METHOD FOR FILLING DEFORMABLE SOLUTION CAVE
A filling method for a deformable solution cave, the steps thereof being as follows: penetrating a grouting pipe (8) into an elastic silicone pipe (9), integrally penetrating same into a deformable support (6), and placing same into a solution cave; sealingly close the elastic silicone pipe (9), injecting a silicate resin material into the grouting pipe (8), and then injecting evenly-stirred steel fiber cement paste, so that a lower portion of the elastic silicone pipe (9) achieves a "block-like stone" structure (1); closing the elastic silicone pipe (9), shearing the elastic silicone pipe (9) and the deformable support (6), completing the separation of the formed "block-like stone" structure (1) from the elastic silicone pipe (9), and finishing the fabrication of the first "block-like stone" structure (1); lowering the elastic silicone pipe (9) and the deformable support (6) by 10 cm, closing the elastic silicone pipe (9), and then lowering the elastic silicone pipe and the deformable support (6) by 50 cm along the grouting pipe (8); and again finishing the fabrication of a "block-like stone" (1) structure, so as to complete the filling of a deformable solution cave.
L'invention concerne un procédé de remplissage pour une grotte de solution déformable, consistant : à faire pénétrer un tuyau de cimentation (8) dans un tuyau de silicone élastique (9), rentrant d'un seul tenant dans un support déformable (6), et à le placer dans une grotte de solution; à fermer hermétiquement le tuyau de silicone élastique (9), à injecter un matériau de résine de silicate dans le tuyau de cimentation (8), puis à injecter une pâte de ciment à fibres d'acier remuée uniformément, de sorte qu'une partie inférieure du tuyau de silicone élastique (9) atteigne une structure en "pierre de type bloc" (1); à fermer le tuyau de silicone élastique (9), à cisailler le tuyau de silicone élastique (9) et le support déformable (6), à achever la séparation de la structure en "pierre de type bloc" formée (1) du tuyau de silicone élastique (9), et à finir la fabrication de la première structure en "pierre de type bloc" (1); à abaisser le tuyau de silicone élastique (9) et le support déformable (6) de 10 cm, à fermer le tuyau de silicone élastique (9), puis à abaisser le tuyau de silicone élastique et le support déformable (6) de 50 cm le long du tuyau de cimentation (8); et à finir à nouveau la fabrication d'une structure en "pierre de type bloc" (1), de sorte à achever le remplissage d'une grotte de solution déformable.
一种可变形溶洞的填充方法,步骤为:将注浆管(8)穿入弹性硅胶管(9)之中,再整体穿入可变形支架(6)之中,再下放到溶洞内;封闭密封弹性硅胶管(9),向注浆管(8)注入硅酸盐树脂类材料,再注入搅拌均匀的钢纤维水泥浆使得弹性硅胶管(9)下部以实现"类块石"结构(1);密封弹性硅胶管(9),剪切弹性硅胶管(9)、可变形支架(6),完成将已形成的"类块石"结构(1)与弹性硅胶管(9)分离,制作完成第一块"类块石"结构(1);将弹性硅胶管(9)和可变形支架(6)下放10cm,密封弹性硅胶管(9),再将弹性硅胶管(9)和可变形支架(6)顺着注浆管(8)下放50cm;再次制作完成"类块石"结构(1),完成可变形溶洞的填充。
METHOD FOR FILLING DEFORMABLE SOLUTION CAVE
A filling method for a deformable solution cave, the steps thereof being as follows: penetrating a grouting pipe (8) into an elastic silicone pipe (9), integrally penetrating same into a deformable support (6), and placing same into a solution cave; sealingly close the elastic silicone pipe (9), injecting a silicate resin material into the grouting pipe (8), and then injecting evenly-stirred steel fiber cement paste, so that a lower portion of the elastic silicone pipe (9) achieves a "block-like stone" structure (1); closing the elastic silicone pipe (9), shearing the elastic silicone pipe (9) and the deformable support (6), completing the separation of the formed "block-like stone" structure (1) from the elastic silicone pipe (9), and finishing the fabrication of the first "block-like stone" structure (1); lowering the elastic silicone pipe (9) and the deformable support (6) by 10 cm, closing the elastic silicone pipe (9), and then lowering the elastic silicone pipe and the deformable support (6) by 50 cm along the grouting pipe (8); and again finishing the fabrication of a "block-like stone" (1) structure, so as to complete the filling of a deformable solution cave.
L'invention concerne un procédé de remplissage pour une grotte de solution déformable, consistant : à faire pénétrer un tuyau de cimentation (8) dans un tuyau de silicone élastique (9), rentrant d'un seul tenant dans un support déformable (6), et à le placer dans une grotte de solution; à fermer hermétiquement le tuyau de silicone élastique (9), à injecter un matériau de résine de silicate dans le tuyau de cimentation (8), puis à injecter une pâte de ciment à fibres d'acier remuée uniformément, de sorte qu'une partie inférieure du tuyau de silicone élastique (9) atteigne une structure en "pierre de type bloc" (1); à fermer le tuyau de silicone élastique (9), à cisailler le tuyau de silicone élastique (9) et le support déformable (6), à achever la séparation de la structure en "pierre de type bloc" formée (1) du tuyau de silicone élastique (9), et à finir la fabrication de la première structure en "pierre de type bloc" (1); à abaisser le tuyau de silicone élastique (9) et le support déformable (6) de 10 cm, à fermer le tuyau de silicone élastique (9), puis à abaisser le tuyau de silicone élastique et le support déformable (6) de 50 cm le long du tuyau de cimentation (8); et à finir à nouveau la fabrication d'une structure en "pierre de type bloc" (1), de sorte à achever le remplissage d'une grotte de solution déformable.
一种可变形溶洞的填充方法,步骤为:将注浆管(8)穿入弹性硅胶管(9)之中,再整体穿入可变形支架(6)之中,再下放到溶洞内;封闭密封弹性硅胶管(9),向注浆管(8)注入硅酸盐树脂类材料,再注入搅拌均匀的钢纤维水泥浆使得弹性硅胶管(9)下部以实现"类块石"结构(1);密封弹性硅胶管(9),剪切弹性硅胶管(9)、可变形支架(6),完成将已形成的"类块石"结构(1)与弹性硅胶管(9)分离,制作完成第一块"类块石"结构(1);将弹性硅胶管(9)和可变形支架(6)下放10cm,密封弹性硅胶管(9),再将弹性硅胶管(9)和可变形支架(6)顺着注浆管(8)下放50cm;再次制作完成"类块石"结构(1),完成可变形溶洞的填充。
METHOD FOR FILLING DEFORMABLE SOLUTION CAVE
PROCÉDÉ DE REMPLISSAGE DE GROTTE DE SOLUTION DÉFORMABLE
一种可变形溶洞的填充方法
ZHU BIN (author) / HAN LI (author) / XU ZHUANG (author) / WANG YANHUI (author) / LI JIANG (author) / LUO XIAOGANG (author) / WANG JIAN (author) / MENG DONG (author) / LI XIA (author) / WU KE (author)
2022-12-08
Patent
Electronic Resource
Chinese
IPC:
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
E02D
FOUNDATIONS
,
Gründungen
/
E21B
EARTH OR ROCK DRILLING
,
Erd- oder Gesteinsbohren
Carrier pile machine compaction karst cave filler and karst cave filling method
European Patent Office | 2020
|European Patent Office | 2021
|