METHOD FOR ERECTING CONTINUOUS STEEL TRUSS BRIDGE
The present invention relates to the technical field of bridge erection, and provides a method for erecting a continuous steel truss bridge. The method for erecting a continuous steel truss bridge comprises: constructing a main substructure and a rotation structure, and mounting a pier-top steel girder on a pier-side support by means of a tower crane; symmetrically hoisting a preset number of steel girder sections along two sides of the pier-top steel girder by means of the tower crane, and hoisting in place a temporary erection tower on the pier-top steel girder; hoisting in place a temporary support tower at the top of the temporary erection tower by means of the tower crane, and hoisting in place two bridge deck cranes by means of the tower crane; symmetrically and synchronously hoisting the remaining steel girder sections by means of the two bridge deck cranes, and at the same time, hanging temporary cables at corresponding positions and tensioning same; and removing unnecessary construction loads on a bridge deck, and after the bridge body reaches a balanced state, performing rotation construction. Compared with the prior art, by synchronously and symmetrically erecting steel girder sections along two sides of a middle pier, the present invention has low requirements for construction errors, thereby improving the erection efficiency of continuous steel truss bridges.
La présente invention se rapporte au domaine technique du montage de ponts et concerne un procédé de montage d'un pont à treillis continu en acier. Le procédé de montage d'un pont à treillis continu en acier consiste à : construire une sous-structure principale et une structure de rotation, et monter une poutre d'acier supérieure de pilier sur un support côté pilier au moyen d'une grue à tour ; hisser de façon symétrique un nombre prédéfini de sections de poutre d'acier le long de deux côtés de la poutre d'acier supérieure de pilier au moyen de la grue à tour, et hisser en place une tour de montage temporaire sur la poutre d'acier supérieure de pilier ; hisser en place une tour de support temporaire au sommet de la tour de montage temporaire au moyen de la grue à tour, et hisser en place deux grues à tablier de pont au moyen de la grue à tour ; hisser de façon symétrique et synchrone les sections de poutre d'acier restantes au moyen des deux grues de tablier de pont et en même temps, suspendre des câbles temporaires à des positions correspondantes et tendre ceux-ci ; et éliminer les charges de construction inutiles sur un tablier de pont, et après que le corps de pont a atteint un état équilibré, effectuer une construction de rotation. Par rapport à l'état de la technique, grâce au montage synchrone et symétrique de sections de poutre d'acier le long de deux côtés d'un pilier intermédiaire, la présente invention présente de faibles exigences en matière d'erreurs de construction, ce qui permet d'améliorer l'efficacité de montage de ponts à treillis continu en acier.
本发明提供了一种连续钢桁梁桥的架设方法,涉及桥梁架设技术领域,连续钢桁梁桥的架设方法包括施工桥下主体结构以及转体结构,通过塔吊在墩旁支架的上方安装墩顶钢梁;通过塔吊沿墩顶钢梁两侧对称吊装预设数量的钢梁节段,并且在墩顶钢梁上方吊装临时扣塔;通过塔吊在临时扣塔的顶部吊装扣锁塔架,并且通过塔吊吊装两台桥面吊机;通过两台桥面吊机对称同步吊装剩余钢梁节段,并且同时挂设相应位置的临时扣锁并进行张拉;清除桥面不必要的施工载荷,待桥体达到平衡状态后进行转体施工。本发明相比于现有技术,采用沿中墩两侧同步对称架设钢梁节段的方式,对施工误差的要求较低,提高了连续钢桁梁桥的架设效率。
METHOD FOR ERECTING CONTINUOUS STEEL TRUSS BRIDGE
The present invention relates to the technical field of bridge erection, and provides a method for erecting a continuous steel truss bridge. The method for erecting a continuous steel truss bridge comprises: constructing a main substructure and a rotation structure, and mounting a pier-top steel girder on a pier-side support by means of a tower crane; symmetrically hoisting a preset number of steel girder sections along two sides of the pier-top steel girder by means of the tower crane, and hoisting in place a temporary erection tower on the pier-top steel girder; hoisting in place a temporary support tower at the top of the temporary erection tower by means of the tower crane, and hoisting in place two bridge deck cranes by means of the tower crane; symmetrically and synchronously hoisting the remaining steel girder sections by means of the two bridge deck cranes, and at the same time, hanging temporary cables at corresponding positions and tensioning same; and removing unnecessary construction loads on a bridge deck, and after the bridge body reaches a balanced state, performing rotation construction. Compared with the prior art, by synchronously and symmetrically erecting steel girder sections along two sides of a middle pier, the present invention has low requirements for construction errors, thereby improving the erection efficiency of continuous steel truss bridges.
