a lower silt stratum and a head section having an expanded diameter in an upper portion of the organic soil stratum, is constructed, thus making it possible to achieve sufficient consolidation strength in the point foundation and sufficient bearing capacity in the head section, and allowing the amount of settlement to be controlled by the tail section. The ground improvement method for an organic soil stratum of the present invention is for improving poor ground in which the organic soil stratum is formed above a lower silt stratum, the method being characterized by comprising: (a) a step for drilling the organic soil stratum to form a first drilled hole, and discharging to the outside and removing a portion of the organic soil stratum inside the first drilled hole; and (b) a step for injecting a solidification agent into a second drilled hole, which is formed by drilling a portion below the first drilled hole, and mixing the solidification agent with silt to form a tail section, and injecting a solidification agent into a third drilled hole, which is formed by drilling and enlarging part of an upper portion of the first drilled hole and has a larger diameter than the second drilled hole, and mixing the solidification agent with silt to form a head section.
La présente invention concerne un procédé d'amélioration de terrain pour une strate de sol organique, dans lequel un sol organique à l'intérieur d'un premier trou foré formé dans une strate de sol organique située au niveau de la partie supérieure du sol est retiré, puis une fondation ponctuelle, qui comprend une section arrière formée dans une strate de limon inférieure et une section de tête ayant un diamètre étendu dans une partie supérieure de la strate de sol organique, est construite, ce qui permet d'obtenir une force de consolidation suffisante dans la fondation ponctuelle et une capacité de support suffisante dans la section de tête, et de permettre à la quantité de règlement d'être contrôlée par la section arrière. Le procédé d'amélioration de terrain pour une strate de sol organique de la présente invention est destiné à améliorer un terrain pauvre dans lequel la strate de sol organique est formée au-dessus d'une strate de limon inférieure. Le procédé est caractérisé en ce qu'il comprend : (a) une étape de forage de la strate de sol organique pour former un premier trou foré, et le vidage vers l'extérieur et l'élimination d'une partie de la strate de sol organique à l'intérieur du premier trou foré; et (b) une étape d'injection d'un agent de solidification dans un second trou foré, qui est formé par forage d'une partie au-dessous du premier trou foré, et le mélange de l'agent de solidification avec du limon pour former une section arrière, et l'injection d'un agent de solidification dans un troisième trou foré, qui est formé par forage et agrandissement d'une partie d'une partie supérieure du premier trou foré et qui a un diamètre plus grand que le second trou foré, et le mélange de l'agent de solidification avec du limon pour former une section de tête.
본 발명은 지반의 상부 부분에 위치하는 유기질토층에 형성된 제1천공홀 내 유기질토를 제거한 후 하부 토사층에 형성되는 테일부와 상부 유기질토층에 지름이 확대된 헤드부로 구성되는 포인트 기초를 시공함으로써, 포인트 기초의 고결 강도 및 헤드부의 지내력 확보가 가능하고, 테일부에 의해 침하량을 제어할 수 있는 유기질토층 지반 개량 방법에 대한 것이다. 본 발명 유기질토층 지반 개량 방법은 하부 토사층의 상부에 유기질토층이 형성된 연약지반을 개량하기 위한 것으로, (a) 유기질토층을 천공하여 제1천공홀을 형성하면서 제1천공홀 내 유기질토의 일부를 외부로 배토하여 제거하는 단계; 및 (b) 상기 제1천공홀의 하부를 천공하여 형성된 제2천공홀에 고화재를 주입하여 토사와 혼합함으로써 테일부를 형성하는 한편, 제1천공홀의 상부 일부를 확장 천공하여 제2천공홀보다 지름이 크게 형성된 제3천공홀에 고화재를 주입하여 토사와 혼합함으로써 헤드부를 형성하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
GROUND IMPROVEMENT METHOD FOR ORGANIC SOIL STRATUM
The present invention relates to a ground improvement method for an organic soil stratum, in which organic soil inside a first drilled hole formed in an organic soil stratum located at the upper portion of the ground is removed, and then a point foundation, which includes a tail section formed in a lower silt stratum and a head section having an expanded diameter in an upper portion of the organic soil stratum, is constructed, thus making it possible to achieve sufficient consolidation strength in the point foundation and sufficient bearing capacity in the head section, and allowing the amount of settlement to be controlled by the tail section. The ground improvement method for an organic soil stratum of the present invention is for improving poor ground in which the organic soil stratum is formed above a lower silt stratum, the method being characterized by comprising: (a) a step for drilling the organic soil stratum to form a first drilled hole, and discharging to the outside and removing a portion of the organic soil stratum inside the first drilled hole; and (b) a step for injecting a solidification agent into a second drilled hole, which is formed by drilling a portion below the first drilled hole, and mixing the solidification agent with silt to form a tail section, and injecting a solidification agent into a third drilled hole, which is formed by drilling and enlarging part of an upper portion of the first drilled hole and has a larger diameter than the second drilled hole, and mixing the solidification agent with silt to form a head section.
