A platform for research: civil engineering, architecture and urbanism
Method for filling deformable karst cave
The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a “block stone-like” structure; sealing the elastic silicone tube, separating the “block stone-like” structure from the elastic silicone tube to complete a “block stone-like” structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the “block stone-like” structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.
Method for filling deformable karst cave
The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a “block stone-like” structure; sealing the elastic silicone tube, separating the “block stone-like” structure from the elastic silicone tube to complete a “block stone-like” structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the “block stone-like” structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.
Method for filling deformable karst cave
WU KE (author) / LIU YAJUN (author) / DOU ZHONGYU (author) / LIU ZHENHUA (author) / LIU DAPENG (author) / XU WENBIN (author)
2024-03-19
Patent
Electronic Resource
English
Carrier pile machine compaction karst cave filler and karst cave filling method
European Patent Office | 2020
|European Patent Office | 2021
|European Patent Office | 2020
|