La présente invention se rapporte au domaine technique du montage de ponts et concerne un procédé de montage d'un pont à treillis continu en acier. Le procédé de montage d'un pont à treillis continu en acier consiste à : construire une sous-structure principale et une structure de rotation, et monter une poutre d'acier supérieure de pilier sur un support côté pilier au moyen d'une grue à tour ; hisser de façon symétrique un nombre prédéfini de sections de poutre d'acier le long de deux côtés de la poutre d'acier supérieure de pilier au moyen de la grue à tour, et hisser en place une tour de montage temporaire sur la poutre d'acier supérieure de pilier ; hisser en place une tour de support temporaire au sommet de la tour de montage temporaire au moyen de la grue à tour, et hisser en place deux grues à tablier de pont au moyen de la grue à tour ; hisser de façon symétrique et synchrone les sections de poutre d'acier restantes au moyen des deux grues de tablier de pont et en même temps, suspendre des câbles temporaires à des positions correspondantes et tendre ceux-ci ; et éliminer les charges de construction inutiles sur un tablier de pont, et après que le corps de pont a atteint un état équilibré, effectuer une construction de rotation. Par rapport à l'état de la technique, grâce au montage synchrone et symétrique de sections de poutre d'acier le long de deux côtés d'un pilier intermédiaire, la présente invention présente de faibles exigences en matière d'erreurs de construction, ce qui permet d'améliorer l'efficacité de montage de ponts à treillis continu en acier.
本发明提供了一种连续钢桁梁桥的架设方法,涉及桥梁架设技术领域,连续钢桁梁桥的架设方法包括施工桥下主体结构以及转体结构,通过塔吊在墩旁支架的上方安装墩顶钢梁;通过塔吊沿墩顶钢梁两侧对称吊装预设数量的钢梁节段,并且在墩顶钢梁上方吊装临时扣塔;通过塔吊在临时扣塔的顶部吊装扣锁塔架,并且通过塔吊吊装两台桥面吊机;通过两台桥面吊机对称同步吊装剩余钢梁节段,并且同时挂设相应位置的临时扣锁并进行张拉;清除桥面不必要的施工载荷,待桥体达到平衡状态后进行转体施工。本发明相比于现有技术,采用沿中墩两侧同步对称架设钢梁节段的方式,对施工误差的要求较低,提高了连续钢桁梁桥的架设效率。
METHOD FOR ERECTING CONTINUOUS STEEL TRUSS BRIDGE
PROCÉDÉ DE MONTAGE D'UN PONT À TREILLIS CONTINU EN ACIER
一种连续钢桁梁桥的架设方法
ZHU DONGMING (author) / LIANG HUI (author) / HUANG XINGYU (author) / WANG YUANGEN (author) / YU WEIJIE (author) / LONG YUYI (author) / ZHANG YANHUI (author) / XIA CHAOJUAN (author) / LI FENG (author) / SU YAN (author)
2024-07-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Method for erecting curved steel truss cable-stayed bridge
European Patent Office | 2023
|METHOD FOR ERECTING CURVED STEEL TRUSS CABLE-STAYED BRIDGE
European Patent Office | 2024
|European Patent Office | 2023
|