La présente invention concerne un procédé d'amélioration de terrain pour une strate de sol organique, dans lequel un sol organique à l'intérieur d'un premier trou foré formé dans une strate de sol organique située au niveau de la partie supérieure du sol est retiré, puis une fondation ponctuelle, qui comprend une section arrière formée dans une strate de limon inférieure et une section de tête ayant un diamètre étendu dans une partie supérieure de la strate de sol organique, est construite, ce qui permet d'obtenir une force de consolidation suffisante dans la fondation ponctuelle et une capacité de support suffisante dans la section de tête, et de permettre à la quantité de règlement d'être contrôlée par la section arrière. Le procédé d'amélioration de terrain pour une strate de sol organique de la présente invention est destiné à améliorer un terrain pauvre dans lequel la strate de sol organique est formée au-dessus d'une strate de limon inférieure. Le procédé est caractérisé en ce qu'il comprend : (a) une étape de forage de la strate de sol organique pour former un premier trou foré, et le vidage vers l'extérieur et l'élimination d'une partie de la strate de sol organique à l'intérieur du premier trou foré; et (b) une étape d'injection d'un agent de solidification dans un second trou foré, qui est formé par forage d'une partie au-dessous du premier trou foré, et le mélange de l'agent de solidification avec du limon pour former une section arrière, et l'injection d'un agent de solidification dans un troisième trou foré, qui est formé par forage et agrandissement d'une partie d'une partie supérieure du premier trou foré et qui a un diamètre plus grand que le second trou foré, et le mélange de l'agent de solidification avec du limon pour former une section de tête.
본 발명은 지반의 상부 부분에 위치하는 유기질토층에 형성된 제1천공홀 내 유기질토를 제거한 후 하부 토사층에 형성되는 테일부와 상부 유기질토층에 지름이 확대된 헤드부로 구성되는 포인트 기초를 시공함으로써, 포인트 기초의 고결 강도 및 헤드부의 지내력 확보가 가능하고, 테일부에 의해 침하량을 제어할 수 있는 유기질토층 지반 개량 방법에 대한 것이다. 본 발명 유기질토층 지반 개량 방법은 하부 토사층의 상부에 유기질토층이 형성된 연약지반을 개량하기 위한 것으로, (a) 유기질토층을 천공하여 제1천공홀을 형성하면서 제1천공홀 내 유기질토의 일부를 외부로 배토하여 제거하는 단계; 및 (b) 상기 제1천공홀의 하부를 천공하여 형성된 제2천공홀에 고화재를 주입하여 토사와 혼합함으로써 테일부를 형성하는 한편, 제1천공홀의 상부 일부를 확장 천공하여 제2천공홀보다 지름이 크게 형성된 제3천공홀에 고화재를 주입하여 토사와 혼합함으로써 헤드부를 형성하는 단계; 를 포함하여 구성되는 것을 특징으로 한다.
GROUND IMPROVEMENT METHOD FOR ORGANIC SOIL STRATUM
PROCÉDÉ D'AMÉLIORATION DE TERRAIN POUR STRATE DE SOL ORGANIQUE
유기질토층 지반 개량 방법
SONG KI YONG (author)
2020-09-17
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Grouting method for preventing stratum soil loss or ground surface settlement
European Patent Office | 2022
|Quality Improvement Through Soil Stratum in Non-mechanized Treatment System for Wastewater
Springer Verlag | 2019
|